blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1647163

EP1647163 - AN ELECTRIC HEATING ELEMENT THAT INCLUDES A RADIANT TUBE. [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2010
Database last updated on 25.09.2024
Most recent event   Tooltip07.10.2011Lapse of the patent in a contracting state
New state(s): CY, TR
published on 09.11.2011  [2011/45]
Applicant(s)For all designated states
Sandvik Intellectual Property AB
811 81 Sandviken / SE
[N/P]
Former [2006/16]For all designated states
Sandvik Intellectual Property AB
811 81 Sandviken / SE
Inventor(s)01 / LEWIN, Thomas
Bergslagsvägen 227 B
S-734 40 Hallstahammar / SE
 [2006/16]
Application number, filing date04749086.729.06.2004
[2006/16]
WO2004SE01048
Priority number, dateSE2003000204710.07.2003         Original published format: SE 0302047
[2006/16]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2005006812
Date:20.01.2005
Language:EN
[2005/03]
Type: A1 Application with search report 
No.:EP1647163
Date:19.04.2006
Language:EN
The application published by WIPO in one of the EPO official languages on 20.01.2005 takes the place of the publication of the European patent application.
[2006/16]
Type: B1 Patent specification 
No.:EP1647163
Date:13.05.2009
Language:EN
[2009/20]
Search report(s)International search report - published on:SE20.01.2005
ClassificationIPC:H05B3/64
[2006/16]
CPC:
H05B3/64 (EP,KR,US); H05B3/44 (EP,US); H05B2203/032 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/16]
Extension statesALNot yet paid
HRNot yet paid
LTNot yet paid
LVNot yet paid
MKNot yet paid
TitleGerman:ELEKTRISCHES HEIZELEMENT MIT EINEM STRAHLUNGSROHR[2008/49]
English:AN ELECTRIC HEATING ELEMENT THAT INCLUDES A RADIANT TUBE.[2006/16]
French:ELEMENT DE CHAUFFAGE ELECTRIQUE COMPRENANT UN TUBE RADIANT[2006/16]
Former [2006/16]ELEKTRISCHES HEIZELEMENT MIT EINER STRAHLENDEN RÖHRE
Entry into regional phase10.02.2006National basic fee paid 
10.02.2006Designation fee(s) paid 
10.02.2006Examination fee paid 
Examination procedure10.02.2006Examination requested  [2006/16]
19.06.2007Despatch of a communication from the examining division (Time limit: M06)
18.12.2007Reply to a communication from the examining division
22.12.2008Communication of intention to grant the patent
30.03.2009Fee for grant paid
30.03.2009Fee for publishing/printing paid
Opposition(s)16.02.2010No opposition filed within time limit [2010/16]
Fees paidRenewal fee
30.06.2006Renewal fee patent year 03
02.07.2007Renewal fee patent year 04
28.03.2008Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT13.05.2009
BE13.05.2009
CY13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
TR13.05.2009
IE29.06.2009
LU29.06.2009
CH30.06.2009
LI30.06.2009
MC30.06.2009
BG13.08.2009
SE13.08.2009
GR14.08.2009
PT13.09.2009
HU14.11.2009
[2011/44]
Former [2011/32]AT13.05.2009
BE13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
IE29.06.2009
LU29.06.2009
CH30.06.2009
LI30.06.2009
MC30.06.2009
BG13.08.2009
SE13.08.2009
GR14.08.2009
PT13.09.2009
HU14.11.2009
Former [2011/21]AT13.05.2009
BE13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
IE29.06.2009
LU29.06.2009
CH30.06.2009
LI30.06.2009
MC30.06.2009
BG13.08.2009
SE13.08.2009
GR14.08.2009
PT13.09.2009
Former [2010/50]AT13.05.2009
BE13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
IE29.06.2009
CH30.06.2009
LI30.06.2009
MC30.06.2009
BG13.08.2009
SE13.08.2009
GR14.08.2009
PT13.09.2009
Former [2010/21]AT13.05.2009
BE13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
IE29.06.2009
CH30.06.2009
LI30.06.2009
MC30.06.2009
BG13.08.2009
SE13.08.2009
PT13.09.2009
Former [2010/18]AT13.05.2009
BE13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
MC30.06.2009
BG13.08.2009
SE13.08.2009
PT13.09.2009
Former [2010/10]AT13.05.2009
BE13.05.2009
CZ13.05.2009
DK13.05.2009
EE13.05.2009
FI13.05.2009
PL13.05.2009
RO13.05.2009
SI13.05.2009
SK13.05.2009
MC30.06.2009
SE13.08.2009
PT13.09.2009
Former [2010/07]AT13.05.2009
FI13.05.2009
PL13.05.2009
SI13.05.2009
MC30.06.2009
SE13.08.2009
PT13.09.2009
Former [2010/01]AT13.05.2009
FI13.05.2009
PL13.05.2009
SI13.05.2009
SE13.08.2009
PT13.09.2009
Former [2009/51]AT13.05.2009
FI13.05.2009
SI13.05.2009
SE13.08.2009
PT13.09.2009
Cited inInternational search[A]US2372212  (GERHARD LEWIN);
 [A]US4179603  (BELL DAVID V [US], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.