blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1495858

EP1495858 - LIGHTWEIGHT MATERIAL STRUCTURE MADE OF METAL COMPOSITE MATERIAL [Right-click to bookmark this link]
Former [2005/02]Lightweight material structure made of metal composite material
[2019/12]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  05.07.2019
FormerGrant of patent is intended
Status updated on  21.02.2019
Most recent event   Tooltip24.06.2022Lapse of the patent in a contracting state
New state(s): CY, HU
published on 27.07.2022  [2022/30]
Applicant(s)For all designated states
Airbus Operations GmbH
Kreetslag 10
21129 Hamburg / DE
[2016/44]
Former [2005/02]For all designated states
Airbus Deutschland GmbH
Kreetslag 10
21129 Hamburg / DE
Inventor(s)01 / Vichniakov, Alexei
Siedlung 19
39171 Bahrendorf / DE
02 / Schmidt, Hans-Jürgen
An der Rehwiese 26
21614 Buxtehude / DE
 [2019/32]
Former [2005/02]01 / Vichniakov, Alexei, Dr.-Ing.
Siedlung 19
39171 Bahrendorf / DE
02 / Schmidt, Hans-Jürgen, Dipl.-Ing.
An der Rehwiese 26
21614 Buxtehude / DE
Representative(s)Klöpper, Ute
Airbus Operations GmbH
Patentabteilung XIG
Kreetslag 10
29129 Hamburg / DE
[N/P]
Former [2019/32]Klöpper, Ute
Airbus Deutschland GmbH
Abt.: ER-Patente
Postfach 95 01 09
21111 Hamburg / DE
Former [2005/02]Klöpper, Ute, Dipl.-Ing.
Airbus Deutschland GmbH, Abt.: ER-Patente, Postfach 95 01 09
21111 Hamburg / DE
Application number, filing date04015293.630.06.2004
[2005/02]
Priority number, dateDE2003103070908.07.2003         Original published format: DE 10330709
[2005/02]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1495858
Date:12.01.2005
Language:DE
[2005/02]
Type: B1 Patent specification 
No.:EP1495858
Date:07.08.2019
Language:DE
[2019/32]
Search report(s)(Supplementary) European search report - dispatched on:EP22.11.2004
ClassificationIPC:B32B3/08, B32B3/14, B32B15/08, B64C1/06, B64C1/12, B64C1/00
[2005/02]
CPC:
B32B3/08 (EP,US); B32B15/092 (US); B32B15/08 (EP,US);
B32B15/20 (US); B32B27/38 (US); B32B3/14 (EP,US);
B32B7/12 (US); B32B2260/021 (US); B32B2260/046 (US);
B32B2305/08 (US); B32B2311/18 (US); Y10T428/249924 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/32]
Former [2005/02]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:LEICHTBAUSTRUKTUR AUS METALLISCHEN SCHICHTWERKSTOFFEN[2019/12]
English:LIGHTWEIGHT MATERIAL STRUCTURE MADE OF METAL COMPOSITE MATERIAL[2019/12]
French:STRUCTURE LÉGÈRE D'UN MATÉRIAU COMPOSITE MÉTALLIQUE[2019/12]
Former [2005/02]Leichtbaustruktur aus metallischen Schichtwerkstoffen
Former [2005/02]Lightweight material structure made of metal composite material
Former [2005/02]Structure légère d'un matériau composite métallique
Examination procedure12.07.2005Examination requested  [2005/36]
26.02.2007Despatch of a communication from the examining division (Time limit: M06)
05.09.2007Reply to a communication from the examining division
06.11.2015Despatch of a communication from the examining division (Time limit: M06)
14.06.2016Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
19.08.2016Reply to a communication from the examining division
22.02.2019Communication of intention to grant the patent
24.06.2019Fee for grant paid
24.06.2019Fee for publishing/printing paid
24.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  26.02.2007
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
19.08.2016Request for further processing filed
19.08.2016Full payment received (date of receipt of payment)
Request granted
05.09.2016Decision despatched
Fees paidRenewal fee
30.06.2006Renewal fee patent year 03
02.07.2007Renewal fee patent year 04
30.06.2008Renewal fee patent year 05
30.06.2009Renewal fee patent year 06
30.06.2010Renewal fee patent year 07
30.06.2011Renewal fee patent year 08
02.07.2012Renewal fee patent year 09
20.06.2013Renewal fee patent year 10
25.06.2014Renewal fee patent year 11
19.06.2015Renewal fee patent year 12
27.06.2016Renewal fee patent year 13
27.06.2017Renewal fee patent year 14
27.06.2018Renewal fee patent year 15
25.06.2019Renewal fee patent year 16
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.06.2004
CY07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
IT07.08.2019
MC07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
[2022/27]
Former [2021/12]CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
IT07.08.2019
MC07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/37]CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
IT07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
SE07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/25]CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
IT07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
SE07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/23]DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
IT07.08.2019
NL07.08.2019
PL07.08.2019
RO07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/22]DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
NL07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/17]ES07.08.2019
FI07.08.2019
NL07.08.2019
SE07.08.2019
TR07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/12]ES07.08.2019
FI07.08.2019
NL07.08.2019
SE07.08.2019
BG07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/10]FI07.08.2019
NL07.08.2019
SE07.08.2019
BG07.11.2019
PT09.12.2019
Former [2020/09]FI07.08.2019
NL07.08.2019
Documents cited:Search[A]US4411380  (MCWITHEY ROBERT R [US], et al) [A] 1,4-6,8-10 * figure 2; claim 1 *;
 [A]US4500589  (SCHIJVE JACOBUS [NL], et al) [A] 8-13 * claim 1 *;
 [A]WO9215453  (SECR DEFENCE BRIT [GB]) [A] 4-10,13,15 * page 9; claims 1-4,10; table . *;
 [XA]WO9853989  (AKZO NOBEL NV [NL], et al) [X] 1 * page 6, lines 19-31; figure 1; claims 1,4-8,11-14 * [A] 4-10;
 [A]US6114050  (WESTRE WILLARD N [US], et al) [A] 1 * column 3, lines 31-33; claims 1,37-39 *;
 [PX]EP1393893  (AIRBUS GMBH [DE]) [PX] 1-3,16-21 * claims 1-10 *;
 [DPXA]DE10238460  (AIRBUS GMBH [DE]) [DPX] 1-3,16-21 * figure 2; claims 1,5-10 *[A] 4,14
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.