EP1544669 - Optical signal regenerator, use of such a device and system including such a device [Right-click to bookmark this link] | |||
Former [2005/25] | optical signal regenerator, use of such a device and system including such a device | ||
[2011/29] | Status | No opposition filed within time limit Status updated on 05.10.2012 Database last updated on 22.11.2024 | Most recent event Tooltip | 04.10.2013 | Lapse of the patent in a contracting state New state(s): HU | published on 06.11.2013 [2013/45] | Applicant(s) | For all designated states FRANCE TELECOM 6 Place d'Alleray 75015 Paris / FR | [N/P] |
Former [2005/25] | For all designated states FRANCE TELECOM 6, Place d'Alleray 75015 Paris / FR | Inventor(s) | 01 /
Cuenot, Benjamin Résidence Beauchamp - Bât. C 74 route de Tréguier 22300 Lannion / FR | 02 /
Pincemin, Erwan Kernevez 22290 Gommenec'h / FR | [2011/48] |
Former [2011/29] | 01 /
Cuenot, Benjamin Résidence Beauchamp - Bât. C 74 route de Tréguier 22300 Lannion / FR | ||
02 /
Pincemin, Erwan Kernevez 22290 Gommenec'h / FR | |||
Former [2005/25] | 01 /
Cuenot, Benjamin Résidence Beauchamp - Bât. C 74 route de Tréguier 22300 Lannion / FR | ||
02 /
Pincemin, Erwan Kernevez 22290 Gommenech / FR | Representative(s) | Benetiere, Marion Orange IMTW/OLPS/IPL/PAT Orange Gardens 44 Avenue de la République, CS 50010 92326 Châtillon Cedex / FR | [N/P] |
Former [2011/48] | Benetiere, Marion France Telecom R&D/PIV/Brevets 38-40, rue du Général Leclerc 92794 Issy les Moulineaux cedex 09 / FR | ||
Former [2008/22] | Benetiere, Marion France Telecom R&D/PIV/Brevets 38-40, rue du Général Leclerc 92794 Issy les Moulineaux cedex 09 / FR | ||
Former [2005/25] | Remy, Vincent Noel Paul, et al Cabinet Lhermet La Bigne & Remy, 191 rue Saint-Honoré 75001 Paris / FR | Application number, filing date | 04293003.2 | 15.12.2004 | [2005/25] | Priority number, date | FR20030015075 | 19.12.2003 Original published format: FR 0315075 | [2005/25] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP1544669 | Date: | 22.06.2005 | Language: | FR | [2005/25] | Type: | B1 Patent specification | No.: | EP1544669 | Date: | 30.11.2011 | Language: | FR | [2011/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.03.2005 | Classification | IPC: | G02F1/35, H04B10/17 | [2005/25] | CPC: |
H04B10/29 (EP,US);
H04B10/00 (KR);
H04B10/50 (KR);
H04B10/60 (KR)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2005/25] | Title | German: | Vorrichtung zur Regenerierung eines optischen Signals, Verwendung einer derartigen Vorrichtung und Übertragungssystem mit einer derartigen Vorrichtung | [2005/25] | English: | Optical signal regenerator, use of such a device and system including such a device | [2011/29] | French: | Dispositif de régéneration d'un signal optique, utilisation d'un tel dispositif et installation comportant un tel dispositif | [2005/25] |
Former [2005/25] | optical signal regenerator, use of such a device and system including such a device | Examination procedure | 19.12.2005 | Examination requested [2006/07] | 16.01.2006 | Despatch of a communication from the examining division (Time limit: M06) | 11.07.2006 | Reply to a communication from the examining division | 10.08.2006 | Despatch of a communication from the examining division (Time limit: M06) | 12.02.2007 | Reply to a communication from the examining division | 05.11.2007 | Cancellation of oral proceeding that was planned for 13.11.2007 | 05.11.2007 | Minutes of oral proceedings despatched | 13.11.2007 | Date of oral proceedings (cancelled) | 26.03.2008 | Despatch of communication that the application is refused, reason: substantive examination {1} | 29.06.2011 | Communication of intention to grant the patent | 24.10.2011 | Fee for grant paid | 24.10.2011 | Fee for publishing/printing paid | Appeal following examination | 16.05.2008 | Appeal received No. T1547/08 | 18.07.2008 | Statement of grounds filed | 04.04.2011 | Result of appeal procedure: remittal for grant | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.01.2006 | Opposition(s) | 31.08.2012 | No opposition filed within time limit [2012/45] | Fees paid | Renewal fee | 27.12.2006 | Renewal fee patent year 03 | 27.12.2007 | Renewal fee patent year 04 | 27.03.2008 | Renewal fee patent year 05 | 30.12.2009 | Renewal fee patent year 06 | 24.12.2010 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 30.11.2011 | CY | 30.11.2011 | CZ | 30.11.2011 | DK | 30.11.2011 | EE | 30.11.2011 | FI | 30.11.2011 | HU | 30.11.2011 | IE | 30.11.2011 | IT | 30.11.2011 | LT | 30.11.2011 | NL | 30.11.2011 | PL | 30.11.2011 | RO | 30.11.2011 | SE | 30.11.2011 | SI | 30.11.2011 | SK | 30.11.2011 | TR | 30.11.2011 | LU | 15.12.2011 | BE | 31.12.2011 | CH | 31.12.2011 | LI | 31.12.2011 | MC | 31.12.2011 | BG | 29.02.2012 | GR | 01.03.2012 | ES | 11.03.2012 | IS | 30.03.2012 | PT | 30.03.2012 | [2013/45] |
Former [2013/44] | AT | 30.11.2011 | |
CY | 30.11.2011 | ||
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
FI | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
TR | 30.11.2011 | ||
LU | 15.12.2011 | ||
BE | 31.12.2011 | ||
CH | 31.12.2011 | ||
LI | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
