blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1691969

EP1691969 - METHOD OF TRANSFERRING LARGE UNCURED COMPOSITE LAMINATES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.11.2018
Database last updated on 30.10.2024
FormerThe patent has been granted
Status updated on  08.12.2017
FormerGrant of patent is intended
Status updated on  08.08.2017
Most recent event   Tooltip19.06.2020Lapse of the patent in a contracting state
New state(s): HU
published on 22.07.2020  [2020/30]
Applicant(s)For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-1596 / US
[2018/02]
Former [2006/34]For all designated states
The Boeing Company
100 North Riverside
Chicago, IL 60606-1596 / US
Inventor(s)01 / ANDERSON, Donald, A.
6044 114th Place S.E.
Bellevue, WA 98006 / US
02 / JOHNSON, Brice, A.
2812 SW 340th Place
Federal Way, WA 98032 / US
03 / SPOON, Stephen, S.
11820 261st Avenue Court E.
Buckley, WA 98321 / US
 [2006/34]
Representative(s)Witte, Weller & Partner Patentanwälte mbB
Postfach 10 54 62
70047 Stuttgart / DE
[2018/02]
Former [2006/34]Wegener, Markus, et al
Witte, Weller & Partner, Patentanwälte, Postfach 10 54 62
70047 Stuttgart / DE
Application number, filing date04810121.629.10.2004
[2006/34]
WO2004US36044
Priority number, dateUS2003071703018.11.2003         Original published format: US 717030
[2006/34]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2005049304
Date:02.06.2005
Language:EN
[2005/22]
Type: A1 Application with search report 
No.:EP1691969
Date:23.08.2006
Language:EN
The application published by WIPO in one of the EPO official languages on 02.06.2005 takes the place of the publication of the European patent application.
[2006/34]
Type: B1 Patent specification 
No.:EP1691969
Date:10.01.2018
Language:EN
[2018/02]
Search report(s)International search report - published on:EP02.06.2005
ClassificationIPC:B29C70/54, B29C37/00, B29C70/30, B29C53/60, B29C53/68, B29C69/00, B29C33/68, B29C70/44
[2017/27]
CPC:
B29C70/543 (EP,US); B29C33/68 (EP,US); B29C70/30 (EP,US);
B29C70/446 (EP,US); B29C37/0003 (EP,US); B29C53/60 (EP,US);
B29C53/68 (EP,US); Y02T50/40 (EP,US); Y10T29/49867 (EP,US);
Y10T29/49879 (EP,US); Y10T29/49895 (EP,US); Y10T29/49998 (EP,US) (-)
Former IPC [2006/34]B29C69/00, B29C33/68, B29C70/44, // B29C37/00, B29C53/60, B29C53/68
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IT,   LI,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2018/02]
Former [2006/34]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IT,  LI,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:VERFAHREN ZUR ÜBERTRAGUNG VON GROSSEN UNGEHÄRTETEN VERBUNDLAMINATEN[2006/34]
English:METHOD OF TRANSFERRING LARGE UNCURED COMPOSITE LAMINATES[2006/34]
French:PROCEDE DE TRANSFERT DE STRATIFIES COMPOSITES NON VULCANISES DE GRANDE TAILLE[2006/34]
Entry into regional phase11.05.2006National basic fee paid 
11.05.2006Designation fee(s) paid 
11.05.2006Examination fee paid 
Examination procedure11.05.2006Examination requested  [2006/34]
20.09.2006Amendment by applicant (claims and/or description)
16.09.2010Despatch of a communication from the examining division (Time limit: M06)
25.03.2011Reply to a communication from the examining division
27.11.2014Despatch of a communication from the examining division (Time limit: M04)
26.03.2015Reply to a communication from the examining division
09.08.2017Communication of intention to grant the patent
28.11.2017Fee for grant paid
28.11.2017Fee for publishing/printing paid
28.11.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  16.09.2010
Opposition(s)11.10.2018No opposition filed within time limit [2018/51]
Fees paidRenewal fee
27.10.2006Renewal fee patent year 03
29.10.2007Renewal fee patent year 04
27.10.2008Renewal fee patent year 05
26.10.2009Renewal fee patent year 06
29.09.2010Renewal fee patent year 07
25.10.2011Renewal fee patent year 08
