blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1512793

EP1512793 - Paving block [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.05.2009
Database last updated on 13.09.2024
Most recent event   Tooltip05.11.2010Lapse of the patent in a contracting state
New state(s): GR
published on 08.12.2010  [2010/49]
Applicant(s)For all designated states
KRONIMUS AG
Josef-Herrmann-Strasse 4-6
76473 Iffezheim / DE
[N/P]
Former [2008/29]For all designated states
KRONIMUS AG
Josef-Hermann-Strasse 4-6
76473 Iffezheim / DE
Former [2005/11]For all designated states
Kronimus AG
Josef-Hermann-Strasse 4-6
76473 Iffezheim / DE
Former [2005/10]For all designated states
KRONIMUS AG
Josef-Herrmann-Strasse 4-6
76473 Iffezheim / DE
Inventor(s)01 / Kronimus, Martin
Josef-Hermann-Strasse 4-6
76473 Iffezheim / DE
 [2005/10]
Representative(s)Otten, Herbert
Otten, Roth, Dobler & Partner mbB
Patentanwälte
Grosstobeler Strasse 39
88276 Berg/Ravensburg / DE
[N/P]
Former [2005/10]Otten, Herbert
Patentanwälte Eisele, Otten, Roth & Dobler Karlstrasse 8
88212 Ravensburg / DE
Application number, filing date04020358.027.08.2004
[2005/10]
Priority number, dateDE200314059401.09.2003         Original published format: DE 10340594
DE2003216235U20.10.2003         Original published format: DE 20316235 U
[2005/10]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1512793
Date:09.03.2005
Language:DE
[2005/10]
Type: A3 Search report 
No.:EP1512793
Date:31.08.2005
[2005/35]
Type: B1 Patent specification 
No.:EP1512793
Date:16.07.2008
Language:DE
[2008/29]
Search report(s)(Supplementary) European search report - dispatched on:EP15.07.2005
ClassificationIPC:E01C5/06
[2005/10]
CPC:
E01C11/229 (EP); E01C5/00 (EP); E01C2201/02 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2005/10]
TitleGerman:Pflasterstein[2005/10]
English:Paving block[2005/10]
French:Pierre à pavé[2005/10]
Examination procedure02.11.2005Examination requested  [2005/52]
07.06.2006Despatch of a communication from the examining division (Time limit: M04)
08.08.2006Reply to a communication from the examining division
28.03.2008Communication of intention to grant the patent
03.06.2008Fee for grant paid
03.06.2008Fee for publishing/printing paid
Opposition(s)17.04.2009No opposition filed within time limit [2009/26]
Fees paidRenewal fee
24.07.2006Renewal fee patent year 03
30.07.2007Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY16.07.2008
CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
PL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
TR16.07.2008
MC31.08.2008
BG16.10.2008
GB16.10.2008
SE16.10.2008
GR17.10.2008
ES27.10.2008
PT16.12.2008
[2010/49]
Former [2010/38]CY16.07.2008
CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
PL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
TR16.07.2008
MC31.08.2008
BG16.10.2008
GB16.10.2008
SE16.10.2008
ES27.10.2008
PT16.12.2008
Former [2010/34]CY16.07.2008
CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
PL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
GB16.10.2008
SE16.10.2008
ES27.10.2008
PT16.12.2008
Former [2010/24]CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
PL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
GB16.10.2008
SE16.10.2008
ES27.10.2008
PT16.12.2008
Former [2010/09]CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
GB16.10.2008
SE16.10.2008
ES27.10.2008
PT16.12.2008
Former [2010/01]CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
GB16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/40]CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
IT16.07.2008
NL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/26]CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
NL16.07.2008
RO16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/24]CZ16.07.2008
DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
NL16.07.2008
SI16.07.2008
SK16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/23]DK16.07.2008
EE16.07.2008
FI16.07.2008
IE16.07.2008
NL16.07.2008
SI16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/22]DK16.07.2008
EE16.07.2008
FI16.07.2008
NL16.07.2008
SI16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/20]DK16.07.2008
FI16.07.2008
NL16.07.2008
SI16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/15]FI16.07.2008
NL16.07.2008
SI16.07.2008
MC31.08.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/14]FI16.07.2008
NL16.07.2008
SI16.07.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/12]FI16.07.2008
NL16.07.2008
BG16.10.2008
ES27.10.2008
PT16.12.2008
Former [2009/09]NL16.07.2008
ES27.10.2008
PT16.12.2008
Documents cited:Search[DA]WO0159217  (SF KOOP GMBH BETON KONZEPTE [DE], et al) [DA] 1,3,4* the whole document *
by applicantWO0159217
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.