EP1691969 - METHOD OF TRANSFERRING LARGE UNCURED COMPOSITE LAMINATES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.11.2018 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 08.12.2017 | ||
Former | Grant of patent is intended Status updated on 08.08.2017 | Most recent event Tooltip | 19.06.2020 | Lapse of the patent in a contracting state New state(s): HU | published on 22.07.2020 [2020/30] | Applicant(s) | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-1596 / US | [2018/02] |
Former [2006/34] | For all designated states The Boeing Company 100 North Riverside Chicago, IL 60606-1596 / US | Inventor(s) | 01 /
ANDERSON, Donald, A. 6044 114th Place S.E. Bellevue, WA 98006 / US | 02 /
JOHNSON, Brice, A. 2812 SW 340th Place Federal Way, WA 98032 / US | 03 /
SPOON, Stephen, S. 11820 261st Avenue Court E. Buckley, WA 98321 / US | [2006/34] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2018/02] |
Former [2006/34] | Wegener, Markus, et al Witte, Weller & Partner, Patentanwälte, Postfach 10 54 62 70047 Stuttgart / DE | Application number, filing date | 04810121.6 | 29.10.2004 | [2006/34] | WO2004US36044 | Priority number, date | US20030717030 | 18.11.2003 Original published format: US 717030 | [2006/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2005049304 | Date: | 02.06.2005 | Language: | EN | [2005/22] | Type: | A1 Application with search report | No.: | EP1691969 | Date: | 23.08.2006 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.06.2005 takes the place of the publication of the European patent application. | [2006/34] | Type: | B1 Patent specification | No.: | EP1691969 | Date: | 10.01.2018 | Language: | EN | [2018/02] | Search report(s) | International search report - published on: | EP | 02.06.2005 | Classification | IPC: | B29C70/54, B29C37/00, B29C70/30, B29C53/60, B29C53/68, B29C69/00, B29C33/68, B29C70/44 | [2017/27] | CPC: |
B29C70/543 (EP,US);
B29C33/68 (EP,US);
B29C70/30 (EP,US);
B29C70/446 (EP,US);
B29C37/0003 (EP,US);
B29C53/60 (EP,US);
B29C53/68 (EP,US);
Y02T50/40 (EP,US);
Y10T29/49867 (EP,US);
|
Former IPC [2006/34] | B29C69/00, B29C33/68, B29C70/44, // B29C37/00, B29C53/60, B29C53/68 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2018/02] |
Former [2006/34] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUR ÜBERTRAGUNG VON GROSSEN UNGEHÄRTETEN VERBUNDLAMINATEN | [2006/34] | English: | METHOD OF TRANSFERRING LARGE UNCURED COMPOSITE LAMINATES | [2006/34] | French: | PROCEDE DE TRANSFERT DE STRATIFIES COMPOSITES NON VULCANISES DE GRANDE TAILLE | [2006/34] | Entry into regional phase | 11.05.2006 | National basic fee paid | 11.05.2006 | Designation fee(s) paid | 11.05.2006 | Examination fee paid | Examination procedure | 11.05.2006 | Examination requested [2006/34] | 20.09.2006 | Amendment by applicant (claims and/or description) | 16.09.2010 | Despatch of a communication from the examining division (Time limit: M06) | 25.03.2011 | Reply to a communication from the examining division | 27.11.2014 | Despatch of a communication from the examining division (Time limit: M04) | 26.03.2015 | Reply to a communication from the examining division | 09.08.2017 | Communication of intention to grant the patent | 28.11.2017 | Fee for grant paid | 28.11.2017 | Fee for publishing/printing paid | 28.11.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.09.2010 | Opposition(s) | 11.10.2018 | No opposition filed within time limit [2018/51] | Fees paid | Renewal fee | 27.10.2006 | Renewal fee patent year 03 | 29.10.2007 | Renewal fee patent year 04 | 27.10.2008 | Renewal fee patent year 05 | 26.10.2009 | Renewal fee patent year 06 | 29.09.2010 | Renewal fee patent year 07 | 25.10.2011 | Renewal fee patent year 08 | 25.10.2012 | Renewal fee patent year 09 | 28.10.2013 | Renewal fee patent year 10 | 27.10.2014 | Renewal fee patent year 11 | 27.10.2015 | Renewal fee patent year 12 | 27.10.2016 | Renewal fee patent year 13 | 27.10.2017 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.10.2004 | AT | 10.01.2018 | CY | 10.01.2018 | CZ | 10.01.2018 | DK | 10.01.2018 | EE | 10.01.2018 | ES | 10.01.2018 | FI | 10.01.2018 | IT | 10.01.2018 | MC | 10.01.2018 | NL | 10.01.2018 | PL | 10.01.2018 | PT | 10.01.2018 | RO | 10.01.2018 | SE | 10.01.2018 | SI | 10.01.2018 | SK | 10.01.2018 | TR | 10.01.2018 | BG | 10.04.2018 | GR | 11.04.2018 | [2020/30] |
