blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1657004

EP1657004 - Process and production line for manufacturing hot ultrathin steel strips with two casting lines for a single endless rolling line [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.01.2011
Database last updated on 04.06.2024
Most recent event   Tooltip28.09.2012Lapse of the patent in a contracting state
New state(s): LU
published on 31.10.2012  [2012/44]
Applicant(s)For all designated states
ARVEDI, Giovanni
Via Mercatello, 26
I-26100 Cremona / IT
[2006/20]
Inventor(s)01 / Arvedi, Giovanni
Via Mercatello 26
26100 Cremona CR / IT
02 / Manini, Luciano
Via L.Manara 4/B
26010 Azzanello CR / IT
03 / Soldi, Giacomo
Via Filippo Corridoni 1
26040 Derovere CR / IT
04 / Bianchi, Andrea Teodoro
Via S.Lorenzo 6
26034 Piadena CR / IT
 [2006/20]
Representative(s)Adorno, Silvano, et al
c/o SOCIETA' ITALIANA BREVETTI S.p.A.
Via Carducci, 8
20123 Milano / IT
[N/P]
Former [2006/20]Adorno, Silvano, et al
c/o SOCIETA' ITALIANA BREVETTI S.p.A. Via Carducci, 8
20123 Milano / IT
Application number, filing date04425805.128.10.2004
[2006/20]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1657004
Date:17.05.2006
Language:EN
[2006/20]
Type: B1 Patent specification 
No.:EP1657004
Date:24.03.2010
Language:EN
[2010/12]
Search report(s)(Supplementary) European search report - dispatched on:EP22.02.2005
ClassificationIPC:B21C47/24, B21B1/46, C21D9/68
[2006/20]
CPC:
B21C47/245 (EP,US); B21B1/46 (KR); B21B1/40 (KR);
B21B1/463 (EP,US); B21B45/004 (EP,US); C21D9/54 (KR);
C21D9/68 (EP,KR,US); B21B1/26 (EP,US); B21B2015/0014 (EP,US);
B21B2015/0057 (EP,US); B21B2015/0064 (EP,US); B21B2201/14 (EP,US);
B21B39/12 (EP,US); B21B45/008 (EP,US); C21D8/0215 (EP,US);
C21D8/0226 (EP,US); C21D9/60 (EP,US); Y02P10/25 (EP,US);
Y02P70/10 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/20]
Extension statesHR25.09.2006
TitleGerman:Verfahren und Produktionsanlage zur Herstellung von heissen ultradünnen Stahlbändern mit zwei Anlagen zum stranggiessen für eine einzelne kontinuierliche Waltzstrasse[2006/20]
English:Process and production line for manufacturing hot ultrathin steel strips with two casting lines for a single endless rolling line[2006/20]
French:Procédé et ligne de production pour la fabrication de bandes ultrafines en acier présentant deux lignes de coulée pour une seule ligne de laminage en continu[2006/20]
Examination procedure22.03.2005Examination requested  [2006/20]
13.04.2006Despatch of a communication from the examining division (Time limit: M04)
07.07.2006Reply to a communication from the examining division
02.04.2007Despatch of a communication from the examining division (Time limit: M04)
23.07.2007Reply to a communication from the examining division
11.05.2009Despatch of a communication from the examining division (Time limit: M01)
12.05.2009Reply to a communication from the examining division
15.05.2009Cancellation of oral proceeding that was planned for 04.06.2009
15.05.2009Minutes of oral proceedings despatched
04.06.2009Date of oral proceedings
04.06.2009Date of oral proceedings (cancelled)
03.07.2009Communication of intention to grant the patent
23.12.2009Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
08.02.2010Fee for grant paid
08.02.2010Fee for publishing/printing paid
Opposition(s)28.12.2010No opposition filed within time limit [2011/09]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
08.02.2010Request for further processing filed
08.02.2010Full payment received (date of receipt of payment)
Fees paidRenewal fee
06.10.2006Renewal fee patent year 03
12.10.2007Renewal fee patent year 04
09.10.2008Renewal fee patent year 05
08.02.2010Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
31.10.200906   M06   Fee paid on   08.02.2010
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCY24.03.2010
CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
HU25.09.2010
GB28.10.2010
IE28.10.2010
LU28.10.2010
CH31.10.2010
LI31.10.2010
MC31.10.2010
[2012/44]
Former [2012/42]CY24.03.2010
CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
HU25.09.2010
GB28.10.2010
IE28.10.2010
CH31.10.2010
LI31.10.2010
MC31.10.2010
Former [2012/37]CY24.03.2010
CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
GB28.10.2010
IE28.10.2010
CH31.10.2010
LI31.10.2010
MC31.10.2010
Former [2011/47]CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
GB28.10.2010
IE28.10.2010
CH31.10.2010
LI31.10.2010
MC31.10.2010
Former [2011/43]CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
GB28.10.2010
CH31.10.2010
LI31.10.2010
MC31.10.2010
Former [2011/38]CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
CH31.10.2010
LI31.10.2010
MC31.10.2010
Former [2011/24]CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
MC31.10.2010
Former [2011/08]CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
PT26.07.2010
Former [2011/07]CZ24.03.2010
DK24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
Former [2010/51]CZ24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
BG24.06.2010
GR25.06.2010
Former [2010/50]CZ24.03.2010
EE24.03.2010
FI24.03.2010
PL24.03.2010
RO24.03.2010
SE24.03.2010
SI24.03.2010
SK24.03.2010
GR25.06.2010
Former [2010/38]FI24.03.2010
PL24.03.2010
SI24.03.2010
Former [2010/36]PL24.03.2010
SI24.03.2010
Documents cited:Search[A]US4698897  (FROMMANN KLAUS [DE], et al) [A] 1-9 * figures 1-4; claims 1-14 *;
 [A]EP0321733  (KRUPP GMBH [DE]) [A] 1-9 * figures 1-3; claims 1-10 *;
 [Y]WO9429042  (ARVEDI GIOVANNI [IT], et al) [Y] 1-9 * page 3, line 1 - line 30 * * page 4, line 6 - line 25 * * page 6, line 1 - page 7, line 29 * * page 8, line 3 - line 5 * * page 10, line 6 - page 11, line 31 * * figures 1,2; claims 1-4 *;
 [A]WO9746332  (HOOGOVENS STAAL BV [NL], et al) [A] 1-9 * page 3, line 13 - line 23 * * page 21, line 7 - line 35 * * figure 1; claims 1,4,7,917,22,32,36 *;
 [A]US6053996  (PRONK CORNELIS [NL], et al) [A] 1-9* figures 1,2; claims 1-7 *;
 [DY]WO0059650  (ARVEDI GIOVANNI [IT]) [DY] 1-9 * page 4, line 3 - line 17 * * page 5, line 26 - page 6, line 5 * * figures 1,1.a,1.b; claims 1-7,9,18,20 *
by applicantEP1196256
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.