blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1359449

EP1359449 - An improved fiber optic cable [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  20.04.2007
Database last updated on 16.09.2024
Most recent event   Tooltip11.07.2008Change - representativepublished on 13.08.2008  [2008/33]
Applicant(s)For all designated states
SAMSUNG ELECTRONICS CO., LTD.
416 Maetong-dong
Paldal-gu
Suwon-shi
Kyungki-do
Seoul / KR
[N/P]
Former [2003/45]For all designated states
SAMSUNG ELECTRONICS Co. Ltd.
416 Maetong-dong, Paldal-gu, Suwon-shi
Kyungki-do, Seoul / KR
Inventor(s)01 / Lee, Ho-Soon, Samsung Electronics Co., Ltd.
416, Maetan-dong, Paldal-gu
Suwon-city, Kyungki-do / KR
02 / Hwang, Joong-Jin, Samsung Electronics Co., Ltd.
416, Maetan-dong, Paldal-gu
Suwon-city, Kyungki-do / KR
 [2003/45]
Representative(s)Lang, Johannes
Bardehle Pagenberg Partnerschaft mbB
Patentanwälte, Rechtsanwälte
Postfach 86 06 20
81633 München / DE
[N/P]
Former [2008/33]Lang, Johannes
Bardehle Pagenberg Dost Altenburg Geissler, Postfach 86 06 20
81633 München / DE
Former [2003/45]Lang, Johannes, Dipl.-Ing.
Bardehle Pagenberg Dost Altenburg Geissler Isenbruck, Postfach 86 06 20
81633 München / DE
Application number, filing date03009734.902.05.2003
[2003/45]
Priority number, dateKR2002002454503.05.2002         Original published format: KR 2002024545
[2003/45]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1359449
Date:05.11.2003
Language:EN
[2003/45]
Type: A3 Search report 
No.:EP1359449
Date:14.04.2004
[2004/16]
Search report(s)(Supplementary) European search report - dispatched on:EP02.03.2004
ClassificationIPC:G02B6/44
[2003/45]
CPC:
G02B6/4413 (EP,US); G02B6/44 (KR); G02B6/4434 (EP,US)
Designated contracting statesDE,   FR,   GB [2005/01]
Former [2003/45]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verbessertes faseroptisches Kabel[2003/45]
English:An improved fiber optic cable[2003/45]
French:Câble à fibres optiques amélioré[2003/45]
Examination procedure02.05.2003Examination requested  [2003/45]
27.01.2005Despatch of a communication from the examining division (Time limit: M04)
06.06.2005Reply to a communication from the examining division
25.08.2006Communication of intention to grant the patent
01.12.2006Application deemed to be withdrawn, date of legal effect  [2007/21]
05.01.2007Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2007/21]
Fees paidRenewal fee
12.05.2005Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.05.200604   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]DE3324597  (SIEMENS AG [DE]) [Y] 8,9,14 * abstract ** page 3, line 31 - page 4, column 36 *;
 [Y]US4781433  (ARROYO CANDIDO J [US], et al) [Y] 1-4,7-9,14 * abstract * * column 3, lines 59-68 * * column 9, lines 52-66 *;
 [Y]US4828352  (KRAFT HEINRICH A [US]) [Y] 1-4,7,14 * abstract * * column 1, lines 24-34 * * column 3, lines 1-26 *;
 [Y]EP0833177  (LUCENT TECHNOLOGIES INC [US]) [Y] 3,4 * abstract * * column 4, lines 25-42 *;
 [Y]US6293081  (GRULICK MATTHEW J [US], et al) [Y] 1,2,9 * abstract * * column 3, lines 37-54 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.