blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1494366

EP1494366 - POWER CONTROL METHOD FOR UPLINK CONTROL CHANNEL IN SOFT HANDOVER IN HIGH-SPEED PACKET ACCESS SYSTEM [Right-click to bookmark this link]
Former [2005/01]POWER CONTROL METHOD FOR UPLINK CONTROL CHANNEL IN SOFT HANDOVER IN HIGH-SPEED POCKET ACCESS SYSTEM
[2006/39]
StatusNo opposition filed within time limit
Status updated on  18.01.2008
Database last updated on 30.09.2024
Most recent event   Tooltip13.08.2010Lapse of the patent in a contracting state
New state(s): TR
published on 15.09.2010  [2010/37]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Service Centre Building
Kefa Road
Science-Based Industrial Park
Nanshan District
Shenzhen, Guangdong 518057 / CN
[N/P]
Former [2007/11]For all designated states
Huawei Technologies Co., Ltd.
Intellectual Property Department, Huawei Service Centre Bld., Kefa Road, Science-Based Industrial Park
Shenzhen, Guangdong 518057 / CN
Former [2005/01]For all designated states
Huawei Technologies Co., Ltd.
Intellectual Property Department, Huawei Service Centre Bld., Kefa Road, Science-Based Industrial Park
Shenzhen, Guangdong 518057 / CN
Inventor(s)01 / WU, Di, I. P. D., Huawei Service Centre Bldg
Kefa Road, Science-Based Industrial Park
Shenzhen, Guangdong 518057 / CN
02 / WEI, Yuejun, IP Dept., Huawei Service Centre Bldg.
Kefa Road, Science-Based Industrial Park
Shenzhen, Guangdong Province 518057 / CN
 [2005/10]
Former [2005/01]01 / WU, Di, I. P. D., Huawei Service Centre Bldg
Kefa Road, Science-Based Industrial Park
Shenzhen, Guangdong 518057 / CN
02 / WEI, Yuejun, I. P. D, Huawe Service Centre Bldg.
Kefa Road, Science-Based Industrial Park
Shenzhen, Guangdong 518057 / CN
Representative(s)Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH
Schlossschmidstrasse 5
80639 München / DE
[N/P]
Former [2008/30]Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH Ridlerstrasse 55
80339 München / DE
Former [2007/02]Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH Ridlerstrasse 55
80339 München / DE
Former [2005/01]Reyier, Ann-Mari
Bjerkéns Patentbyra KB, Box 128
721 05 Västeras / SE
Application number, filing date03702305.827.01.2003
[2005/01]
WO2003CN00078
Priority number, dateCN200211655208.04.2002         Original published format: CN 02116552
[2005/01]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO03088519
Date:23.10.2003
Language:EN
[2003/43]
Type: A1 Application with search report 
No.:EP1494366
Date:05.01.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 23.10.2003 takes the place of the publication of the European patent application.
[2005/01]
Type: B1 Patent specification 
No.:EP1494366
Date:14.03.2007
Language:EN
[2007/11]
Search report(s)International search report - published on:CN23.10.2003
(Supplementary) European search report - dispatched on:EP30.05.2006
ClassificationIPC:H04B7/005
[2005/01]
CPC:
H04W52/325 (EP); H04W52/286 (EP); H04W52/146 (EP);
H04W52/40 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   SE,   SI,   SK,   TR [2005/01]
Extension statesALNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
RONot yet paid
TitleGerman:LEISTUNGSREGELVERFAHREN FÜR DEN AUFWÄRTSSTEUERKANAL BEI DER SOFT-WEITERREICHUNG IN EINEM SCHNELLEN PACKET-ACCESS-SYSTEM[2006/39]
English:POWER CONTROL METHOD FOR UPLINK CONTROL CHANNEL IN SOFT HANDOVER IN HIGH-SPEED PACKET ACCESS SYSTEM[2006/39]
French:PROCEDE DE COMMANDE DE PUISSANCE DESTINE A UN CANAL DE COMMANDE DE LIAISON MONTANTE DANS UN TRANSFERT SOUPLE, DANS UN SYSTEME D'ACCES PAR PAQUETS EN LIAISON DESCENDANTE A HAUT DEBIT[2005/01]
Former [2005/01]LEISTUNGSREGELVERFAHREN FÜR DEN AUFWÄRTSSTEUERKANAL BEI DER SOFT-WEITERREICHUNG IN EINEM SCHNELLEN POCKET-ACCESS-SYSTEM
Former [2005/01]POWER CONTROL METHOD FOR UPLINK CONTROL CHANNEL IN SOFT HANDOVER IN HIGH-SPEED POCKET ACCESS SYSTEM
Entry into regional phase29.09.2004Translation filed 
29.09.2004National basic fee paid 
29.09.2004Search fee paid 
29.09.2004Designation fee(s) paid 
29.09.2004Examination fee paid 
