blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1380179

EP1380179 - METHOD AND APPARATUS FOR DISTRIBUTED SCCP MANAGEMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2006
Database last updated on 27.07.2024
Most recent event   Tooltip21.11.2008Change - lapse in a contracting state
Updated state(s): FR
published on 24.12.2008  [2008/52]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[N/P]
Former [2005/12]For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
Former [2004/19]For all designated states
Telefonaktiebolaget LM Ericsson (publ)
16483 Stockholm / SE
Former [2004/03]For all designated states
Telefonaktiebolaget L M Ericsson (Publ)
126 25 Stockholm / SE
Inventor(s)01 / MARTINEZ CANETE, Antonio
C/Brescia, 11
E-28028 Madrid / ES
02 / GONZALEZ ESCOBAR, Florencio
C/Camarena, 154
E-28047 Madrid / ES
03 / DE VEGA DE LA RED, Vincente
C/Marroquina, 42
E-28030 Madrid / ES
04 / VALENCIA ALVAREZ, Daniel
c/Amargura
E-16444 Cervera del Llano / ES
05 / SANZ DE LA VIUDA, Monica
C/Manuel de Falla, 2
E-29100 Alcobendas / ES
 [2004/03]
Representative(s)Meyer, Jochen
Ericsson GmbH, Ericsson Allee 1
52134 Herzogenrath / DE
[N/P]
Former [2004/37]Meyer, Jochen
Ericsson GmbH, Ericsson Allee 1
52134 Herzogenrath / DE
Former [2004/03]Tonscheidt, Andreas, et al
Ericsson Eurolab Deutschland GmbH Patent Department Ericsson Allee 1
52134 Herzogenrath / DE
Application number, filing date02726241.917.04.2002
[2004/03]
WO2002EP04237
Priority number, dateUS20010285072P19.04.2001         Original published format: US 285072 P
US2001091833130.07.2001         Original published format: US 918331
[2004/03]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO02087262
Date:31.10.2002
Language:EN
[2002/44]
Type: A1 Application with search report 
No.:EP1380179
Date:14.01.2004
Language:EN
The application published by WIPO in one of the EPO official languages on 31.10.2002 takes the place of the publication of the European patent application.
[2004/03]
Type: B1 Patent specification 
No.:EP1380179
Date:23.03.2005
Language:EN
[2005/12]
Search report(s)International search report - published on:EP31.10.2002
ClassificationIPC:H04Q3/00
[2004/03]
CPC:
H04Q3/0025 (EP,US)
Designated contracting statesAT,   BE,   CH,   CY,   DE,   DK,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   TR [2004/03]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
SINot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG FÜR DAS VERTEILTE SCCP-MANAGEMENT[2004/03]
English:METHOD AND APPARATUS FOR DISTRIBUTED SCCP MANAGEMENT[2004/03]
French:PROCEDE ET DISPOSITIF POUR LA GESTION REPARTIE DE SOUS-SYSTEME DE COMMANDE DES CONNEXIONS SEMAPHORES (SCCP)[2004/03]
Entry into regional phase09.10.2003National basic fee paid 
09.10.2003Designation fee(s) paid 
09.10.2003Examination fee paid 
Examination procedure23.10.2002Request for preliminary examination filed
International Preliminary Examining Authority: EP
09.10.2003Amendment by applicant (claims and/or description)
09.10.2003Examination requested  [2004/03]
15.03.2004Despatch of a communication from the examining division (Time limit: M04)
15.07.2004Reply to a communication from the examining division
04.10.2004Communication of intention to grant the patent
13.01.2005Fee for grant paid
13.01.2005Fee for publishing/printing paid
Opposition(s)27.12.2005No opposition filed within time limit [2006/11]
Fees paidRenewal fee
26.04.2004Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
FR23.03.2005
IT23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
LU17.04.2005
IE18.04.2005
MC30.04.2005
DK23.06.2005
GR23.06.2005
SE23.06.2005
ES04.07.2005
PT07.09.2005
[2008/52]
Former [2008/45]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
IT23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
LU17.04.2005
IE18.04.2005
FR30.04.2005
MC30.04.2005
DK23.06.2005
GR23.06.2005
SE23.06.2005
ES04.07.2005
PT07.09.2005
Former [2008/07]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
IT23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
LU17.04.2005
IE18.04.2005
MC30.04.2005
DK23.06.2005
GR23.06.2005
SE23.06.2005
ES04.07.2005
PT07.09.2005
Former [2007/38]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
IT23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
LU17.04.2005
IE18.04.2005
MC30.04.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2007/27]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
LU17.04.2005
IE18.04.2005
MC30.04.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2007/26]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
LU17.04.2005
IE18.04.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2007/20]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
CY17.04.2005
IE18.04.2005
LU23.05.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2007/11]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
IE18.04.2005
LU23.05.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2006/52]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
TR23.03.2005
IE18.04.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2006/25]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
IE18.04.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2006/14]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
NL23.03.2005
DK23.06.2005
GR23.06.2005
ES04.07.2005
PT07.09.2005
Former [2006/12]AT23.03.2005
BE23.03.2005
CH23.03.2005
FI23.03.2005
LI23.03.2005
DK23.06.2005
Former [2005/51]AT23.03.2005
BE23.03.2005
FI23.03.2005
Former [2005/46]FI23.03.2005
Cited inInternational search[A]US5905715  (AZARMI NADER [GB], et al) [A] 1-28 * column A ** column 9, line 13 - line 43 *;
 [X]EP1026867  (NORTEL NETWORKS CORP [CA]) [X] 1 * column A * * page 10, line 32 - line 46 * * page 12, line 15 - line 48 *;
 [X]US6195425  (FARRIS ROBERT D [US]) [X] 1 * column A * * column 7, line 3 - line 41 * * column 8, line 17 - line 31 * * column 9, line 43 - column 10, line 24 *;
 [A]EP1089575  (ALCATEL USA SOURCING LP [US]) [A] 1-28 * column A * * column 13, line 21 - line 44 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.