blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1293639

EP1293639 - Burglary-preventing frame [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.04.2016
Database last updated on 14.06.2024
Most recent event   Tooltip13.10.2017Lapse of the patent in a contracting state
New state(s): BE, CY, NL, SE, TR
published on 15.11.2017  [2017/46]
Applicant(s)For all designated states
Sapa AS
Biskop Gunnerusgate 14
0185 Oslo / NO
[2014/45]
Former [2003/12]For all designated states
NORSK HYDRO ASA
Bygdoy Allé 2
0257 Oslo 2 / NO
Inventor(s)01 / Götz, Peter
Von-Volmar-Strasse 7
89335 Ichenhausen / DE
 [2003/12]
Representative(s)Dziewior, Joachim, et al
Ensingerstrasse 21
89073 Ulm / DE
[2015/22]
Former [2003/12]Dziewior, Joachim, Dipl.-Phys. Dr., et al
Ensingerstrasse 21
89073 Ulm / DE
Application number, filing date02020623.113.09.2002
[2003/12]
Priority number, dateDE200114561615.09.2001         Original published format: DE 10145616
[2003/12]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1293639
Date:19.03.2003
Language:DE
[2003/12]
Type: A3 Search report 
No.:EP1293639
Date:07.01.2004
[2004/02]
Type: B1 Patent specification 
No.:EP1293639
Date:27.05.2015
Language:DE
[2015/22]
Search report(s)(Supplementary) European search report - dispatched on:EP21.11.2003
ClassificationIPC:E06B5/11, E06B3/54
[2003/12]
CPC:
E06B5/116 (EP); E06B3/26303 (EP); E06B3/5409 (EP);
E06B3/5871 (EP); E06B3/62 (EP); E06B2003/6244 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SK,   TR [2015/22]
Former [2003/12]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  SE,  SK,  TR 
TitleGerman:Einbruchhemmender Rahmen[2003/12]
English:Burglary-preventing frame[2003/12]
French:Encadrement anti-effraction[2003/12]
Examination procedure08.01.2004Examination requested  [2004/12]
18.12.2006Despatch of a communication from the examining division (Time limit: M06)
28.06.2007Reply to a communication from the examining division
20.12.2010Despatch of a communication from the examining division (Time limit: M06)
30.06.2011Reply to a communication from the examining division
24.11.2014Cancellation of oral proceeding that was planned for 19.12.2014
19.12.2014Date of oral proceedings (cancelled)
05.01.2015Communication of intention to grant the patent
13.04.2015Fee for grant paid
13.04.2015Fee for publishing/printing paid
13.04.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.12.2006
Opposition(s)01.03.2016No opposition filed within time limit [2016/18]
Fees paidRenewal fee
28.12.2004Renewal fee patent year 03
14.09.2005Renewal fee patent year 04
14.09.2006Renewal fee patent year 05
13.09.2007Renewal fee patent year 06
11.09.2008Renewal fee patent year 07
23.09.2009Renewal fee patent year 08
27.09.2010Renewal fee patent year 09
22.09.2011Renewal fee patent year 10
20.09.2012Renewal fee patent year 11
20.09.2013Renewal fee patent year 12
26.09.2014Renewal fee patent year 13
Penalty fee
Additional fee for renewal fee
30.09.200403   M06   Fee paid on   28.12.2004
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY27.05.2015
CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
MC27.05.2015
NL27.05.2015
SE27.05.2015
SK27.05.2015
TR27.05.2015
BG27.08.2015
GR28.08.2015
AT13.09.2015
GB13.09.2015
IE13.09.2015
LU13.09.2015
PT28.09.2015
BE30.09.2015
CH30.09.2015
FR30.09.2015
LI30.09.2015
[2017/40]
Former [2017/17]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
MC27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
AT13.09.2015
GB13.09.2015
IE13.09.2015
LU13.09.2015
PT28.09.2015
CH30.09.2015
FR30.09.2015
LI30.09.2015
Former [2016/36]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
MC27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
GB13.09.2015
IE13.09.2015
LU13.09.2015
PT28.09.2015
CH30.09.2015
FR30.09.2015
LI30.09.2015
Former [2016/34]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
MC27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
GB13.09.2015
IE13.09.2015
LU13.09.2015
PT28.09.2015
CH30.09.2015
LI30.09.2015
Former [2016/33]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
MC27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
IE13.09.2015
LU13.09.2015
PT28.09.2015
CH30.09.2015
LI30.09.2015
Former [2016/23]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
MC27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
LU13.09.2015
PT28.09.2015
Former [2016/21]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
IT27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
LU13.09.2015
PT28.09.2015
Former [2016/10]CZ27.05.2015
DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
SK27.05.2015
BG27.08.2015
GR28.08.2015
PT28.09.2015
Former [2016/09]DK27.05.2015
EE27.05.2015
ES27.05.2015
FI27.05.2015
BG27.08.2015
GR28.08.2015
PT28.09.2015
Former [2016/07]DK27.05.2015
ES27.05.2015
FI27.05.2015
BG27.08.2015
GR28.08.2015
PT28.09.2015
Former [2015/50]ES27.05.2015
FI27.05.2015
BG27.08.2015
GR28.08.2015
PT28.09.2015
Former [2015/49]ES27.05.2015
FI27.05.2015
GR28.08.2015
PT28.09.2015
Documents cited:Search[XY]DE2044299  (HEINZ SCHÜRMANN & CO) [X] 1-4,8,9,11,14 * the whole document * [Y] 10;
 [YA]GB2051197  (BLACKNELL BUILDINGS LTD) [Y] 7 * the whole document * [A] 1,4,5,9,11;
 [XY]EP0400374  (NIEMANN HANS DIETER [DE]) [X] 1-3,5 * the whole document * [Y] 7;
 [Y]US5036637  (BIEBUYCK LAWRENCE [US]) [Y] 15 * column 6, line 5 - line 42 * * column 7, line 61 - column 8, line 3 ** figures 3,4 *;
 [XY]DE29520518U  (KRETSCHMER CORNELIA [DE]) [X] 1,4,14,16 * page 6, line 20 - page 9, line 3; figure - * [Y] 15;
 [X]GB2295844  (CHATTIN PETER JOHN [GB]) [X] 1,4,8,9 * page 8, line 5 - page 15, line 7; figure - *;
 [XY]DE19956441  (SCHMITZ WERNER [DE]) [X] 1,5,6,8,11 * column 2, line 37 - column 3, line 63; figure - * [Y] 10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.