blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1533912

EP1533912 - A method of finding delays of a multipath channel [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.11.2009
Database last updated on 15.06.2024
Most recent event   Tooltip07.10.2011Lapse of the patent in a contracting state
New state(s): CY, TR
published on 09.11.2011  [2011/45]
Applicant(s)For all designated states
Alcatel Lucent
54, rue la Boétie
75008 Paris / FR
[N/P]
Former [2008/46]For all designated states
Alcatel Lucent
54 rue La Boétie
75008 Paris / FR
Former [2005/21]For all designated states
Evolium S.A.S.
12, rue de la Baume
75008 Paris / FR
Inventor(s)01 / Jeschke, Michael, Dipl.-Ing.
Rotenwaldstrasse 27a
70197 Stuttgart / DE
 [2005/21]
Representative(s)Brose, Gerhard, et al
Alcatel Lucent
Intellectual Property & Standards
70430 Stuttgart / DE
[N/P]
Former [2008/30]Brose, Gerhard, et al
Alcatel Lucent Intellectual Property & Standards
70430 Stuttgart / DE
Former [2008/21]Schmidt, Werner Karl
Alcatel Lucent Intellectual Property & Standards
70430 Stuttgart / DE
Former [2005/21]Richardt, Markus Albert, Dipl.-Ing., et al
Leergasse 11
65343 Eltville am Rhein / DE
Application number, filing date03027017.722.11.2003
[2005/21]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1533912
Date:25.05.2005
Language:EN
[2005/21]
Type: B1 Patent specification 
No.:EP1533912
Date:07.01.2009
Language:EN
[2009/02]
Search report(s)(Supplementary) European search report - dispatched on:EP01.06.2004
ClassificationIPC:H04B1/707
[2005/21]
CPC:
H04B1/70754 (EP,US); H04B1/7113 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2006/12]
Former [2006/07](deleted) 
Former [2005/21]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren zur Ermittlung der Verzögerungen in einem Mehrpfad-Kanal[2008/12]
English:A method of finding delays of a multipath channel[2005/21]
French:Méthode pour trouver les retards d'un canal multi-chemin[2008/12]
Former [2005/21]Verfahren zur Ermittlung der Verzögerungen in einem Mehrwegepfad-Kanal
Former [2005/21]Méthode pour trouver les retards dans un canal multi-chemin
Examination procedure22.09.2004Examination requested  [2005/21]
23.12.2004Despatch of a communication from the examining division (Time limit: M04)
05.04.2005Reply to a communication from the examining division
27.10.2006Despatch of a communication from the examining division (Time limit: M04)
18.12.2006Reply to a communication from the examining division
19.04.2007Despatch of a communication from the examining division (Time limit: M04)
27.06.2007Reply to a communication from the examining division
27.02.2008Communication of intention to grant the patent
08.07.2008Fee for grant paid
08.07.2008Fee for publishing/printing paid
Opposition(s)08.10.2009No opposition filed within time limit [2009/51]
Fees paidRenewal fee
14.11.2005Renewal fee patent year 03
13.11.2006Renewal fee patent year 04
16.11.2007Renewal fee patent year 05
17.11.2008Renewal fee patent year 06
Penalty fee
Penalty fee Rule 85a EPC 1973
11.01.2006AT   M01   Fee paid on   19.01.2006
11.01.2006BE   M01   Fee paid on   19.01.2006
11.01.2006BG   M01   Fee paid on   19.01.2006
11.01.2006CH   M01   Fee paid on   19.01.2006
11.01.2006CY   M01   Fee paid on   19.01.2006
11.01.2006CZ   M01   Fee paid on   19.01.2006
11.01.2006DE   M01   Fee paid on   19.01.2006
11.01.2006DK   M01   Fee paid on   19.01.2006
11.01.2006EE   M01   Fee paid on   19.01.2006