Former [2020/27] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
CZ | 10.01.2018 | ||
DK | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
MC | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
PT | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
SI | 10.01.2018 | ||
SK | 10.01.2018 | ||
TR | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2020/16] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
CZ | 10.01.2018 | ||
DK | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
MC | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
SI | 10.01.2018 | ||
SK | 10.01.2018 | ||
TR | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2019/28] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
CZ | 10.01.2018 | ||
DK | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
MC | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
SI | 10.01.2018 | ||
SK | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2019/13] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
CZ | 10.01.2018 | ||
DK | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
SI | 10.01.2018 | ||
SK | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2018/51] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
CZ | 10.01.2018 | ||
DK | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
SK | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2018/50] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
CZ | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
SK | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2018/49] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
EE | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
RO | 10.01.2018 | ||
SE | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2018/47] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
IT | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
SE | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2018/40] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
SE | 10.01.2018 | ||
BG | 10.04.2018 | ||
GR | 11.04.2018 | ||
Former [2018/39] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
SE | 10.01.2018 | ||
GR | 11.04.2018 | ||
Former [2018/38] | AT | 10.01.2018 | |
CY | 10.01.2018 | ||
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
GR | 11.04.2018 | ||
Former [2018/37] | CY | 10.01.2018 | |
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
GR | 11.04.2018 | ||
Former [2018/36] | CY | 10.01.2018 | |
ES | 10.01.2018 | ||
FI | 10.01.2018 | ||
NL | 10.01.2018 | ||
PL | 10.01.2018 | ||
Former [2018/34] | FI | 10.01.2018 | |
NL | 10.01.2018 | Cited in | International search | [A]US3713753 (BRUNSCH K) [A] 1-10 * column 5, line 33 - column 6, line 17; figures 1-3 *; | [A]US4066249 (HUBER JOHN G, et al) [A] 1-10 * column 1, line 41 - column 2, line 24; figures 1,2 *; | [A]US4200271 (AUGUST ARTHUR [US], et al) [A] 1-10 * column 2, line 29 - line 37; figure 1 * * column 2, line 54 - line 61 * * column 3, line 1 - line 22; figure 6 * * column 4, line 23 - line 31; compounds 17-20 *; | [A]FR2597395 (MAN TECHNOLOGIE GMBH [BE]) [A] 1-10 * page 3, line 16 - page 4, line 5; figure 1 * * page 4, line 10 - line 35; figure 3 *; | [A]US5204033 (PEARCE ROBERT G [US], et al) [A] 1-10 * column 6, line 55 - column 7, line 10; figures 6,7 *; | [A]GB2310822 (EURO PROJECTS LTD [GB], et al) [A] 1-10 * page 10, line 8 - page 11, line 19; figure 1 *; | [A]WO0018555 (AIRTECH INT INC [US], et al) [A] 1-10 * page 5, line 26 - page 6, line 17; figure 1 ** page 7, line 30 - page 8, line 18 *; | [A]US6102241 (PALAZZO DAVID T [US]) [A] 1-10 * column 4, line 38 - line 44; figures 1,12 * |