blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1491697

EP1491697 - Concrete floor part [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.05.2009
Database last updated on 11.09.2024
Most recent event   Tooltip30.09.2011Lapse of the patent in a contracting state
New state(s): CY, TR
published on 02.11.2011  [2011/44]
Applicant(s)For all designated states
Dycore B.V.
Ambachtsweg 16
4906 CH Oosterhout / NL
[2005/01]
Inventor(s)01 / De Wit, Johannes
p/a Dycore B.V. Postbus 197
4900 AD Oosterhout / NL
 [2005/01]
Representative(s)Ferguson, Alexander
Octrooibureau Vriesendorp & Gaade B.V.
P.O. Box 266
2501 AW Den Haag / NL
[N/P]
Former [2005/01]Ferguson, Alexander
Octrooibureau Vriesendorp & Gaade, P.O. Box 266
2501 AW Den Haag / NL
Application number, filing date04076771.716.06.2004
[2005/01]
Priority number, dateNL2003102376127.06.2003         Original published format: NL 1023761
[2005/01]
Filing languageNL
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1491697
Date:29.12.2004
Language:EN
[2004/53]
Type: B1 Patent specification 
No.:EP1491697
Date:02.07.2008
Language:EN
[2008/27]
Search report(s)(Supplementary) European search report - dispatched on:EP07.10.2004
ClassificationIPC:E04B5/02, E04B5/48, B28B23/02
[2005/01]
CPC:
E04B5/48 (EP); B28B23/028 (EP); E04B5/04 (EP);
B28B7/085 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2005/01]
TitleGerman:Betonbodenelement[2005/01]
English:Concrete floor part[2005/01]
French:Elément de plancher en béton[2005/01]
Examination procedure23.03.2005Examination requested  [2005/21]
14.03.2007Despatch of a communication from the examining division (Time limit: M04)
08.06.2007Reply to a communication from the examining division
19.12.2007Communication of intention to grant the patent
17.04.2008Fee for grant paid
17.04.2008Fee for publishing/printing paid
Opposition(s)03.04.2009No opposition filed within time limit [2009/24]
Fees paidRenewal fee
26.05.2006Renewal fee patent year 03
23.05.2007Renewal fee patent year 04
20.05.2008Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT02.07.2008
CY02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
IT02.07.2008
PL02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
TR02.07.2008
BG02.10.2008
SE02.10.2008
GR03.10.2008
ES13.10.2008
PT02.12.2008
HU03.01.2009
[2011/43]
Former [2011/32]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
IT02.07.2008
PL02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
SE02.10.2008
GR03.10.2008
ES13.10.2008
PT02.12.2008
HU03.01.2009
Former [2010/50]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
IT02.07.2008
PL02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
SE02.10.2008
GR03.10.2008
ES13.10.2008
PT02.12.2008
Former [2010/24]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
IT02.07.2008
PL02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
SE02.10.2008
ES13.10.2008
PT02.12.2008
Former [2010/09]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
IT02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
SE02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/40]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
IT02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/26]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
RO02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/24]AT02.07.2008
CZ02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
SI02.07.2008
SK02.07.2008
BG02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/22]AT02.07.2008
DK02.07.2008
EE02.07.2008
FI02.07.2008
SI02.07.2008
BG02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/20]AT02.07.2008
DK02.07.2008
FI02.07.2008
SI02.07.2008
BG02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/13]AT02.07.2008
FI02.07.2008
SI02.07.2008
BG02.10.2008
ES13.10.2008
PT02.12.2008
Former [2009/09]SI02.07.2008
ES13.10.2008
PT02.12.2008
Former [2008/48]SI02.07.2008
Documents cited:Search[X]FR1533735  (LEEMHUIS) [X] 1-3,9,13 * page 2, column 1, paragraph L - column 2, paragraph 1; figure - *;
 [X]US3442058  (NASLUND KENNETH C, et al) [X] 1-6,13 * abstract * * column 3, line 3 - line 44 *;
 [XY]DE3009378  (RUPPMANN OTTO) [X] 1-3,13 [Y] 10-12;
 [Y]DE3702447  (LIAS FRANKEN LEICHTBAU GMBH [DE]) [Y] 10-12 * figure - *;
 [XA]EP1126095  (ZAMBELLI SERGIO [IT], et al) [X] 1-3,13 * figure - * [A] 9;
 [XA]US2003097806  (BROWN JOHN G [US]) [X] 24-26 * paragraphs [0752] - [0758]; figures 100-106 *[A] 14
by applicantFR1525178
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.