blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1589257

EP1589257 - Double clutch transmission for motor vehicle [Right-click to bookmark this link]
Former [2005/43]Gearbox architectures for a family of single and double clutch transmissions for motor vehicle
[2007/37]
StatusNo opposition filed within time limit
Status updated on  10.04.2009
Database last updated on 19.10.2024
Most recent event   Tooltip30.09.2011Lapse of the patent in a contracting state
New state(s): CY, TR
published on 02.11.2011  [2011/44]
Applicant(s)For all designated states
C.R.F. Società Consortile per Azioni
Strada Torino, 50
10043 Orbassano (TO) / IT
[N/P]
Former [2008/23]For all designated states
C.R.F. SOCIETÀ CONSORTILE PER AZIONI
Strada Torino, 50
10043 Orbassano (TO) / IT
Former [2005/43]For all designated states
C.R.F. Società Consortile per Azioni
Strada Torino, 50
10043 Orbassano (TO) / IT
Inventor(s)01 / Baldascini, Filippo
Strada Torino 50
10043 Orbassano (Torino) / IT
02 / Caenazzo, Dario
Via Giosué Carducci 6
10060 Scalenghe (Torino) / IT
03 / Mesiti, Domenico
Via Paviolo 5
10040 Leini' (Torino) / IT
04 / Pregnolato, Gianluigi
Via S. Maria 45
1-10024 Moncalieri (Torino) / IT
 [2008/03]
Former [2005/43]01 / Baldascini, Filippo
Strada Torino 50
10043 Orbassano (Torino) / IT
02 / Caenazzo, Dario
Via Giosué Carducci 6
10060 Scalenghe (Torino) / IT
03 / Mesiti, Domenico
Via Paviolo 5
10040 Leini' (Torino) / IT
04 / Pregnolato, Gianluigi
Via S. Maria 45
10024 Moncalieri (Torion) / IT
Representative(s)Quinterno, Giuseppe, et al
Jacobacci & Partners S.p.A.
Corso Emilia 8
10152 Torino / IT
[N/P]
Former [2005/43]Quinterno, Giuseppe, et al
Jacobacci & Partners S.p.A. Corso Emilia, 8
10152 Torino / IT
Application number, filing date04425283.123.04.2004
[2005/43]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1589257
Date:26.10.2005
Language:EN
[2005/43]
Type: B1 Patent specification 
No.:EP1589257
Date:04.06.2008
Language:EN
[2008/23]
Search report(s)(Supplementary) European search report - dispatched on:EP15.10.2004
ClassificationIPC:F16H3/093
[2007/49]
CPC:
F16H3/006 (EP,US); F16H3/093 (EP,US); F16H2003/0931 (EP,US);
F16H2200/0052 (EP,US); F16H2200/0056 (EP,US); Y10T74/19233 (EP,US)
Former IPC [2005/43]F16H3/093, F16H103/14
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2005/43]
TitleGerman:Fahrzeuggetriebe mit doppelter Kupplung[2008/22]
English:Double clutch transmission for motor vehicle[2008/22]
French:Boite de vitesses de véhicules à embrayage double[2007/37]
Former [2005/43]Getriebearchitekturen für eine Fahrzeuggetriebefamilie mit einer einfachen oder doppelten Kupplung
Former [2005/43]Gearbox architectures for a family of single and double clutch transmissions for motor vehicle
Former [2005/43]Architectures de boites de vitesses pour une famille de transmissions de véhicules à embrayage simple ou double
Examination procedure21.04.2006Examination requested  [2006/23]
19.10.2006Despatch of a communication from the examining division (Time limit: M04)
26.02.2007Reply to a communication from the examining division
30.10.2007Communication of intention to grant the patent
05.03.2008Fee for grant paid
05.03.2008Fee for publishing/printing paid
Opposition(s)05.03.2009No opposition filed within time limit [2009/20]
Fees paidRenewal fee
21.02.2006Renewal fee patent year 03
22.02.2007Renewal fee patent year 04
22.02.2008Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT04.06.2008
BE04.06.2008
CY04.06.2008
CZ04.06.2008
DK04.06.2008
EE04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
TR04.06.2008
BG04.09.2008
SE04.09.2008
GR05.09.2008
ES15.09.2008
PT04.11.2008
HU05.12.2008
[2011/43]
Former [2011/32]AT04.06.2008
BE04.06.2008
CZ04.06.2008
DK04.06.2008
EE04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
BG04.09.2008
SE04.09.2008
GR05.09.2008
ES15.09.2008
PT04.11.2008
HU05.12.2008
Former [2010/50]AT04.06.2008
BE04.06.2008
CZ04.06.2008
DK04.06.2008
EE04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
BG04.09.2008
SE04.09.2008
GR05.09.2008
ES15.09.2008
PT04.11.2008
Former [2009/23]AT04.06.2008
BE04.06.2008
CZ04.06.2008
DK04.06.2008
EE04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
BG04.09.2008
SE04.09.2008
ES15.09.2008
PT04.11.2008
Former [2009/22]AT04.06.2008
BE04.06.2008
CZ04.06.2008
DK04.06.2008
EE04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
SE04.09.2008
ES15.09.2008
PT04.11.2008
Former [2009/20]AT04.06.2008
BE04.06.2008
CZ04.06.2008
DK04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
SE04.09.2008
ES15.09.2008
PT04.11.2008
Former [2009/14]AT04.06.2008
BE04.06.2008
CZ04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
RO04.06.2008
SI04.06.2008
SK04.06.2008
SE04.09.2008
ES15.09.2008
PT04.11.2008
Former [2009/13]AT04.06.2008
BE04.06.2008
CZ04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
SI04.06.2008
SK04.06.2008
SE04.09.2008
ES15.09.2008
PT04.11.2008
Former [2009/07]AT04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
SI04.06.2008
SE04.09.2008
ES15.09.2008
Former [2009/01]AT04.06.2008
FI04.06.2008
NL04.06.2008
PL04.06.2008
SI04.06.2008
ES15.09.2008
Former [2008/50]AT04.06.2008
FI04.06.2008
PL04.06.2008
SI04.06.2008
ES15.09.2008
Former [2008/48]SI04.06.2008
ES15.09.2008
Former [2008/47]ES15.09.2008
Documents cited:Search[A]US4461188  (FISHER ALAN R [US]) [A] 1,4-7,12 * the whole document *;
 [X]US5311789  (HENZLER HELGA [DE], et al) [X] 1,2,4-6 * column 5, line 47 - column 6, line 14; figure 1 *;
 [A]EP1067312  (FORD GLOBAL TECH INC [US]) [A] 1,10 * abstract *;
 [X]EP1077336  (FORD GLOBAL TECH INC [US]) [X] 1,5-7 * the whole document *;
 [X]FR2802600  (RENAULT [FR]) [X] 1,2,5-9,11,12 * page 13, line 26 - page 15; figures 1-13 *;
 [A]EP1245863  (FIAT RICERCHE [IT]) [A] 1,13,14* figure 1; claim 1 *
ExaminationEP1544505
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.