blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1471182

EP1471182 - Construction built along a road for noise and fumes reduction [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  13.04.2007
Database last updated on 14.09.2024
Most recent event   Tooltip13.04.2007Application deemed to be withdrawnpublished on 16.05.2007  [2007/20]
Applicant(s)For all designated states
Wieser-Linhart, Emil Johannes, Dipl.-Ing.
Dossenweg 49
5020 Salzburg / AT
[2004/44]
Inventor(s)01 / Wieser-Linhart, Emil Johannes, Dipl.-Ing.
Dossenweg 49
5020 Salzburg / AT
 [2004/44]
Representative(s)(deleted)
[2006/48]
Former [2004/44]VA TECH Patente GmbH & Co
Penzinger Strasse 76
1141 Wien / AT
Application number, filing date04008124.202.04.2004
[2004/44]
Priority number, dateAT2003000063325.04.2003         Original published format: AT 6332003
[2004/44]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1471182
Date:27.10.2004
Language:DE
[2004/44]
Type: A3 Search report 
No.:EP1471182
Date:07.06.2006
[2006/23]
Search report(s)(Supplementary) European search report - dispatched on:EP04.05.2006
ClassificationIPC:E01C1/00, E01F8/00, B08B15/00
[2004/44]
CPC:
E01F8/0047 (EP); B08B15/02 (EP); E01C1/005 (EP);
F24F8/99 (EP)
Designated contracting states(deleted) [2007/07]
Former [2004/44]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Einrichtung zur Reduzierung der Lärm- und Schadstoffbelastung entlang eines Verkehrsweges[2004/44]
English:Construction built along a road for noise and fumes reduction[2004/44]
French:Construction le long de routes pour réduire le bruit et la pollution de l'air[2004/44]
Examination procedure31.10.2006Application deemed to be withdrawn, date of legal effect  [2007/20]
07.12.2006Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2007/20]
Fees paidPenalty fee
Additional fee for renewal fee
30.04.200603   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]DE8912236U  (MERO-RAUMSTRUKTUR GMBH & CO WUERZBURG, 8700 WUERZBURG, DE) [Y] 6-8 * page 1, line 1 - page 3, line 1 * * figures 1,2 *;
 [Y]DE29915671U  (KIRCHER HANS PETER [AT]) [Y] 3-5,16,19,21-23 * page 1, line 1 - page 2, line 19 * * figures 1-4 *;
 [XY]DE19859233  (LUTZKAT URSULA [DE]) [X] 1,9-11,15,17,20,24 * the whole document * [Y] 2-8,12-14,16,18,19,21-23,25-30;
 [DY]US2002009793  (WIESER-LINHART EMIL A J [AT]) [DY] 2,12-14,18,25-30* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.