Extract from the Register of European Patents

EP About this file: EP1341663

EP1341663 - MATERIAL PROCESSING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  29.12.2006
Database last updated on 26.03.2026
Most recent event   Tooltip11.09.2009Lapse of the patent in a contracting state
New state(s): TR
published on 14.10.2009  [2009/42]
Applicant(s)For all designated states
BRUNEL UNIVERSITY
Uxbridge
Middlesex, UB8 3PH / GB
[2003/37]
Inventor(s)01 / HORNSBY, Peter, Ridsdale, c/o Brunel University
Uxbridge, Middlesex UB8 3PH / GB
02 / MATTHEWS, Siobhan, Olive, c/o Reg. Developm. Ctr
Dundalk Institute of Technology
Dublin Road, Dundalk, Co.Louth / IE
 [2003/46]
Former [2003/37]01 / HORNSBY, Peter, Ridsdale, c/o Brunel University
Uxbridge, Middlesex UB8 3PH / GB
02 / MATTHEWS, Siobhan, Olive, c/o Brunel University
Uxbridge, Middlesex UB8 3PH / GB
Representative(s)Jehan, Robert, et al
Williams Powell
44 Prospect Place
Bromley, Kent BR2 9HN / GB
[N/P]
Former [2003/37]Jehan, Robert, et al
Williams Powell Morley House 26-30 Holborn Viaduct
London EC1A 2BP / GB
Application number, filing date01270419.311.12.2001
[2003/37]
WO2001GB05489
Priority number, dateGB2000003018211.12.2000         Original published format: GB 0030182
[2003/37]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO0247893
Date:20.06.2002
Language:EN
[2002/25]
Type: A1 Application with search report 
No.:EP1341663
Date:10.09.2003
Language:EN
The application published by WIPO in one of the EPO official languages on 20.06.2002 takes the place of the publication of the European patent application.
[2003/37]
Type: B1 Patent specification 
No.:EP1341663
Date:22.02.2006
Language:EN
[2006/08]
Search report(s)International search report - published on:EP20.06.2002
ClassificationIPC:B29C67/00
[2003/37]
CPC:
C04B40/0028 (EP,US); B29C67/00 (KR); B01J3/008 (EP,US);
B22F3/222 (EP,US); B29C44/348 (EP,US); B29C45/0013 (EP,US);
B29C48/92 (EP,US); B29C2045/1702 (EP,US); B29C2045/1722 (EP,US);
B29C2045/466 (EP,US); B29C2948/922 (EP,US); B29C2948/92514 (EP,US);
B29C2948/9259 (EP,US); B29C2948/926 (EP,US); B29C2948/92685 (EP,US);
B29C2948/92695 (EP,US); B29C2948/92704 (EP,US); B29C2948/92723 (EP,US);
B29C2948/92876 (EP,US); B29C2948/92885 (EP,US); B29C48/03 (EP,US) (-)
C-Set:
C04B40/0028, C04B2103/007 (EP,US)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2003/37]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
SINot yet paid
TitleGerman:MATERIALVERARBEITUNG[2003/37]
English:MATERIAL PROCESSING[2003/37]
French:TRAITEMENT DE MATERIAU[2003/37]
Entry into regional phase10.06.2003National basic fee paid 
10.06.2003Designation fee(s) paid 
10.06.2003Examination fee paid 
Examination procedure27.06.2002Request for preliminary examination filed
International Preliminary Examining Authority: EP
10.06.2003Amendment by applicant (claims and/or description)
10.06.2003Examination requested  [2003/37]
28.12.2004Despatch of a communication from the examining division (Time limit: M04)
04.04.2005Reply to a communication from the examining division
27.07.2005Communication of intention to grant the patent
28.11.2005Fee for grant paid
28.11.2005Fee for publishing/printing paid
Opposition(s)23.11.2006No opposition filed within time limit [2007/05]
Fees paidRenewal fee
27.10.2003Renewal fee patent year 03
18.10.2004Renewal fee patent year 04
14.12.2005Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT22.02.2006
BE22.02.2006
CH22.02.2006
CY22.02.2006
FI22.02.2006
LI22.02.2006
TR22.02.2006
DK22.05.2006
SE22.05.2006
GR23.05.2006
PT24.07.2006
[2009/42]
Former [2009/03]AT22.02.2006
BE22.02.2006
CH22.02.2006
CY22.02.2006
FI22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
GR23.05.2006
PT24.07.2006
Former [2008/19]AT22.02.2006
BE22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
GR23.05.2006
PT24.07.2006
Former [2007/45]AT22.02.2006
BE22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
PT24.07.2006
Former [2007/36]AT22.02.2006
BE22.02.2006
CH22.02.2006
FI22.02.2006
IT22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
PT24.07.2006
Former [2007/13]AT22.02.2006
BE22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
PT24.07.2006
Former [2007/09]AT22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
PT24.07.2006
Former [2006/51]AT22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
DK22.05.2006
SE22.05.2006
Former [2006/46]AT22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
SE22.05.2006
Former [2006/43]AT22.02.2006
CH22.02.2006
FI22.02.2006
LI22.02.2006
Former [2006/42]CH22.02.2006
FI22.02.2006
LI22.02.2006
Former [2006/36]FI22.02.2006
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.