Examination procedure29.09.2004Amendment by applicant (claims and/or description)
29.09.2004Examination requested  [2005/01]
05.09.2006Communication of intention to grant the patent
20.11.2006Fee for grant paid
20.11.2006Fee for publishing/printing paid
Opposition(s)17.12.2007No opposition filed within time limit [2008/08]
Fees paidRenewal fee
13.01.2005Renewal fee patent year 03
12.01.2006Renewal fee patent year 04
29.01.2007Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT14.03.2007
BE14.03.2007
CH14.03.2007
CY14.03.2007
CZ14.03.2007
DK14.03.2007
EE14.03.2007
IT14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
TR14.03.2007
BG14.06.2007
SE14.06.2007
DE15.06.2007
GR15.06.2007
ES25.06.2007
PT14.08.2007
HU15.09.2007
[2010/37]
Former [2010/34]AT14.03.2007
BE14.03.2007
CH14.03.2007
CY14.03.2007
CZ14.03.2007
DK14.03.2007
EE14.03.2007
IT14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
BG14.06.2007
SE14.06.2007
DE15.06.2007
GR15.06.2007
ES25.06.2007
PT14.08.2007
HU15.09.2007
Former [2009/39]AT14.03.2007
BE14.03.2007
CH14.03.2007
CY14.03.2007
CZ14.03.2007
DK14.03.2007
EE14.03.2007
IT14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
BG14.06.2007
SE14.06.2007
DE15.06.2007
GR15.06.2007
ES25.06.2007
PT14.08.2007
Former [2009/34]AT14.03.2007
BE14.03.2007
CH14.03.2007
CY14.03.2007
CZ14.03.2007
DK14.03.2007
EE14.03.2007
IT14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
DE15.06.2007
GR15.06.2007
ES25.06.2007
PT14.08.2007
Former [2009/11]AT14.03.2007
BE14.03.2007
CH14.03.2007
CZ14.03.2007
DK14.03.2007
EE14.03.2007
IT14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
DE15.06.2007
GR15.06.2007
ES25.06.2007
PT14.08.2007
Former [2008/22]AT14.03.2007
BE14.03.2007
CH14.03.2007
CZ14.03.2007
DK14.03.2007
IT14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
DE15.06.2007
GR15.06.2007
ES25.06.2007
PT14.08.2007
Former [2008/09]AT14.03.2007
BE14.03.2007
CH14.03.2007
CZ14.03.2007
DK14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
DE15.06.2007
ES25.06.2007
PT14.08.2007
Former [2008/08]AT14.03.2007
BE14.03.2007
CH14.03.2007
CZ14.03.2007
DK14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
ES25.06.2007
PT14.08.2007
Former [2008/02]AT14.03.2007
BE14.03.2007
CH14.03.2007
CZ14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
ES25.06.2007
PT14.08.2007
Former [2007/51]AT14.03.2007
BE14.03.2007
CH14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SK14.03.2007
SE14.06.2007
ES25.06.2007
PT14.08.2007
Former [2007/49]AT14.03.2007
BE14.03.2007
CH14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SE14.06.2007
ES25.06.2007
PT14.08.2007
Former [2007/47]AT14.03.2007
CH14.03.2007
LI14.03.2007
NL14.03.2007
SI14.03.2007
SE14.06.2007
ES25.06.2007
Former [2007/40]CH14.03.2007
LI14.03.2007
NL14.03.2007
SE14.06.2007
Documents cited:Search[A]  - PHILIPS, "Performance of ACK/NACK signalling", TSG RAN WG1 #22, Jeju, South Korea, (20011119), pages 1 - 7, XP002380346 [A] 1-5 * the whole document *
 [A]  - "UL Power Control for HSDPA", 3GPP TSG RAN WG 1, (20011119), no. 22, pages 1 - 4, XP002229769 [A] 1-5 * the whole document *
 [A]  - CWTS/HUAWEI, "Power Control of Uplink ACK/NACK in Soft Handover", 3GPP TSG RAN WG1 #24, Orlando, USA, (20020218), no. R1-02-0215, pages 1 - 5, XP002380347 [A] 1-5 * the whole document *
 [A]  - "High Speed Downlink Packet Access: Physical Layer Aspects (Release 5)", 3GPP TR 25.858 V5.0.0, XX, XX, (200203), pages 1 - 31, XP002265002 [A] 1-5 * page 19 - page 20 *
 [A]  - NOKIA, "Power offset for uplink ACK/NACK", TSG-RAN WG1 #23, Espoo, Finland, (20020108), pages 1 - 3, XP002380348 [A] 1-5 * the whole document *
 [A]  - NORTEL NETWORKS, "Introduction of power control aspects for HSDPA feature in TS25.214", 3GPP TSG-RAN WG1 MEETING #24, Orlando, USA, (20020218), pages 1 - 20, XP002380349 [A] 1-5 * the whole document *
International search[A]WO9937111  (NIPPON TELEGRAPH & TELEPHONE [JP], et al);
 [A]WO9953630  (ERICSSON TELEFON AB L M [SE]);
 [A]WO0131824  (SK TELECOM CO LTD [KR], et al);
 [A]JP2001128219  (LUCENT TECHNOLOGIES INC)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.