ES | 11.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2013/29] | AT | 30.11.2011 | |
CY | 30.11.2011 | ||
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
FI | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
LU | 15.12.2011 | ||
BE | 31.12.2011 | ||
CH | 31.12.2011 | ||
LI | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
ES | 11.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2013/25] | AT | 30.11.2011 | |
CY | 30.11.2011 | ||
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
LU | 15.12.2011 | ||
BE | 31.12.2011 | ||
CH | 31.12.2011 | ||
LI | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
ES | 11.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2013/22] | AT | 30.11.2011 | |
CY | 30.11.2011 | ||
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
BE | 31.12.2011 | ||
CH | 31.12.2011 | ||
LI | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
ES | 11.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2013/07] | AT | 30.11.2011 | |
CY | 30.11.2011 | ||
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
BE | 31.12.2011 | ||
CH | 31.12.2011 | ||
LI | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/49] | CY | 30.11.2011 | |
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
BE | 31.12.2011 | ||
CH | 31.12.2011 | ||
LI | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/46] | CY | 30.11.2011 | |
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
BE | 31.12.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/37] | CY | 30.11.2011 | |
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
IT | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
PL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/36] | CY | 30.11.2011 | |
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
RO | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
SK | 30.11.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/35] | CY | 30.11.2011 | |
CZ | 30.11.2011 | ||
DK | 30.11.2011 | ||
EE | 30.11.2011 | ||
IE | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
MC | 31.12.2011 | ||
BG | 29.02.2012 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/34] | CY | 30.11.2011 | |
CZ | 30.11.2011 | ||
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
MC | 31.12.2011 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/33] | CY | 30.11.2011 | |
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
MC | 31.12.2011 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/28] | CY | 30.11.2011 | |
LT | 30.11.2011 | ||
NL | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/24] | LT | 30.11.2011 | |
NL | 30.11.2011 | ||
SE | 30.11.2011 | ||
SI | 30.11.2011 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/23] | LT | 30.11.2011 | |
NL | 30.11.2011 | ||
GR | 01.03.2012 | ||
IS | 30.03.2012 | ||
PT | 30.03.2012 | ||
Former [2012/21] | LT | 30.11.2011 | |
IS | 30.03.2012 | ||
Former [2012/20] | LT | 30.11.2011 | Documents cited: | Search | [A]EP1271808 (NIPPON TELEGRAPH & TELEPHONE [JP]) [A] 1-9 * abstract * * paragraph [0053] - paragraph [0054] * * paragraph [0093] - paragraph [0094] * * paragraph [0107] - paragraph [0108] * * figure 14 *; | [A]US2003210912 (LEUTHOLD JUERG [US], et al) [A] 1 * paragraph [0025] - paragraph [0027] * * figures 1,4,5 * * paragraph [0069] *; | [A] - HANNA M ET AL, "Performance assessment of DPSK soliton transmission system", ELECTRON. LETT. (UK), ELECTRONICS LETTERS, IEE, UK, (20010510), vol. 37, no. 10, ISSN 0013-5194, pages 644 - 646, XP002286282 [A] 1,3-5,8,9 * the whole document * DOI: http://dx.doi.org/10.1049/el:20010433 | [A] - WINZER P J ET AL, "Degradations in balanced DPSK receivers", IEEE PHOTONICS TECHNOL. LETT. (USA), IEEE PHOTONICS TECHNOLOGY LETTERS, IEEE, USA, (200309), vol. 15, no. 9, ISSN 1041-1135, pages 1282 - 1284, XP002286283 [A] 1-9 * the whole document * DOI: http://dx.doi.org/10.1109/LPT.2003.816112 | [A] - GNAUCK A H ET AL, "2.5 Tb/s (64*42.7 Gb/s) transmission over 40*100 km NZDSF using RZ-DPSK format and all-Raman-amplified spans", WASHINGTON, DC, USA, OPT SOC. AMERICA, USA, (2002), ISBN 1-55752-701-6, pages FC2 - 1, XP002286284 [A] 1 * the whole document * DOI: http://dx.doi.org/10.1109/OFC.2002.1036773 | [A] - RYU S ET AL, "Transmission performance improvement in differential phase-shift keying wavelength-division multiplexed transmission systems using all-optical 2R repeaters", PISCATAWAY, NJ, USA, IEEE, USA, (2001), ISBN 0-7803-7105-4, pages 677 - 678 vol.2, XP002286285 [A] 1 * the whole document * DOI: http://dx.doi.org/10.1109/LEOS.2001.968995 | Examination | US2010202783 | - P.V. MAMYSHEV, "All-optical data regeneration based on self-phase modulation effect", ECOC'98, Madrid, Spain, (19980920), pages 475 - 476 | - P.S. DEVGAN ET AL., "SOA-based regenerative amplification of phase noise degraded DPSK signals", OFC'2005, (200502), page PDP34 | - V.S. GRIGORYAN ET AL., "SOA-based Regenerative Amplification of Phase-Noise-Degraded DPSK Signals: Dynamic Analysis and Demonstration", J. OF LIGHTWAVE TECHNOLOGY, (20060101), vol. 24, no. 1, pages 135 - 142 | - P.JOHANNISON ET AL, "Suppression of phase error in DPSK data by amplitude regenerat", OPTICS LETTERS, (20060515), vol. 31, no. 10, pages 1385 - 1387, XP001242764 DOI: http://dx.doi.org/10.1364/OL.31.001385 |