EP1702191 - COLLAR RIB FOR HEAT EXCHANGER TANKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 21.02.2020 | ||
Former | Grant of patent is intended Status updated on 29.10.2019 | ||
Former | Examination is in progress Status updated on 18.11.2016 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Valeo, Inc. 4100 N. Atlantic Blvd. Auburn Hills, MI 48326 / US | [2006/38] | Inventor(s) | 01 /
POWERS, Michael 1434 Southwestern Drive Lakewood, NY 14750 / US | 02 /
CARAPELLATTI, Scot 3062 Rt. 16N. Olean, NY 14760 / US | 03 /
DAY, Alan 7, impasse des Carmelites F-51100 Reims / FR | 04 /
FAILLE, Philippe 4 bis, rue Houzeau-Muiron F-51100 Reims / FR | 05 /
GUERAND, Michel 96, rue des Panoufles F-77165 Saint Soupplets / FR | [2006/38] | Representative(s) | Neuviale, Bertrand, et al Valeo Systèmes Thermiques ZA L'Agiot 8, rue Louis Lormand CS 80517 La Verrière 78322 Le Mesnil Saint Denis Cedex / FR | [2020/13] |
Former [2006/38] | Rolland, Jean-Christophe Valeo Systèmes Thermiques, 8 rue Louis Lormand 78321 La Verrière / FR | Application number, filing date | 04814284.8 | 15.12.2004 | [2006/38] | WO2004US42079 | Priority number, date | US20030530957P | 19.12.2003 Original published format: US 530957 P | [2006/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2005066568 | Date: | 21.07.2005 | Language: | EN | [2005/29] | Type: | A1 Application with search report | No.: | EP1702191 | Date: | 20.09.2006 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.07.2005 takes the place of the publication of the European patent application. | [2006/38] | Type: | B1 Patent specification | No.: | EP1702191 | Date: | 25.03.2020 | Language: | EN | [2020/13] | Search report(s) | International search report - published on: | EP | 21.07.2005 | Classification | IPC: | F28F9/02 | [2006/38] | CPC: |
F28F9/182 (EP,US);
F28F9/0226 (EP,US);
Y10T29/49389 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2020/13] |
Former [2006/38] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | KRAGEN FÜR SAMMLER EINES WÄRMETAUSCHERS | [2006/38] | English: | COLLAR RIB FOR HEAT EXCHANGER TANKS | [2006/38] | French: | NERVURE DE BAGUE POUR COLLECTEURS D'ECHANGEURS THERMIQUES | [2006/38] | Entry into regional phase | 09.06.2006 | National basic fee paid | 09.06.2006 | Designation fee(s) paid | 09.06.2006 | Examination fee paid | Examination procedure | 09.06.2006 | Examination requested [2006/38] | 11.01.2007 | Despatch of a communication from the examining division (Time limit: M06) | 18.07.2007 | Reply to a communication from the examining division | 15.09.2015 | Despatch of a communication from the examining division (Time limit: M04) | 19.01.2016 | Reply to a communication from the examining division | 25.04.2016 | Despatch of a communication from the examining division (Time limit: M04) | 02.08.2016 | Reply to a communication from the examining division | 09.11.2016 | Despatch of a communication from the examining division (Time limit: M04) | 19.01.2017 | Reply to a communication from the examining division | 24.04.2017 | Despatch of a communication from the examining division (Time limit: M06) | 09.10.2017 | Reply to a communication from the examining division | 22.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 09.07.2018 | Reply to a communication from the examining division | 17.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 12.04.2019 | Reply to a communication from the examining division | 30.10.2019 | Communication of intention to grant the patent | 13.02.2020 | Fee for grant paid | 13.02.2020 | Fee for publishing/printing paid | 13.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.01.2007 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 16.11.2006 | Renewal fee patent year 03 | 15.11.2007 | Renewal fee patent year 04 | 17.11.2008 | Renewal fee patent year 05 | 19.11.2009 | Renewal fee patent year 06 | 16.11.2010 | Renewal fee patent year 07 | 17.11.2011 | Renewal fee patent year 08 | 22.11.2012 | Renewal fee patent year 09 | 22.11.2013 | Renewal fee patent year 10 | 26.11.2014 | Renewal fee patent year 11 | 27.11.2015 | Renewal fee patent year 12 | 30.11.2016 | Renewal fee patent year 13 | 29.11.2017 | Renewal fee patent year 14 | 29.11.2018 | Renewal fee patent year 15 | 29.11.2019 | Renewal fee patent year 16 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.12.2004 | AT | 25.03.2020 | CY | 25.03.2020 | DK | 25.03.2020 | EE | 25.03.2020 | FI | 25.03.2020 | IT | 25.03.2020 | LT | 25.03.2020 | MC | 25.03.2020 | NL | 25.03.2020 | RO | 25.03.2020 | SE | 25.03.2020 | SI | 25.03.2020 | SK | 25.03.2020 | BG | 25.06.2020 | GR | 26.06.2020 | PT | 18.08.2020 | GB | 15.12.2020 | IE | 15.12.2020 | LU | 15.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/33] |
Former [2022/27] | HU | 15.12.2004 | |
AT | 25.03.2020 | ||
CY | 25.03.2020 | ||
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
PT | 18.08.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/10] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
PT | 18.08.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/49] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
GB | 15.12.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
Former [2021/47] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
IE | 15.12.2020 | ||
LU | 15.12.2020 | ||
Former [2021/46] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
IE | 15.12.2020 | ||
Former [2021/40] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
MC | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/24] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SI | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/10] | AT | 25.03.2020 | |
DK | 25.03.2020 | ||
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
IT | 25.03.2020 | ||
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2021/08] | DK | 25.03.2020 | |
EE | 25.03.2020 | ||
FI | 25.03.2020 | ||
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/50] | EE | 25.03.2020 | |
FI | 25.03.2020 | ||
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/49] | FI | 25.03.2020 | |
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
SK | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/48] | FI | 25.03.2020 | |
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
RO | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
PT | 18.08.2020 | ||
Former [2020/47] | FI | 25.03.2020 | |
LT | 25.03.2020 | ||
NL | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/46] | FI | 25.03.2020 | |
NL | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
IS | 25.07.2020 | ||
Former [2020/45] | FI | 25.03.2020 | |
NL | 25.03.2020 | ||
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/39] | FI | 25.03.2020 | |
SE | 25.03.2020 | ||
BG | 25.06.2020 | ||
GR | 26.06.2020 | ||
Former [2020/38] | FI | 25.03.2020 | |
SE | 25.03.2020 | ||
GR | 26.06.2020 | ||
Former [2020/35] | FI | 25.03.2020 | Cited in | International search | [XA]DE29504526U (AUTOKUEHLER GMBH & CO KG [DE]) [X] 1-6,10-16 * abstract * [A] 7-9; | [A]US2002134529 (NOZAKI TAKAHIRO [JP], et al) [A] 1-16 * figures 1-4 *; | [A]FR2752929 (VALEO THERMIQUE MOTEUR SA [FR]) [A] 1-16 * page 1 * | Examination | US5758721 |