blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1217019

EP1217019 - Process for preparing polyurethane soft foams [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  09.05.2008
Database last updated on 02.08.2024
Most recent event   Tooltip09.05.2008Withdrawal of applicationpublished on 11.06.2008  [2008/24]
Applicant(s)For all designated states
BASF SE
Carl-Bosch-Strasse 38
67056 Ludwigshafen am Rhein / DE
[N/P]
Former [2008/10]For all designated states
BASF SE
67056 Ludwigshafen / DE
Former [2002/26]For all designated states
BASF AKTIENGESELLSCHAFT
67056 Ludwigshafen / DE
Inventor(s)01 / Falke, Peter, Dr.
Gefluderstrasse 44
01987 Schwarzheide / DE
 [2002/26]
Application number, filing date01126659.008.11.2001
[2002/26]
Priority number, dateDE200016319419.12.2000         Original published format: DE 10063194
[2002/26]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1217019
Date:26.06.2002
Language:DE
[2002/26]
Search report(s)(Supplementary) European search report - dispatched on:EP15.04.2002
ClassificationIPC:C08G18/40
[2002/26]
CPC:
C08G18/4018 (EP); C08G2110/0008 (EP); C08G2110/0083 (EP)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2002/26]
TitleGerman:Verfahren zur Herstellung von Polyurethanweichschaumstoffen[2002/26]
English:Process for preparing polyurethane soft foams[2002/26]
French:Procédé de préparation de mousses souples de polyuréthane[2002/26]
Examination procedure17.05.2002Examination requested  [2002/29]
12.07.2004Despatch of a communication from the examining division (Time limit: M04)
30.10.2004Reply to a communication from the examining division
15.09.2005Despatch of a communication from the examining division (Time limit: M04)
05.11.2005Reply to a communication from the examining division
20.02.2008Despatch of a communication from the examining division (Time limit: M04)
06.05.2008Application withdrawn by applicant  [2008/24]
Fees paidRenewal fee
01.12.2003Renewal fee patent year 03
30.11.2004Renewal fee patent year 04
30.11.2005Renewal fee patent year 05
30.11.2006Renewal fee patent year 06
30.11.2007Renewal fee patent year 07
31.03.2008Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]DE4001044  (ELASTOGRAN POLYURETHANE GMBH [DE]) [X] 1,4,6 * example 1 *;
 [X]DE19746365  (BASF AG [DE]) [X] 1-3,7-9,11 * example 2 *;
 [X]DE19629161  (BASF AG [DE]) [X] 1,2,7 * example 1 *;
 [A]EP1035146  (BAYER AG [DE]) [A] 1,7-11 * page 5, line 15 - page 7, line 9 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.