blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1251000

EP1251000 - Metal-composite hose and a process for manufacturing the same [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.04.2008
Database last updated on 14.09.2024
Most recent event   Tooltip11.04.2008No opposition filed within time limitpublished on 14.05.2008  [2008/20]
Applicant(s)For all designated states
TOKAI RUBBER INDUSTRIES, LTD.
1, Higashi 3-chome Komaki-shi
Aichi-ken, 485-8550 / JP
[2007/23]
Former [2002/43]For all designated states
Tokai Rubber Industries, Ltd.
1, Higashi 3-chome
Komaki-shi, Aichi-ken, 485-8550 / JP
Inventor(s)01 / Katayama, Kazutaka
460-1 Muranaka
Komaki-shi, Aichi-ken, 485-0082 / JP
02 / Hibino, Motoshige
TD-205 3-1 Higashi
Komaki-shi, Aichi-ken, 485-0831 / JP
03 / Miyajima, Atsuo
10-12 Kamimaekawahara, Haguro
Inuyama-shi, Aichi-ken, 484-0894 / JP
04 / Ito, Hiroaki
7-3-30 Fujiyamadai
Kasugai-shi, Aichi-ken, 487-0035 / JP
 [2002/43]
Representative(s)Kuhnen & Wacker Patent- und Rechtsanwaltsbüro PartG mbB
Prinz-Ludwig-Straße 40A
85354 Freising / DE
[N/P]
Former [2002/43]Kuhnen & Wacker
Patentanwaltsgesellschaft mbH, Prinz-Ludwig-Strasse 40A
85354 Freising / DE
Application number, filing date02008739.118.04.2002
[2002/43]
Priority number, dateJP2001012052819.04.2001         Original published format: JP 2001120528
[2002/43]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1251000
Date:23.10.2002
Language:EN
[2002/43]
Type: A3 Search report 
No.:EP1251000
Date:23.04.2003
[2003/17]
Type: B1 Patent specification 
No.:EP1251000
Date:06.06.2007
Language:EN
[2007/23]
Search report(s)(Supplementary) European search report - dispatched on:EP10.03.2003
ClassificationIPC:B32B1/08, B32B15/08, F16L11/04
[2003/17]
CPC:
B32B1/08 (EP,US); B32B15/08 (EP,US); F16L11/15 (EP,US);
B32B2597/00 (US); Y10T428/1355 (EP,US)
Former IPC [2002/43]B32B1/08, B32B15/08
Designated contracting statesFR [2004/03]
Former [2002/43]AT,  BE,  CH,  CY,  DE,  DK,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE,  TR 
TitleGerman:Metallverbundschlauch und Verfahren zu seiner Herstellung[2002/43]
English:Metal-composite hose and a process for manufacturing the same[2002/43]
French:Tuyau composite en métal et procédé de fabrication[2002/43]
Examination procedure05.08.2003Examination requested  [2003/40]
21.10.2003Despatch of a communication from the examining division (Time limit: M04)
03.02.2004Loss of particular rights, legal effect: designated state(s)
26.02.2004Reply to a communication from the examining division
27.04.2004Despatch of communication of loss of particular rights: designated state(s) AT, BE, CH, CY, DE, DK, ES, FI, GB, GR, IE, IT, LU, MC, NL, PT, SE, TR
30.06.2005Despatch of a communication from the examining division (Time limit: M06)
29.12.2005Reply to a communication from the examining division
06.10.2006Communication of intention to grant the patent
13.02.2007Fee for grant paid
13.02.2007Fee for publishing/printing paid
Opposition(s)07.03.2008No opposition filed within time limit [2008/20]
Fees paidRenewal fee
21.04.2004Renewal fee patent year 03
29.04.2005Renewal fee patent year 04
21.03.2006Renewal fee patent year 05
19.04.2007Renewal fee patent year 06
Penalty fee
Penalty fee Rule 85a EPC 1973
23.12.2003AT   M01   Not yet paid
23.12.2003BE   M01   Not yet paid
23.12.2003CH   M01   Not yet paid
23.12.2003CY   M01   Not yet paid
23.12.2003DE   M01   Not yet paid
23.12.2003DK   M01   Not yet paid
23.12.2003ES   M01   Not yet paid
23.12.2003FI   M01   Not yet paid
23.12.2003GB   M01   Not yet paid
23.12.2003GR   M01   Not yet paid
23.12.2003IE   M01   Not yet paid
23.12.2003IT   M01   Not yet paid
23.12.2003LU   M01   Not yet paid
23.12.2003MC   M01   Not yet paid
23.12.2003NL   M01   Not yet paid
23.12.2003PT   M01   Not yet paid
23.12.2003SE   M01   Not yet paid
23.12.2003TR   M01   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]US4781958  (GILBERT RONALD E [US]) [A] 1,2 * column 2, line 24 - line 38 ** figure 3 *;
 [X]US4999903  (BUJES GEORGES [CH]) [X] 1,3-6 * column 3, line 24 - line 32 * * column 4, line 34 - line 55 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.