blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1440897

EP1440897 - Fabrication process for crimpable metallic crossbar terminals for flexible handles [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.06.2005
Database last updated on 11.09.2024
Most recent event   Tooltip13.04.2007Lapse of the patent in a contracting state
New state(s): CY
published on 16.05.2007  [2007/20]
Applicant(s)For all designated states
Ruggero, Peroni
Via Corsica, 31
21100 Varese / IT
[2004/31]
Inventor(s)01 / see applicant
...
 [2004/31]
Representative(s)Pellegri, Alberto
Società Italiana Brevetti S.p.A. Via Carducci, 8
20123 Milano / IT
[N/P]
Former [2004/31]Pellegri, Alberto
c/o Società Italiana Brevetti S.p.A. Piazza Repubblica, 5
21100 Varese / IT
Application number, filing date03425030.823.01.2003
[2004/31]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1440897
Date:28.07.2004
Language:EN
[2004/31]
Type: B1 Patent specification 
No.:EP1440897
Date:04.08.2004
Language:EN
[2004/32]
Search report(s)(Supplementary) European search report - dispatched on:EP30.07.2003
ClassificationIPC:B65D33/12, B21D53/58
[2004/31]
CPC:
B21D53/58 (EP); B65D33/12 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SI,   SK,   TR [2004/31]
TitleGerman:Herstellungsverfahren von Crimpbaren metallischen Querstänge für Trageschnüre[2004/31]
English:Fabrication process for crimpable metallic crossbar terminals for flexible handles[2004/31]
French:Procédé de fabrication de barettes métalliques sertissables pour poignées flexibles[2004/31]
Examination procedure11.10.2003Examination requested  [2004/31]
13.10.2003Amendment by applicant (claims and/or description)
09.02.2004Communication of intention to grant the patent
10.05.2004Fee for grant paid
10.05.2004Fee for publishing/printing paid
Opposition(s)06.05.2005No opposition filed within time limit [2005/30]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
EE04.08.2004
FI04.08.2004
LI04.08.2004
NL04.08.2004
SI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
HU05.11.2004
CY23.01.2005
LU23.01.2005
IE24.01.2005
MC31.01.2005
[2007/20]
Former [2007/13]AT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
EE04.08.2004
FI04.08.2004
LI04.08.2004
NL04.08.2004
SI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
HU05.11.2004
LU23.01.2005
IE24.01.2005
MC31.01.2005
Former [2006/35]AT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
NL04.08.2004
SI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
HU05.11.2004
IE24.01.2005
MC31.01.2005
Former [2006/23]AT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
NL04.08.2004
SI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
IE24.01.2005
MC31.01.2005
Former [2006/14]AT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
SI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
MC31.01.2005
Former [2005/50]AT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
SI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
Former [2005/30]AT04.08.2004
BE04.08.2004
BG04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
Former [2005/28]AT04.08.2004
BE04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
Former [2005/24]AT04.08.2004
CH04.08.2004
CZ04.08.2004
FI04.08.2004
LI04.08.2004
SK04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
Former [2005/22]AT04.08.2004
CH04.08.2004
FI04.08.2004
LI04.08.2004
DK04.11.2004
GR04.11.2004
SE04.11.2004
Former [2005/21]AT04.08.2004
CH04.08.2004
FI04.08.2004
LI04.08.2004
GR04.11.2004
SE04.11.2004
Former [2005/18]AT04.08.2004
FI04.08.2004
GR04.11.2004
SE04.11.2004
Former [2005/13]AT04.08.2004
FI04.08.2004
SE04.11.2004
Former [2005/11]FI04.08.2004
SE04.11.2004
Former [2005/10]SE04.11.2004
Documents cited:Search[Y]GB805378  (AMP INC) [Y] 2,3 * page 2, line 69 - line 73; figure 2 ** page 3, line 62 - line 69; figure 8 *;
 [XY]EP1166672  (SPAZIANI CARLO [IT]) [X] 1 * figure -; claims 1,2 * [Y] 2,3
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.