blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1582042

EP1582042 - PILOT TRANSMISSION SCHEMES FOR WIRELESS MULTI-CARRIER COMMUNICATION SYSTEMS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.07.2012
Database last updated on 24.08.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Qualcomm, Incorporated
5775 Morehouse Drive
San Diego, CA 92121 / US
[2005/40]
Inventor(s)01 / SMEE, John E. c/o QUALCOMM, INCORPORATED
5775 Morehouse Drive
San Diego, CA 92121 / US
02 / WALTON, Jay, Rodney, c/o QUALCOMM, INCORPORATED
5775 Morehouse Drive
San Diego, CA 92121 / US
03 / MALLADI, Durga, Prasad
11983 Briarleaf Way
San Diego, CA 92128 / US
 [2011/38]
Former [2007/03]01 / SMEE, John E. c/o QUALCOMM, INCORPORATED
5775 Morehouse Drive
San Diego, CA 92121 / US
02 / WALTON, Jay, Rodney
7 Ledgewood Drive
Westford, MA 01886 / US
03 / MALLADI, Durga, Prasad
11983 Briarleaf Way
San Diego, CA 92128 / US
Former [2005/40]01 / SMEE, John E.
5220 Fiore Terrace, Apt. M212
San Diego, CA 92122 / US
02 / WALTON, Jay, Rodney
7 Ledgewood Drive
Westford, MA 01886 / US
03 / MALLADI, Durga, Prasad
11983 Briarleaf Way
San Diego, CA 92128 / US
Representative(s)Emde, Eric
Wagner & Geyer Partnerschaft mbB
Patent- und Rechtsanwälte
Gewürzmühlstrasse 5
80538 München / DE
[N/P]
Former [2011/38]Emde, Eric
Wagner & Geyer Gewürzmühlstrasse 5
80538 München / DE
Former [2005/40]Emde, Eric
Wagner & Geyer, Gewürzmühlstrasse 5
80538 München / DE
Application number, filing date04700634.107.01.2004
[2005/40]
WO2004US00326
Priority number, dateUS20030438601P07.01.2003         Original published format: US 438601 P
US2003035981107.02.2003         Original published format: US 359811
[2005/40]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2004064295
Date:29.07.2004
Language:EN
[2004/31]
Type: A2 Application without search report 
No.:EP1582042
Date:05.10.2005
Language:EN
The application published by WIPO in one of the EPO official languages on 29.07.2004 takes the place of the publication of the European patent application.
[2005/40]
Type: B1 Patent specification 
No.:EP1582042
Date:21.09.2011
Language:EN
[2011/38]
Search report(s)International search report - published on:EP23.12.2004
ClassificationIPC:H04L27/26
[2005/40]
CPC:
H04L5/0039 (EP,US); H04B7/0669 (EP,US); H04B7/0854 (EP,US);
H04L1/0017 (EP,US); H04L1/0071 (EP,US); H04L1/0618 (EP,US);
H04L25/03343 (EP,US); H04L27/26035 (EP,US); H04L27/261 (EP,US);
H04L5/0048 (EP,US); H04L25/0226 (EP,US); H04L25/03866 (EP,US);
H04L5/0023 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PT,   RO,   SE,   SI,   SK,   TR [2005/40]
TitleGerman:PILOTSIGNAL ÜBERTRAGUNGSTECHNIK FÜR DRAHTLOSE MEHRTRÄGERSYSTEME[2005/40]
English:PILOT TRANSMISSION SCHEMES FOR WIRELESS MULTI-CARRIER COMMUNICATION SYSTEMS[2005/40]
French:SCHEMA DE TRANSMISSION DE PILOTES POUR SYSTEMES DE TELECOMMUNICATIONS SANS FIL A PORTEUSES MULTIPLES[2005/40]
Entry into regional phase04.07.2005National basic fee paid 
04.07.2005Designation fee(s) paid 
04.07.2005Examination fee paid 
Examination procedure30.07.2004Request for preliminary examination filed
International Preliminary Examining Authority: US
04.07.2005Examination requested  [2005/40]
13.03.2006Despatch of a communication from the examining division (Time limit: M06)
20.09.2006Reply to a communication from the examining division
01.03.2007Despatch of a communication from the examining division (Time limit: M06)
11.09.2007Reply to a communication from the examining division
18.11.2008Despatch of a communication from the examining division (Time limit: M06)
28.05.2009Reply to a communication from the examining division
