blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1309124

EP1309124 - CIM Gateway for the supervision and control of telecommunication networks [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  17.08.2007
Database last updated on 03.09.2024
Most recent event   Tooltip17.08.2007Application deemed to be withdrawnpublished on 19.09.2007  [2007/38]
Applicant(s)For all designated states
Alcatel Lucent
54, rue la Boétie
75008 Paris / FR
[N/P]
Former [2007/14]For all designated states
Alcatel Lucent
54 rue La Boétie
75008 Paris / FR
Former [2003/19]For all designated states
ALCATEL
54, rue la Boétie
75008 Paris / FR
Inventor(s)01 / Toure, Famory
25 Résidence du Parc
91300 Massy / FR
02 / Robinson, Julien
35 Rue Beaunier
75014 Paris / FR
 [2003/19]
Representative(s)Chaffraix, Sylvain, et al
Alcatel Lucent
Intellectual Property & Standards
54 Rue La Boétie
75008 Paris / FR
[N/P]
Former [2003/19]Chaffraix, Sylvain, et al
Compagnie Financière Alcatel Département de Propriété Industrielle, 5, rue Noel Pons
92734 Nanterre Cedex / FR
Application number, filing date02292639.824.10.2002
[2003/19]
Priority number, dateFR2001001417031.10.2001         Original published format: FR 0114170
[2003/19]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1309124
Date:07.05.2003
Language:FR
[2003/19]
Search report(s)(Supplementary) European search report - dispatched on:EP20.02.2003
ClassificationIPC:H04L12/24
[2003/19]
CPC:
H04L41/00 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SK,   TR [2003/19]
TitleGerman:CIM Netzübergangseinrichtung für die Überwachung und Steuerung von Telekommunikationsnetzen[2003/19]
English:CIM Gateway for the supervision and control of telecommunication networks[2003/19]
French:Passerelle CIM pour la supervision et le contrôle de réseaux de télécommunication[2003/19]
Examination procedure07.11.2003Examination requested  [2004/02]
09.11.2006Despatch of a communication from the examining division (Time limit: M04)
20.03.2007Application deemed to be withdrawn, date of legal effect  [2007/38]
25.04.2007Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2007/38]
Fees paidRenewal fee
07.10.2004Renewal fee patent year 03
25.10.2005Renewal fee patent year 04
13.10.2006Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]EP1061445  (SUN MICROSYSTEMS INC [US]) [A] 1-4 * abstract * * page 2, column 1, line 31 - line 50 * * page 4, column 5, line 45 - page 5, column 7, line 27; figure 2 * * page 5, column 8, line 3 - line 15 * * page 6, column 10, line 28 - line 39; figure 6 *;
 [A]EP1103881  (EVIDIAN [FR]) [A] 1-4 * abstract * * page 4, line 24 - page 5, line 53; figures 1,2 * * page 6, line 44 - line 56 * * page 7, line 32 - line 33 *;
 [X]  - JENS AXELSSON, "Supervision of computer equipment in ABB OperateIT using WMI", MASTER THESIS LUND INSTITUTE OF TECHNOLOGY, Lund, Sweden, (200010), pages i-iiii - 1-69, URL: http://www.control.lth.se/publications/msc/2000/documents/5655.pdf, (20020708), XP002205092 [X] 1-4 * abstract * * page 5 * * page 7, paragraph 1.2 * * page 14, paragraph 3 - page 19 * * Fin alinéa 4.1 "single unified standard protocol in this case xmlCIM"; page 21, paragraph 4 - page 27 * * page 34, paragraph 5.3.3 * * page 54, paragraph 8.4 *
 [A]  - "OperateIT Product Overview", ABB AUTOMATION, (200010), pages 1 - 8, URL: http://www.abb.com.cn/global/abbzh/abbzh251.nsf!OpenDatabase&db=/GLOBAL/SEAPR/SEAPR035.NSF&v=6311E&e=us&c=35BC88ABD12F60A0C12569600030F6B1, (20020709), XP002205127 [A] 1,3 * page 3, column L *
 [A]  - LANDRU J ET AL, "MONACO-Modular open network agent for control operations", NETWORK OPERATIONS AND MANAGEMENT SYMPOSIUM, 1998. NOMS 98., IEEE NEW ORLEANS, LA, USA 15-20 FEB. 1998, NEW YORK, NY, USA,IEEE, US, (19980215), ISBN 0-7803-4351-4, pages 600 - 609, XP010267388 [A] 1-4 * abstract * * page 607, paragraph 4 - page 608 *

DOI:   http://dx.doi.org/10.1109/NOMS.1998.654461
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.