blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1579727

EP1579727 - METHOD AND APPARATUS FOR DATA AND CONTROL PACKET SCHEDULING IN WDM PHOTONIC BURST-SWITCHED NETWORKS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.07.2012
Database last updated on 24.08.2024
Most recent event   Tooltip04.10.2013Lapse of the patent in a contracting state
New state(s): HU
published on 06.11.2013  [2013/45]
Applicant(s)For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
[N/P]
Former [2005/39]For all designated states
INTEL CORPORATION
2200 Mission College Boulevard
Santa Clara, CA 95052 / US
Inventor(s)01 / OVADIA, Shlomo
1576 Willow Oaks Drive
San Jose, CA 95125 / US
02 / MACIOCCO, Christian
16322 SW Stahl Drive
Tigard, OR 97223 / US
 [2005/39]
Representative(s)Dunlop, Hugh Christopher, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[N/P]
Former [2005/39]Dunlop, Hugh Christopher, et al
R G C Jenkins & Co. 26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date03814649.405.12.2003
[2005/39]
WO2003US38613
Priority number, dateUS2002032857124.12.2002         Original published format: US 328571
[2005/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2004062313
Date:22.07.2004
Language:EN
[2004/30]
Type: A1 Application with search report 
No.:EP1579727
Date:28.09.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 22.07.2004 takes the place of the publication of the European patent application.
[2005/39]
Type: B1 Patent specification 
No.:EP1579727
Date:31.08.2011
Language:EN
[2011/35]
Search report(s)International search report - published on:EP22.07.2004
ClassificationIPC:H04Q11/00
[2005/39]
CPC:
H04Q11/0062 (EP,US); H04Q11/0066 (KR); H04B10/2581 (KR);
H04Q2011/0073 (EP,KR,US); H04Q2011/0084 (EP,KR,US); H04Q2011/0086 (EP,KR,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2005/39]
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR DATEN- UNDSTEUERPAKETEINTEILUNG IN PHOTONISCHEN WDM-BURSTVERMITTLUNGSNETZWERKEN[2005/39]
English:METHOD AND APPARATUS FOR DATA AND CONTROL PACKET SCHEDULING IN WDM PHOTONIC BURST-SWITCHED NETWORKS[2005/39]
French:PROCEDE ET APPAREIL POUR LA PROGRAMMATION DE PAQUETS DE DONNEES ET DE COMMANDE DANS DES RESEAUX COMMUTES PAR RAFALES PHOTONIQUES DE MULTIPLEXAGE PAR LONGUEUR D'ONDE[2005/39]
Entry into regional phase20.07.2005National basic fee paid 
20.07.2005Designation fee(s) paid 
20.07.2005Examination fee paid 
Examination procedure24.06.2005Amendment by applicant (claims and/or description)
20.07.2005Examination requested  [2005/39]
13.04.2006Despatch of a communication from the examining division (Time limit: M06)
08.11.2006Reply to a communication from the examining division
11.06.2007Despatch of a communication from the examining division (Time limit: M06)
19.12.2007Reply to a communication from the examining division
20.05.2009Despatch of a communication from the examining division (Time limit: M04)
19.06.2009Reply to a communication from the examining division
11.02.2011Communication of intention to grant the patent
13.06.2011Fee for grant paid
13.06.2011Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.04.2006
Opposition(s)01.06.2012No opposition filed within time limit [2012/32]
Request for further processing for:08.11.2006Request for further processing filed
08.11.2006Full payment received (date of receipt of payment)
Request granted
22.12.2006Decision despatched
Fees paidRenewal fee
15.12.2005Renewal fee patent year 03
13.12.2006Renewal fee patent year 04
12.12.2007Renewal fee patent year 05
20.03.2008Renewal fee patent year 06
11.12.2009Renewal fee patent year 07
15.12.2010Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
HU31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
TR31.08.2011
BG30.11.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
LU05.12.2011
ES11.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
FR02.01.2012
PT02.01.2012
[2013/45]
Former [2013/44]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
TR31.08.2011
BG30.11.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
LU05.12.2011
ES11.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
FR02.01.2012
PT02.01.2012
Former [2013/29]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
BG30.11.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
LU05.12.2011
ES11.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
FR02.01.2012
PT02.01.2012
Former [2013/25]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
LU05.12.2011
ES11.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
FR02.01.2012
PT02.01.2012
Former [2013/22]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
ES11.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
FR02.01.2012
PT02.01.2012
Former [2013/19]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
FR02.01.2012
PT02.01.2012
Former [2012/49]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
CH31.12.2011
LI31.12.2011
MC31.12.2011
PT02.01.2012
Former [2012/47]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
GB05.12.2011
IE05.12.2011
MC31.12.2011
PT02.01.2012
Former [2012/46]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
GB05.12.2011
MC31.12.2011
PT02.01.2012
Former [2012/33]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
DK31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
MC31.12.2011
PT02.01.2012
Former [2012/23]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
EE31.08.2011
FI31.08.2011
IT31.08.2011
NL31.08.2011
RO31.08.2011
SE31.08.2011
SI31.08.2011
SK31.08.2011
GR01.12.2011
PT02.01.2012
Former [2012/21]AT31.08.2011
BE31.08.2011
CY31.08.2011
CZ31.08.2011
FI31.08.2011
NL31.08.2011
SE31.08.2011
SI31.08.2011
GR01.12.2011
Former [2012/17]AT31.08.2011
BE31.08.2011
CY31.08.2011
FI31.08.2011
NL31.08.2011
SE31.08.2011
SI31.08.2011
GR01.12.2011
Former [2012/12]AT31.08.2011
CY31.08.2011
FI31.08.2011
NL31.08.2011
SE31.08.2011
SI31.08.2011
GR01.12.2011
Former [2012/11]AT31.08.2011
FI31.08.2011
NL31.08.2011
SE31.08.2011
SI31.08.2011
GR01.12.2011
Former [2012/10]FI31.08.2011
NL31.08.2011
SE31.08.2011
GR01.12.2011
Former [2012/09]FI31.08.2011
NL31.08.2011
Former [2012/08]NL31.08.2011
Cited inInternational search[A]EP0876076  (NEC CORP [JP]) [A] 1-31* column 4, line 49 - column 5, line 56 *;
 [A]EP1135000  (ERICSSON TELEFON AB L M [SE]) [A] 1-31 * the whole document *;
 [PX]US2003009582  (QIAO CHUNMING [US], et al) [PX] 1,10,19,28 * paragraph [0090] - paragraph [0096] *;
 [PX]EP1303111  (CIT ALCATEL [FR]) [PX] 1,10,19,28 * column 4, paragraph 0012 - column 5, paragraph 0019 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.