11.01.2006ES   M01   Fee paid on   19.01.2006
11.01.2006FI   M01   Fee paid on   19.01.2006
11.01.2006FR   M01   Fee paid on   19.01.2006
11.01.2006GB   M01   Fee paid on   19.01.2006
11.01.2006GR   M01   Fee paid on   19.01.2006
11.01.2006HU   M01   Fee paid on   19.01.2006
11.01.2006IE   M01   Fee paid on   19.01.2006
11.01.2006IT   M01   Fee paid on   19.01.2006
11.01.2006LU   M01   Fee paid on   19.01.2006
11.01.2006MC   M01   Fee paid on   19.01.2006
11.01.2006NL   M01   Fee paid on   19.01.2006
11.01.2006PT   M01   Fee paid on   19.01.2006
11.01.2006RO   M01   Fee paid on   19.01.2006
11.01.2006SE   M01   Fee paid on   19.01.2006
11.01.2006SI   M01   Fee paid on   19.01.2006
11.01.2006SK   M01   Fee paid on   19.01.2006
11.01.2006TR   M01   Fee paid on   19.01.2006
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT07.01.2009
BE07.01.2009
CY07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
IT07.01.2009
NL07.01.2009
RO07.01.2009
SI07.01.2009
SK07.01.2009
TR07.01.2009
BG07.04.2009
SE07.04.2009
GR08.04.2009
ES18.04.2009
PT08.06.2009
HU08.07.2009
[2011/44]
Former [2011/31]AT07.01.2009
BE07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
IT07.01.2009
NL07.01.2009
RO07.01.2009
SI07.01.2009
SK07.01.2009
BG07.04.2009
SE07.04.2009
GR08.04.2009
ES18.04.2009
PT08.06.2009
HU08.07.2009
Former [2011/14]AT07.01.2009
BE07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
IT07.01.2009
NL07.01.2009
RO07.01.2009
SI07.01.2009
SK07.01.2009
BG07.04.2009
SE07.04.2009
GR08.04.2009
ES18.04.2009
PT08.06.2009
Former [2010/48]AT07.01.2009
BE07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
NL07.01.2009
RO07.01.2009
SI07.01.2009
SK07.01.2009
BG07.04.2009
SE07.04.2009
GR08.04.2009
ES18.04.2009
PT08.06.2009
Former [2010/08]AT07.01.2009
BE07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
NL07.01.2009
RO07.01.2009
SI07.01.2009
SK07.01.2009
BG07.04.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/50]AT07.01.2009
BE07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
NL07.01.2009
RO07.01.2009
SI07.01.2009
SK07.01.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/49]AT07.01.2009
BE07.01.2009
CZ07.01.2009
DK07.01.2009
EE07.01.2009
FI07.01.2009
NL07.01.2009
SI07.01.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/46]AT07.01.2009
BE07.01.2009
DK07.01.2009
FI07.01.2009
NL07.01.2009
SI07.01.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/43]AT07.01.2009
BE07.01.2009
FI07.01.2009
NL07.01.2009
SI07.01.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/40]AT07.01.2009
FI07.01.2009
NL07.01.2009
SI07.01.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/38]FI07.01.2009
NL07.01.2009
SI07.01.2009
SE07.04.2009
ES18.04.2009
PT08.06.2009
Former [2009/34]NL07.01.2009
SI07.01.2009
ES18.04.2009
Former [2009/25]NL07.01.2009
SI07.01.2009
Documents cited:Search[X]EP1052783  (NEC CORP [JP]) [X] 1-10 * abstract ** paragraph [0043] - paragraph [0054]; figures 4,5 *;
 [X]WO0176087  (QUALCOMM INC [US]) [X] 1-10 * page 12, line 6 - page 14, line 20; figures 4-7 * * page 17, line 30 - page 18, line 27; figure 8 *
ExaminationGB2368238
 WO03056714
    - FAWER U.; DHAR K.K.; WELTI A.L., "A multiprocessor approach for implementing a time-diversity spread spectrum receiver", PROCEEDINGS OF THE INTERNATIONAL ZURICH SEMINAR ON DIGITAL COMMUNICATIONS, ZURICH, INST. FOR QUANTUM ELECTRONICS, CH, (19900305), pages 173 - 180, XP010010651
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.