blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1368177

EP1368177 - BLOWN FILM DIE AND PROCESS FOR PRODUCING TUBULAR FILM [Right-click to bookmark this link]
Former [2003/50]BLOWN FILM DIE FOR PRODUCING TUBULAR FILM
[2009/24]
StatusNo opposition filed within time limit
Status updated on  10.09.2010
Database last updated on 15.06.2024
Most recent event   Tooltip19.10.2012Lapse of the patent in a contracting state
New state(s): TR
published on 21.11.2012  [2012/47]
Applicant(s)For all designated states
Windmöller & Hölscher KG
Münsterstrasse 50
49525 Lengerich / DE
[2003/50]
Inventor(s)01 / FISCHER, Herbert
Dutumer Kotte 27
48431 Rheine / DE
 [2003/50]
Application number, filing date02722109.222.02.2002
[2003/50]
WO2002EP01798
Priority number, dateDE200111047905.03.2001         Original published format: DE 10110479
DE200112285611.05.2001         Original published format: DE 10122856
[2003/50]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO02070230
Date:12.09.2002
Language:DE
[2002/37]
Type: A1 Application with search report 
No.:EP1368177
Date:10.12.2003
Language:DE
The application published by WIPO in one of the EPO official languages on 12.09.2002 takes the place of the publication of the European patent application.
[2003/50]
Type: B1 Patent specification 
No.:EP1368177
Date:04.11.2009
Language:DE
[2009/45]
Search report(s)International search report - published on:EP12.09.2002
ClassificationIPC:B29C47/20, B29C47/88, B29C47/92, B29C47/86
[2003/50]
CPC:
B29C48/913 (EP,US); B29C48/10 (EP,US); B29C48/32 (EP,US);
B29C48/86 (EP,US); B29C48/865 (EP,US); B29C48/87 (EP,US);
B29C48/9125 (EP,US); B29C48/92 (EP,US); B29C2948/92152 (EP,US);
B29C2948/92428 (EP,US); B29C2948/926 (EP,US); B29C2948/92647 (EP,US);
B29C2948/92695 (EP,US); B29C2948/92704 (EP,US); B29C2948/92904 (EP,US);
B29C2948/92923 (EP,US) (-)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2003/50]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
SINot yet paid
TitleGerman:FOLIENBLASKOPF UND VERFAHREN ZUR HERSTELLUNG VON SCHLAUCHFOLIEN[2009/24]
English:BLOWN FILM DIE AND PROCESS FOR PRODUCING TUBULAR FILM[2009/24]
French:TETE DE SOUFFLAGE DE FEUILLES ET PROCEDE DESTINES A LA FABRICATION DE FEUILLES EN GAINES[2009/24]
Former [2003/50]FOLIENBLASKOPF ZUR HERSTELLUNG VON SCHLAUCHFOLIEN
Former [2003/50]BLOWN FILM DIE FOR PRODUCING TUBULAR FILM
Former [2003/50]TETE DE SOUFFLAGE DE FEUILLES DESTINEE A LA FABRICATION DE FEUILLES EN GAINES
Entry into regional phase06.10.2003National basic fee paid 
06.10.2003Designation fee(s) paid 
06.10.2003Examination fee paid 
Examination procedure13.09.2002Request for preliminary examination filed
International Preliminary Examining Authority: EP
06.10.2003Examination requested  [2003/50]
19.09.2006Despatch of a communication from the examining division (Time limit: M07)
25.04.2007Reply to a communication from the examining division
04.10.2007Despatch of a communication from the examining division (Time limit: M04)
01.02.2008Reply to a communication from the examining division
18.02.2008Despatch of a communication from the examining division (Time limit: M04)
30.06.2008Reply to a communication from the examining division
27.11.2008Date of oral proceedings
02.04.2009Despatch of a communication from the examining division (Time limit: M04)
02.04.2009Minutes of oral proceedings despatched
23.04.2009Reply to a communication from the examining division
15.06.2009Communication of intention to grant the patent
17.09.2009Fee for grant paid
17.09.2009Fee for publishing/printing paid
Opposition(s)05.08.2010No opposition filed within time limit [2010/41]
Fees paidRenewal fee
01.03.2004Renewal fee patent year 03
28.02.2005Renewal fee patent year 04
28.02.2006Renewal fee patent year 05
28.02.2007Renewal fee patent year 06
29.02.2008Renewal fee patent year 07
02.03.2009Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
NL04.11.2009
SE04.11.2009
TR04.11.2009
GR05.02.2010
ES15.02.2010
AT22.02.2010
GB22.02.2010
LU22.02.2010
BE28.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
[2012/47]
Former [2012/44]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
NL04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
AT22.02.2010
GB22.02.2010
LU22.02.2010
BE28.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
Former [2012/43]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
AT22.02.2010
GB22.02.2010
LU22.02.2010
BE28.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
Former [2011/31]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
AT22.02.2010
GB22.02.2010
BE28.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
Former [2011/17]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
GB22.02.2010
BE28.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
Former [2011/14]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
BE28.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
Former [2011/07]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
CH28.02.2010
LI28.02.2010
FR01.03.2010
MC01.03.2010
PT04.03.2010
Former [2010/47]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
CH28.02.2010
LI28.02.2010
MC01.03.2010
PT04.03.2010
Former [2010/46]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
GR05.02.2010
ES15.02.2010
MC01.03.2010
PT04.03.2010
Former [2010/35]CY04.11.2009
DK04.11.2009
FI04.11.2009
IE04.11.2009
SE04.11.2009
ES15.02.2010
PT04.03.2010
Former [2010/25]CY04.11.2009
FI04.11.2009
SE04.11.2009
ES15.02.2010
PT04.03.2010
Former [2010/22]FI04.11.2009
SE04.11.2009
ES15.02.2010
PT04.03.2010
Former [2010/19]ES15.02.2010
Cited inInternational search[Y]DE2658518  (REIFENHAEUSER KG) [Y] 1-9 * claims 1-7 * * page 11, line 3 - line 25 * * figures 1,3-6 *;
 [A]DE3920194  (KONERMANN STEFAN [DE]) [A] 1-9 * abstract ** figure -; claims 1-6,8-14 *;
 [Y]EP0425797  (WINDMOELLER & HOELSCHER [DE]) [Y] 1-9 * abstract * * column 1, line 52 - column 2, line 12 * * figures 1,2; claim - *;
 [DA]DE4207439  (WINDMOELLER & HOELSCHER [DE]) [DA] 1-9 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.