25.10.2012Renewal fee patent year 09
28.10.2013Renewal fee patent year 10
27.10.2014Renewal fee patent year 11
27.10.2015Renewal fee patent year 12
27.10.2016Renewal fee patent year 13
27.10.2017Renewal fee patent year 14
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.10.2004
AT10.01.2018
CY10.01.2018
CZ10.01.2018
DK10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
MC10.01.2018
NL10.01.2018
PL10.01.2018
PT10.01.2018
RO10.01.2018
SE10.01.2018
SI10.01.2018
SK10.01.2018
TR10.01.2018
BG10.04.2018
GR11.04.2018
[2020/30]
Former [2020/27]AT10.01.2018
CY10.01.2018
CZ10.01.2018
DK10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
MC10.01.2018
NL10.01.2018
PL10.01.2018
PT10.01.2018
RO10.01.2018
SE10.01.2018
SI10.01.2018
SK10.01.2018
TR10.01.2018
BG10.04.2018
GR11.04.2018
Former [2020/16]AT10.01.2018
CY10.01.2018
CZ10.01.2018
DK10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
MC10.01.2018
NL10.01.2018
PL10.01.2018
RO10.01.2018
SE10.01.2018
SI10.01.2018
SK10.01.2018
TR10.01.2018
BG10.04.2018
GR11.04.2018
Former [2019/28]AT10.01.2018
CY10.01.2018
CZ10.01.2018
DK10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
MC10.01.2018
NL10.01.2018
PL10.01.2018
RO10.01.2018
SE10.01.2018
SI10.01.2018
SK10.01.2018
BG10.04.2018
GR11.04.2018
Former [2019/13]AT10.01.2018
CY10.01.2018
CZ10.01.2018
DK10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
NL10.01.2018
PL10.01.2018
RO10.01.2018
SE10.01.2018
SI10.01.2018
SK10.01.2018
BG10.04.2018
GR11.04.2018
Former [2018/51]AT10.01.2018
CY10.01.2018
CZ10.01.2018
DK10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
NL10.01.2018
PL10.01.2018
RO10.01.2018
SE10.01.2018
SK10.01.2018
BG10.04.2018
GR11.04.2018
Former [2018/50]AT10.01.2018
CY10.01.2018
CZ10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
NL10.01.2018
PL10.01.2018
RO10.01.2018
SE10.01.2018
SK10.01.2018
BG10.04.2018
GR11.04.2018
Former [2018/49]AT10.01.2018
CY10.01.2018
EE10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
NL10.01.2018
PL10.01.2018
RO10.01.2018
SE10.01.2018
BG10.04.2018
GR11.04.2018
Former [2018/47]AT10.01.2018
CY10.01.2018
ES10.01.2018
FI10.01.2018
IT10.01.2018
NL10.01.2018
PL10.01.2018
SE10.01.2018
BG10.04.2018
GR11.04.2018
Former [2018/40]AT10.01.2018
CY10.01.2018
ES10.01.2018
FI10.01.2018
NL10.01.2018
PL10.01.2018
SE10.01.2018
BG10.04.2018
GR11.04.2018
Former [2018/39]AT10.01.2018
CY10.01.2018
ES10.01.2018
FI10.01.2018
NL10.01.2018
PL10.01.2018
SE10.01.2018
GR11.04.2018
Former [2018/38]AT10.01.2018
CY10.01.2018
ES10.01.2018
FI10.01.2018
NL10.01.2018
PL10.01.2018
GR11.04.2018
Former [2018/37]CY10.01.2018
ES10.01.2018
FI10.01.2018
NL10.01.2018
PL10.01.2018
GR11.04.2018
Former [2018/36]CY10.01.2018
ES10.01.2018
FI10.01.2018
NL10.01.2018
PL10.01.2018
Former [2018/34]FI10.01.2018
NL10.01.2018
Cited inInternational search[A]US3713753  (BRUNSCH K) [A] 1-10 * column 5, line 33 - column 6, line 17; figures 1-3 *;
 [A]US4066249  (HUBER JOHN G, et al) [A] 1-10 * column 1, line 41 - column 2, line 24; figures 1,2 *;
 [A]US4200271  (AUGUST ARTHUR [US], et al) [A] 1-10 * column 2, line 29 - line 37; figure 1 * * column 2, line 54 - line 61 * * column 3, line 1 - line 22; figure 6 * * column 4, line 23 - line 31; compounds 17-20 *;
 [A]FR2597395  (MAN TECHNOLOGIE GMBH [BE]) [A] 1-10 * page 3, line 16 - page 4, line 5; figure 1 * * page 4, line 10 - line 35; figure 3 *;
 [A]US5204033  (PEARCE ROBERT G [US], et al) [A] 1-10 * column 6, line 55 - column 7, line 10; figures 6,7 *;
 [A]GB2310822  (EURO PROJECTS LTD [GB], et al) [A] 1-10 * page 10, line 8 - page 11, line 19; figure 1 *;
 [A]WO0018555  (AIRTECH INT INC [US], et al) [A] 1-10 * page 5, line 26 - page 6, line 17; figure 1 ** page 7, line 30 - page 8, line 18 *;
 [A]US6102241  (PALAZZO DAVID T [US]) [A] 1-10 * column 4, line 38 - line 44; figures 1,12 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.