blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1322690

EP1322690 - COATING SYSTEM FOR PRODUCING COLOR- AND/OR EFFECT-IMPARTING MULTILAYER COATINGS ON THE BASIS OF MULTI-COMPONENT COATING MATERIALS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.02.2015
Database last updated on 18.10.2024
Most recent event   Tooltip15.07.2016Lapse of the patent in a contracting state
New state(s): TR
published on 17.08.2016  [2016/33]
Applicant(s)For all designated states
BASF Coatings GmbH
Glasuritstrasse 1
48165 Münster / DE
[2010/16]
Former [2008/31]For all designated states
BASF Coatings AG
Glasuritstrasse 1
48165 Münster / DE
Former [2007/41]For all designated states
BASF Coatings AG
Glasuritstr. 1
48165 Münster / DE
Former [2003/27]For all designated states
BASF Coatings Aktiengesellschaft
Glasuritstrasse 1
48165 Münster / DE
Inventor(s)01 / LETTMANN, Bernhard
Heineweg 2
48317 Drensteinfurt / DE
02 / NIENHAUS, Egbert
Geiststr. 16
59387 Ascheberg / DE
 [2003/27]
Representative(s)Steffan & Kiehne Patentanwälte PartG mbB
Burgplatz 21-22
40213 Düsseldorf / DE
[N/P]
Former [2014/15]Leifert & Steffan
Patentanwälte Burgplatz 21-22
40213 Düsseldorf / DE
Former [2008/40]Leifert & Steffan
Patentanwälte Postfach 10 40 09
40031 Düsseldorf / DE
Former [2007/41]Leifert & Steffan
Patentanwälte Burgplatz 21-22
40213 Düsseldorf / DE
Former [2006/33](deleted)
Former [2003/27]Fitzner, Uwe, Dr., et al
Lintorfer Strasse 10
40878 Ratingen / DE
Application number, filing date01982353.326.09.2001
[2003/27]
WO2001EP11105
Priority number, dateDE2000104867030.09.2000         Original published format: DE 10048670
[2003/27]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO0228938
Date:11.04.2002
Language:DE
[2002/15]
Type: A1 Application with search report 
No.:EP1322690
Date:02.07.2003
Language:DE
The application published by WIPO in one of the EPO official languages on 11.04.2002 takes the place of the publication of the European patent application.
[2003/27]
Type: B1 Patent specification 
No.:EP1322690
Date:09.04.2014
Language:DE
[2014/15]
Search report(s)International search report - published on:EP11.04.2002
ClassificationIPC:C08G18/81, C08G18/67, C09D175/16
[2003/27]
CPC:
C08G18/631 (EP,US); C08G18/622 (EP,US); C09D175/04 (EP,US);
C09D175/16 (EP,US)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2003/27]
TitleGerman:BESCHICHTUNGSSTOFFSYSTEM FÜR DIE HERSTELLUNG FARB- UND/ODER EFFEKTGEBENDER MEHRSCHICHTLACKIERUNGEN AUF DER BASIS VON MEHRKOMPONENTENBESCHICHTUNGSSTOFFEN[2003/27]
English:COATING SYSTEM FOR PRODUCING COLOR- AND/OR EFFECT-IMPARTING MULTILAYER COATINGS ON THE BASIS OF MULTI-COMPONENT COATING MATERIALS[2003/27]
French:SYSTEME D'AGENTS DE REVETEMENT PERMETTANT LA REALISATION DE PEINTURES MULTICOUCHES DE COLORATION ET/OU A EFFETS, SE BASANT SUR DES AGENT DE REVETEMENT A CONSTITUANTS MULTIPLES[2003/27]
Entry into regional phase21.01.2003National basic fee paid 
21.01.2003Designation fee(s) paid 
21.01.2003Examination fee paid 
Examination procedure11.04.2002Request for preliminary examination filed
International Preliminary Examining Authority: EP
21.01.2003Examination requested  [2003/27]
19.01.2009Despatch of a communication from the examining division (Time limit: M04)
28.05.2009Reply to a communication from the examining division
31.10.2013Communication of intention to grant the patent
26.02.2014Fee for grant paid
26.02.2014Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.01.2009
Opposition(s)12.01.2015No opposition filed within time limit [2015/12]
Fees paidRenewal fee
18.09.2003Renewal fee patent year 03
27.08.2004Renewal fee patent year 04
14.09.2005Renewal fee patent year 05
11.09.2006Renewal fee patent year 06
12.09.2007Renewal fee patent year 07
15.09.2008Renewal fee patent year 08
11.09.2009Renewal fee patent year 09
30.09.2010Renewal fee patent year 10
30.09.2011Renewal fee patent year 11
01.10.2012Renewal fee patent year 12
30.09.2013Renewal fee patent year 13
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY09.04.2014
DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
TR09.04.2014
GR10.07.2014
PT11.08.2014
AT26.09.2014
IE26.09.2014
LU26.09.2014
BE30.09.2014
CH30.09.2014
LI30.09.2014
[2016/33]
Former [2016/31]CY09.04.2014
DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
AT26.09.2014
IE26.09.2014
LU26.09.2014
BE30.09.2014
CH30.09.2014
LI30.09.2014
Former [2016/12]DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
AT26.09.2014
IE26.09.2014
LU26.09.2014
BE30.09.2014
CH30.09.2014
LI30.09.2014
Former [2015/37]DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
IE26.09.2014
LU26.09.2014
BE30.09.2014
CH30.09.2014
LI30.09.2014
Former [2015/33]DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
LU26.09.2014
BE30.09.2014
CH30.09.2014
LI30.09.2014
Former [2015/30]DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
LU26.09.2014
BE30.09.2014
Former [2015/22]DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
LU26.09.2014
Former [2015/20]DK09.04.2014
FI09.04.2014
MC09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
Former [2015/08]DK09.04.2014
FI09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
Former [2015/02]FI09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
PT11.08.2014
Former [2014/50]FI09.04.2014
NL09.04.2014
SE09.04.2014
GR10.07.2014
Former [2014/49]FI09.04.2014
Cited inInternational search[A]US4342793  (SKINNER EARL, et al) [A] 1-14* claims 1,3,6-9 *;
 [A]EP0928800  (BAYER AG [DE]) [A] 1-14 * in der Anmeldung erwähnt; page 2, line 47 - page 3, line 21; example 2; claims 1,2,8 *;
 [A]EP0952170  (BAYER AG [DE]) [A] 1-14 * page 5, line 3 - line 5; claims 1-3,7,8 *;
 [A]DE19818735  (HERBERTS GMBH [DE]) [A] 1-14 * column 2, line 48 - column 3, line 6; claims 1,8,9 * * in der Anmeldung erwähnt *;
 [X]DE19860041  (BASF AG [DE]) [X] 1-14 * page 2, line 65 - page 3, line 1 * * page 5, line 49 - page 7, line 19; example 3; claims 1,2,7,11,12,12,20; tables 1,2 * * page 4, line 68 - page 5, line 3 *
ExaminationWO0226853
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.