blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1430006

EP1430006 - ACCELERATOR COMPOSITION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.06.2007
Database last updated on 15.07.2024
Most recent event   Tooltip12.12.2008Lapse of the patent in a contracting state
New state(s): CY
published on 14.01.2009  [2009/03]
Applicant(s)For all designated states
Construction Research & Technology GmbH
Dr.-Albert-Frank-Str. 32
83308 Trostberg / DE
[N/P]
Former [2006/31]For all designated states
Construction Research & Technology GmbH
Dr.-Albert-Frank-Strasse 32
83308 Trostberg / DE
Former [2004/26]For all designated states
Construction Research & Technology GmbH
Dr.Albert-Frank-Strasse 32
83308 Trostberg / DE
Inventor(s)01 / ANGELSKAAR, Terje
Honeretshof 6 Berg Dietikon
CH-8962 Zürich / CH
 [2004/26]
Application number, filing date02800065.126.08.2002
[2004/26]
WO2002EP09528
Priority number, dateGB2001002336428.09.2001         Original published format: GB 0123364
[2004/26]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO03029163
Date:10.04.2003
Language:EN
[2003/15]
Type: A2 Application without search report 
No.:EP1430006
Date:23.06.2004
Language:EN
The application published by WIPO in one of the EPO official languages on 10.04.2003 takes the place of the publication of the European patent application.
[2004/26]
Type: B1 Patent specification 
No.:EP1430006
Date:02.08.2006
Language:EN
[2006/31]
Search report(s)International search report - published on:EP04.09.2003
ClassificationIPC:C04B40/00, C04B28/02, C04B22/06, C04B22/14, C04B22/16, C04B24/04, C04B103/10
[2004/26]
CPC:
C04B40/0039 (EP,US); C04B2103/10 (EP,US); C04B2111/00155 (EP,US);
C04B2111/1025 (EP,US)
C-Set:
C04B40/0039, C04B14/303, C04B22/148, C04B22/165, C04B24/04, C04B24/122, C04B28/02, C04B2103/50 (US,EP);
C04B40/0039, C04B22/06, C04B22/148, C04B22/165, C04B24/04, C04B24/122, C04B28/02, C04B2103/50 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SK,   TR [2004/26]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
SINot yet paid
TitleGerman:BESCHLEUNIGERZUSAMMENSETZUNG[2004/26]
English:ACCELERATOR COMPOSITION[2004/26]
French:COMPOSITION D'ACCELERATEUR[2004/26]
Entry into regional phase02.03.2004National basic fee paid 
02.03.2004Designation fee(s) paid 
02.03.2004Examination fee paid 
Examination procedure02.03.2004Examination requested  [2004/30]
29.06.2004Despatch of a communication from the examining division (Time limit: M04)
28.08.2004Reply to a communication from the examining division
24.03.2006Communication of intention to grant the patent
13.05.2006Fee for grant paid
13.05.2006Fee for publishing/printing paid
Opposition(s)03.05.2007No opposition filed within time limit [2007/28]
Fees paidRenewal fee
02.03.2004Renewal fee patent year 03
18.08.2005Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY02.08.2006
CZ02.08.2006
EE02.08.2006
SK02.08.2006
TR02.08.2006
LU26.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
[2009/03]
Former [2008/37]CZ02.08.2006
EE02.08.2006
SK02.08.2006
TR02.08.2006
LU26.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
Former [2008/28]CZ02.08.2006
EE02.08.2006
SK02.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
Former [2007/45]CZ02.08.2006
SK02.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
Former [2007/39]CZ02.08.2006
IT02.08.2006
SK02.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
Former [2007/28]CZ02.08.2006
SK02.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
Former [2007/22]CZ02.08.2006
MC31.08.2006
BG02.11.2006
DK02.11.2006
Former [2007/19]MC31.08.2006
BG02.11.2006
Former [2007/12]BG02.11.2006
Cited inInternational search[A]WO9818740  (GIULINI CHEMIE [DE], et al) [A] * page 3, lines 1-29 *;
 [Y]WO0078688  (MBT HOLDING AG [CH], et al) [Y] 1-7,9 * page 2, line 1 - page 3, line 25 *;
 [YD]WO0142165  (MBT HOLDING AG [CH], et al) [YD] 1-7,9 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.