31.01.2011Cancellation of oral proceeding that was planned for 09.02.2011
09.02.2011Date of oral proceedings (cancelled)
14.02.2011Communication of intention to grant the patent
14.06.2011Fee for grant paid
14.06.2011Fee for publishing/printing paid
Divisional application(s)EP10012069.0  / EP2282438
EP10012070.8  / EP2282436
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  13.03.2006
Opposition(s)22.06.2012No opposition filed within time limit [2012/35]
Fees paidRenewal fee
09.01.2006Renewal fee patent year 03
05.01.2007Renewal fee patent year 04
08.01.2008Renewal fee patent year 05
07.01.2009Renewal fee patent year 06
07.01.2010Renewal fee patent year 07
06.01.2011Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.01.2004
AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
TR21.09.2011
BG21.12.2011
GR22.12.2011
ES01.01.2012
IE07.01.2012
LU07.01.2012
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
[2014/34]
Former [2014/27]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
TR21.09.2011
BG21.12.2011
GR22.12.2011
ES01.01.2012
IE07.01.2012
LU07.01.2012
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
Former [2014/21]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
TR21.09.2011
BG21.12.2011
GR22.12.2011
ES01.01.2012
IE07.01.2012
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
Former [2013/29]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
BG21.12.2011
GR22.12.2011
ES01.01.2012
IE07.01.2012
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
Former [2013/22]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
ES01.01.2012
IE07.01.2012
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
Former [2013/08]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
IE07.01.2012
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
Former [2013/04]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
PT23.01.2012
CH31.01.2012
FR31.01.2012
LI31.01.2012
MC31.01.2012
Former [2012/49]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
PT23.01.2012
CH31.01.2012
LI31.01.2012
MC31.01.2012
Former [2012/37]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
PT23.01.2012
MC31.01.2012
Former [2012/35]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
DK21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
PT23.01.2012
Former [2012/23]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
EE21.09.2011
FI21.09.2011
IT21.09.2011
NL21.09.2011
RO21.09.2011
SE21.09.2011
SI21.09.2011
SK21.09.2011
GR22.12.2011
PT23.01.2012
Former [2012/21]AT21.09.2011
BE21.09.2011
CY21.09.2011
CZ21.09.2011
FI21.09.2011
SE21.09.2011
SI21.09.2011
GR22.12.2011
Former [2012/18]AT21.09.2011
BE21.09.2011
CY21.09.2011
FI21.09.2011
SE21.09.2011
SI21.09.2011
GR22.12.2011
Former [2012/12]AT21.09.2011
CY21.09.2011
FI21.09.2011
SE21.09.2011
SI21.09.2011
GR22.12.2011
Former [2012/11]AT21.09.2011
FI21.09.2011
SE21.09.2011
SI21.09.2011
GR22.12.2011
Former [2012/10]FI21.09.2011
SE21.09.2011
GR22.12.2011
Former [2012/09]FI21.09.2011
Cited inInternational search[IAY]WO0176110  (QUALCOMM INC [US]) [I] 1,2,4,5,7-9,11-16,19,20,22-26,32,34-41,43-48,50-53 * abstract * * page 3, line 25 - page 4, line 3 * * page 26, line 10 - line 23 * * page 27, line 18 - page 28, line 5 * * claims 1,2,9 * [A] 6,17,18,21,28-31,33,54-63 [Y] 3,10,27,42,49;
 [Y]US2002044591  (LEE HYUN-WOO [KR], et al) [Y] 3,10,27,42,49 * abstract * * paragraph [0011] *;
 [A]WO02069523  (MAGNOLIA BROADBAND INC [US]) [A] 1-63 * abstract * * claim 1 *;
 [PX]WO03034646  (NORTEL NETWORKS LTD [CA]) [PX] 1,8,11-13,19,22-24,41,43-45,51-53 * abstract * * page 11, line 22 - line 30 ** claims 18-23 *
by applicantWO0176110
 US2002044591
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.