blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1733400

EP1733400 - METHOD FOR MANUFACTURING A PRESSURE VESSEL OF A PRESSURIZED-WATER REACTOR OF A NUCLEAR POWER STATION A PRESSURE VESSEL OF A PRESSURIZED-WATER REACTOR OF A NUCLEAR POWER STATION AND USE OF A MULTIWALLED PRESSURE VESSEL FOR THE ABOVE PURPOSE [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.11.2010
Database last updated on 03.10.2024
Most recent event   Tooltip19.11.2010Application deemed to be withdrawnpublished on 22.12.2010  [2010/51]
Applicant(s)For all designated states
LUOMALA, Sulo
Maunulantie 19 B 37
00630 Helsinki / FI
For all designated states
PITKÄNEN, Ilkka
Mikkeläntie 7 B
02770 Espoo / FI
[2006/51]
Inventor(s)01 / see applicant
...
 [2006/51]
Representative(s)Laitinen, Pauli Sakari
Patentti-Laitinen Oy
P.O. Box 29
02771 Espoo / FI
[N/P]
Former [2006/51]Laitinen, Pauli Sakari
Patentti-Laitinen Oy, P.O. Box 29
02771 Espoo / FI
Application number, filing date04805206.231.12.2004
[2006/51]
WO2004FI00811
Priority number, dateFI2004000038711.03.2004         Original published format: FI 20040387
[2006/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2005088648
Date:22.09.2005
Language:EN
[2005/38]
Type: A1 Application with search report 
No.:EP1733400
Date:20.12.2006
Language:EN
The application published by WIPO in one of the EPO official languages on 22.09.2005 takes the place of the publication of the European patent application.
[2006/51]
Search report(s)International search report - published on:SE22.09.2005
ClassificationIPC:G21C9/00, G21C3/00, B01J3/04
[2006/51]
CPC:
G21C13/02 (EP,US); G21C9/00 (KR); B01J3/04 (KR);
B01J3/046 (EP,US); G21C3/00 (KR); Y02E30/30 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/51]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
LVNot yet paid
MKNot yet paid
YUNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES DRUCKBEHÄLTERS EINES DRUCKWASSERREAKTORS EINES KERNKRAFTWERKES, EIN DRUCKBEHÄLTER EINES DRUCKWASSERREAKTORS EINES KERNKRAFTWERKES UND GEBRAUCH EINES MEHRWANDIGEN DRUCKBEHÄLTERS ZUM O.G. ZWECK[2006/51]
English:METHOD FOR MANUFACTURING A PRESSURE VESSEL OF A PRESSURIZED-WATER REACTOR OF A NUCLEAR POWER STATION A PRESSURE VESSEL OF A PRESSURIZED-WATER REACTOR OF A NUCLEAR POWER STATION AND USE OF A MULTIWALLED PRESSURE VESSEL FOR THE ABOVE PURPOSE[2006/51]
French:PROCEDE DE FABRICATION D'UNE CUVE SOUS PRESSION POUR REACTEUR A EAU PRESSURISEE DE CENTRALE NUCLEAIRE, CUVE SOUS PRESSION ASSOCIEE ET UTILISATION ASSOCIEE D'UNE CUVE SOUS PRESSION MULTIPAROIS[2006/51]
Entry into regional phase09.10.2006National basic fee paid 
09.10.2006Designation fee(s) paid 
09.10.2006Examination fee paid 
Examination procedure10.01.2006Request for preliminary examination filed
International Preliminary Examining Authority: SE
09.10.2006Examination requested  [2006/51]
30.05.2007Despatch of a communication from the examining division (Time limit: M04)
16.01.2008Reply to a communication from the examining division
31.10.2008Despatch of a communication from the examining division (Time limit: M04)
11.06.2009Reply to a communication from the examining division
01.07.2010Application deemed to be withdrawn, date of legal effect  [2010/51]
04.08.2010Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2010/51]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
18.01.2008Request for further processing filed
18.01.2008Full payment received (date of receipt of payment)
Request granted
05.02.2008Decision despatched
Fees paidRenewal fee
29.06.2007Renewal fee patent year 03
16.05.2008Renewal fee patent year 04
11.06.2009Renewal fee patent year 05
Penalty fee
Additional fee for renewal fee
31.12.200603   M06   Fee paid on   29.06.2007
31.12.200704   M06   Fee paid on   16.05.2008
31.12.200805   M06   Fee paid on   11.06.2009
31.12.200906   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]EP0075072  (GORGENS ERICH);
 [X]US4076585  (CACHERA PIERRE CHARLES);
 [X]US4666661  (FREDELL JAN [SE], et al);
 [A]US3647103  (BERMAN IRWIN);
 [A]FR1218206  (BLACKBURN & GENERAL AIRCRAFT L);
 [Y]US3469624  (KOPPE ROLF);
 [A]US3282459  (WILSON CHARLES D);
 [X]US4678626  (GERMER JOHN H [US])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.