blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1464988

EP1464988 - Determination of time difference of arrival in distributed sensor networks [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.04.2009
Database last updated on 08.06.2024
Most recent event   Tooltip17.04.2009No opposition filed within time limitpublished on 20.05.2009  [2009/21]
Applicant(s)For:GB 
Mitsubishi Electric Information Technology Centre Europe B.V.
20 Frederick Sanger Road, The Surrey Research Park
Guildford, Surrey GU2 5YD / GB
For:DE  FR 
MITSUBISHI DENKI KABUSHIKI KAISHA
7-3, Marunouchi 2-chome Chiyoda-ku
Tokyo 100-8310 / JP
[2008/24]
Former [2006/18]For:GB 
Mitsubishi Electric Information Technology Centre Europe B.V.
20 Frederick Sanger Road, The Surrey Research Park
Guildford, Surrey GU2 5YD / GB
For:AT  BE  BG  CH  CY  CZ  DE  DK  EE  ES  FI  FR  GR  IE  IT  LI  LU  MC  NL  PT  SE  SK  TR 
MITSUBISHI DENKI KABUSHIKI KAISHA
7-3, Marunouchi 2-chome Chiyoda-ku
Tokyo 100-8310 / JP
Former [2004/41]For:GB 
Mitsubishi Electric Information Technology Centre Europe B.V.
20 Frederick Sanger Road, The Surrey Research Park
Guildford, Surrey GU2 5YD / GB
For:AT  BE  BG  CH  LI  CY  CZ  DE  DK  EE  ES  FI  FR  GR  IE  IT  LU  MC  NL  PT  SE  SK  TR 
MITSUBISHI DENKI KABUSHIKI KAISHA
2-3, Marunouchi 2-chome Chiyoda-ku
Tokyo 100 / JP
Inventor(s)01 / Szajnowski, Wieslaw Jerzy
3, The Red House West Road
Guildford Surrey GU1 1AR / GB
 [2004/41]
Representative(s)Burke, Steven David, et al
R.G.C. Jenkins & Co 26 Caxton Street
London SW1H 0RJ / GB
[N/P]
Former [2004/41]Burke, Steven David, et al
R.G.C. Jenkins & Co. 26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date03252120.503.04.2003
[2004/41]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1464988
Date:06.10.2004
Language:EN
[2004/41]
Type: B1 Patent specification 
No.:EP1464988
Date:11.06.2008
Language:EN
[2008/24]
Search report(s)(Supplementary) European search report - dispatched on:EP22.09.2003
ClassificationIPC:G01S13/87, G01S15/87
[2004/41]
CPC:
G01S13/878 (EP,US); G01S15/876 (EP,US); G01S13/003 (EP,US);
G01S5/06 (EP,US); G01S5/22 (EP,US)
Designated contracting statesDE,   FR,   GB [2005/26]
Former [2004/41]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Laufzeitdifferenzbestimmung in verteilten Sensornetzwerken[2004/41]
English:Determination of time difference of arrival in distributed sensor networks[2004/41]
French:Détermination du temps de propagation differentiel dans des réseaux de capteurs distribués[2004/41]
Examination procedure05.04.2005Examination requested  [2005/22]
07.04.2005Loss of particular rights, legal effect: designated state(s)
08.08.2005Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, GR, HU, IE, IT, LU, MC, NL, PT, RO, SE, SI, SK, TR
22.08.2005Despatch of a communication from the examining division (Time limit: M06)
09.01.2006Reply to a communication from the examining division
24.08.2007Communication of intention to grant the patent
11.02.2008Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
17.04.2008Fee for grant paid
17.04.2008Fee for publishing/printing paid
Opposition(s)12.03.2009No opposition filed within time limit [2009/21]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
17.04.2008Request for further processing filed
17.04.2008Full payment received (date of receipt of payment)
Request granted
07.04.2008Decision despatched
Fees paidRenewal fee
13.04.2005Renewal fee patent year 03
17.03.2006Renewal fee patent year 04
12.04.2007Renewal fee patent year 05
11.03.2008Renewal fee patent year 06
Penalty fee
Penalty fee Rule 85a EPC 1973
20.05.2005AT   M01   Not yet paid
20.05.2005BE   M01   Not yet paid
20.05.2005BG   M01   Not yet paid
20.05.2005CH   M01   Not yet paid
20.05.2005CY   M01   Not yet paid
20.05.2005CZ   M01   Not yet paid
20.05.2005DK   M01   Not yet paid
20.05.2005EE   M01   Not yet paid
20.05.2005ES   M01   Not yet paid
20.05.2005FI   M01   Not yet paid
20.05.2005GR   M01   Not yet paid
20.05.2005HU   M01   Not yet paid
20.05.2005IE   M01   Not yet paid
20.05.2005IT   M01   Not yet paid
20.05.2005LU   M01   Not yet paid
20.05.2005MC   M01   Not yet paid
20.05.2005NL   M01   Not yet paid
20.05.2005PT   M01   Not yet paid
20.05.2005RO   M01   Not yet paid
20.05.2005SE   M01   Not yet paid
20.05.2005SI   M01   Not yet paid
20.05.2005SK   M01   Not yet paid
20.05.2005TR   M01   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]EP0410594  (ATOMIC ENERGY AUTHORITY UK [GB]) [A] 1,8,11 * abstract *;
 [YA]GB2298098  (TAGWARE LTD [GB]) [Y] 11,12 * abstract *[A] 1,8;
 [DY]WO0039643  (MITSUBISHI ELECTRIC INF TECH [GB], et al) [DY] 11,12 * abstract * * page 9, line 15 - page 11, line 18 *;
 [A]DE10027828  (SONEM GMBH [DE]) [A] 1,8,11 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.