blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1633496

EP1633496 - LOCAL REPAIR OF COATED SUBSTRATES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.09.2008
Database last updated on 19.10.2024
Most recent event   Tooltip20.08.2010Lapse of the patent in a contracting state
New state(s): TR
published on 22.09.2010  [2010/38]
Applicant(s)For all designated states
Akzo Nobel Coatings International BV
Velperweg 76
6824 BM Arnhem / NL
[2006/11]
Inventor(s)01 / DELLRUP, Claes, Magnus
Skallavångsvägen 84
S-247 33 Södra Sandby / SE
02 / KJELLQVIST-LINDELL, Ann, Kerstin, Birgitta
Linneg 131
S-216 18 Malmö / SE
 [2006/11]
Representative(s)Schalkwijk, Pieter Cornelis, et al
Akzo Nobel N.V.
Intellectual Property Department
P.O. Box 9300
6800 SB Arnhem / NL
[N/P]
Former [2008/28]Schalkwijk, Pieter Cornelis, et al
AKZO NOBEL N.V. Intellectual Property Department PO Box 9300
6800 SB Arnhem / NL
Former [2006/11]Schalkwijk, Pieter Cornelis, et al
Akzo Nobel N.V. Intellectual Property Department P.O. Box 9300
6800 SB Arnhem / NL
Application number, filing date04739890.414.06.2004
[2006/11]
WO2004EP06418
Priority number, dateEP2003007690418.06.2003         Original published format: EP 03076904
US20030519860P14.11.2003         Original published format: US 519860 P
[2006/11]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2005000484
Date:06.01.2005
Language:EN
[2005/01]
Type: A1 Application with search report 
No.:EP1633496
Date:15.03.2006
Language:EN
The application published by WIPO in one of the EPO official languages on 06.01.2005 takes the place of the publication of the European patent application.
[2006/11]
Type: B1 Patent specification 
No.:EP1633496
Date:07.11.2007
Language:EN
[2007/45]
Search report(s)International search report - published on:EP06.01.2005
ClassificationIPC:B05D5/00, B05D5/06, B05D3/06
[2006/11]
CPC:
B05D3/067 (EP); B05D1/42 (EP); B05D5/005 (EP);
B05D7/06 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/11]
Extension statesALNot yet paid
HRNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
TitleGerman:ÖRTLICHE REPARATUR VON BESCHICHTETEN SUBSTRATEN[2006/11]
English:LOCAL REPAIR OF COATED SUBSTRATES[2006/11]
French:REPARATION LOCALISEE DE SUBSTRATS REVETUS[2006/11]
Entry into regional phase01.12.2005National basic fee paid 
01.12.2005Designation fee(s) paid 
01.12.2005Examination fee paid 
Examination procedure14.01.2005Request for preliminary examination filed
International Preliminary Examining Authority: EP
01.12.2005Examination requested  [2006/11]
01.03.2006Despatch of a communication from the examining division (Time limit: M06)
26.08.2006Reply to a communication from the examining division
23.02.2007Cancellation of oral proceeding that was planned for 06.03.2007
23.02.2007Minutes of oral proceedings despatched
06.03.2007Date of oral proceedings (cancelled)
01.06.2007Communication of intention to grant the patent
19.09.2007Fee for grant paid
19.09.2007Fee for publishing/printing paid
Opposition(s)08.08.2008No opposition filed within time limit [2008/42]
Fees paidRenewal fee
28.06.2006Renewal fee patent year 03
27.06.2007Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT07.11.2007
BE07.11.2007
CH07.11.2007
CY07.11.2007
CZ07.11.2007
DK07.11.2007
EE07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
TR07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
HU08.05.2008
LU14.06.2008
IE16.06.2008
MC30.06.2008
[2010/38]
Former [2010/34]AT07.11.2007
BE07.11.2007
CH07.11.2007
CY07.11.2007
CZ07.11.2007
DK07.11.2007
EE07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
HU08.05.2008
LU14.06.2008
IE16.06.2008
MC30.06.2008
Former [2010/33]AT07.11.2007
BE07.11.2007
CH07.11.2007
CY07.11.2007
CZ07.11.2007
DK07.11.2007
EE07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
LU14.06.2008
IE16.06.2008
MC30.06.2008
Former [2009/35]AT07.11.2007
BE07.11.2007
CH07.11.2007
CY07.11.2007
CZ07.11.2007
DK07.11.2007
EE07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
IE16.06.2008
MC30.06.2008
Former [2009/23]AT07.11.2007
BE07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
EE07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
IE16.06.2008
MC30.06.2008
Former [2009/22]AT07.11.2007
BE07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
EE07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
MC30.06.2008
Former [2009/13]AT07.11.2007
BE07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
FI07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
GR08.02.2008
ES18.02.2008
PT07.04.2008
MC30.06.2008
Former [2009/07]AT07.11.2007
BE07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
ES18.02.2008
PT07.04.2008
MC30.06.2008
Former [2008/42]AT07.11.2007
BE07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
ES18.02.2008
PT07.04.2008
Former [2008/39]AT07.11.2007
BE07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
LI07.11.2007
NL07.11.2007
RO07.11.2007
SI07.11.2007
SK07.11.2007
BG07.02.2008
ES18.02.2008
Former [2008/35]AT07.11.2007
CH07.11.2007
CZ07.11.2007
DK07.11.2007
LI07.11.2007
NL07.11.2007
SI07.11.2007
BG07.02.2008
ES18.02.2008
Former [2008/29]AT07.11.2007
CH07.11.2007
LI07.11.2007
NL07.11.2007
SI07.11.2007
BG07.02.2008
ES18.02.2008
Former [2008/26]CH07.11.2007
LI07.11.2007
NL07.11.2007
SI07.11.2007
BG07.02.2008
ES18.02.2008
Former [2008/24]CH07.11.2007
LI07.11.2007
NL07.11.2007
BG07.02.2008
ES18.02.2008
Cited inInternational search[A]WO8001472  (SICPA HOLDING SA [CH], et al) [A] 9 * figure 1 *;
 [XD]DE4222306  (MERCEDES-BENZ AG) [XD] 1,5,8 * column 1, lines 41-49; claims 4,5 * * column 2, lines 1-38 *;
 [A]US5399373  (MROZINSKI JOHN B [US]) [A] 2-4* column 4, lines 5-40; figure 1 *;
 [XD]US6020023  (KELLER ANJA [DE], et al) [XD] 1 * column 2, lines 22-59; figure 4 * * column 3, lines 3-15 * * column 4, lines 57-60 *;
 [X]US2003026895  (FLOSBACH CARMEN [DE], et al) [X] 1,5-8,10,11 * paragraphs [0039] - [0046] - [0050] , [0054] - [0071]; claim 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.