blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1662051

EP1662051 - Method of connecting municipal manhole with supply mains to buildung supply [Right-click to bookmark this link]
Former [2006/22]System for connecting manhole with supply mains to buildung
[2015/16]
StatusNo opposition filed within time limit
Status updated on  24.06.2016
Database last updated on 02.08.2024
Most recent event   Tooltip13.10.2017Lapse of the patent in a contracting state
New state(s): BE, BG, CY, HU, TR
published on 15.11.2017  [2017/46]
Applicant(s)For all designated states
Würmseher, Hans, Dipl.-Ing.
Hochstrasse 20
94009 Ruhstorf / DE
[2006/22]
Inventor(s)01 / see applicant
...
 [2006/22]
Representative(s)Faul, Claus-Peter
Postfach 65
84360 Bad Birnbach / DE
[2015/34]
Former [2008/07]Faul, Claus-Peter
Postfach 65
84360 Bad Birnbach / DE
Former [2006/22]Strasse, Joachim, et al
Schenkemaier Weg 16
84364 Bad Birnbach / DE
Application number, filing date05110882.717.11.2005
[2006/22]
Priority number, dateDE20042018430U28.11.2004         Original published format: DE 202004018430 U
[2006/22]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1662051
Date:31.05.2006
Language:DE
[2006/22]
Type: A3 Search report 
No.:EP1662051
Date:03.01.2007
[2007/01]
Type: B1 Patent specification 
No.:EP1662051
Date:19.08.2015
Language:DE
[2015/34]
Search report(s)(Supplementary) European search report - dispatched on:EP06.12.2006
ClassificationIPC:E02D29/12, E03F5/02
[2007/01]
CPC:
E03F5/021 (EP); E03F3/02 (EP); E03F5/02 (EP);
F16L41/03 (EP)
Former IPC [2006/22]E02D29/12
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2015/34]
Former [2006/22]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren zum Verbinden eines öffentlichen Verteilerschachtes mit einem Hausanschluss[2015/16]
English:Method of connecting municipal manhole with supply mains to buildung supply[2015/16]
French:Procédé de raccorder puit de conduits d'alimentation municipale avec les conduits d'alimentation de batiment[2015/16]
Former [2006/22]System zum Verbinden eines Verteilerschachtes mit einem Hausanschluss
Former [2006/22]System for connecting manhole with supply mains to buildung
Former [2006/22]Système pour raccorder puit de conduits d'alimentation avec batiment
Examination procedure21.06.2007Examination requested  [2007/31]
23.07.2007Despatch of a communication from the examining division (Time limit: M06)
02.02.2008Reply to a communication from the examining division
16.05.2011Despatch of a communication from the examining division (Time limit: M06)
03.01.2012Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
09.01.2012Reply to a communication from the examining division
27.03.2015Communication of intention to grant the patent
08.07.2015Fee for grant paid
08.07.2015Fee for publishing/printing paid
08.07.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  23.07.2007
Opposition(s)20.05.2016No opposition filed within time limit [2016/30]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
12.01.2012Request for further processing filed
12.01.2012Full payment received (date of receipt of payment)
Request granted
27.01.2012Decision despatched
Fees paidRenewal fee
20.11.2007Renewal fee patent year 03
12.11.2008Renewal fee patent year 04
01.09.2009Renewal fee patent year 05
29.11.2010Renewal fee patent year 06
21.09.2011Renewal fee patent year 07
31.08.2012Renewal fee patent year 08
04.10.2013Renewal fee patent year 09
02.10.2014Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.11.2005
BG19.08.2015
CY19.08.2015
CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SI19.08.2015
SK19.08.2015
TR19.08.2015
IE17.11.2015
LU17.11.2015
GB19.11.2015
GR20.11.2015
BE30.11.2015
CH30.11.2015
FR30.11.2015
LI30.11.2015
IS19.12.2015
PT21.12.2015
[2017/39]
Former [2016/50]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SI19.08.2015
SK19.08.2015
IE17.11.2015
LU17.11.2015
GB19.11.2015
GR20.11.2015
CH30.11.2015
FR30.11.2015
LI30.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/47]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SI19.08.2015
SK19.08.2015
IE17.11.2015
LU17.11.2015
GB19.11.2015
GR20.11.2015
CH30.11.2015
LI30.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/45]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SI19.08.2015
SK19.08.2015
IE17.11.2015
LU17.11.2015
GR20.11.2015
CH30.11.2015
LI30.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/36]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SI19.08.2015
SK19.08.2015
LU17.11.2015
GR20.11.2015
CH30.11.2015
LI30.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/33]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SK19.08.2015
LU17.11.2015
GR20.11.2015
CH30.11.2015
LI30.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/31]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SK19.08.2015
LU17.11.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/28]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
MC19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SK19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/23]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
SK19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/22]CZ19.08.2015
DK19.08.2015
EE19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/21]DK19.08.2015
ES19.08.2015
FI19.08.2015
IT19.08.2015
LT19.08.2015
LV19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/20]DK19.08.2015
ES19.08.2015
FI19.08.2015
LT19.08.2015
LV19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/14]ES19.08.2015
FI19.08.2015
LT19.08.2015
LV19.08.2015
NL19.08.2015
PL19.08.2015
SE19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/10]ES19.08.2015
FI19.08.2015
LT19.08.2015
LV19.08.2015
PL19.08.2015
SE19.08.2015
GR20.11.2015
IS19.12.2015
PT21.12.2015
Former [2016/09]FI19.08.2015
LT19.08.2015
LV19.08.2015
GR20.11.2015
Former [2016/07]LT19.08.2015
Documents cited:Search[X]CH589247  (BUCHS METALLWERK AG) [X] 6 * column 2, line 1 - line 3; figure 1 *;
 [DX]DE20112443U  (WUERMSEHER HANS [DE]) [DX] 7* figure 1 *;
 [DA]DE10023399  (WUERMSEHER HANS [DE]) [DA] 1 * paragraph [0006] - paragraph [0008] * * paragraph [0031]; figure 1 *;
 [X]GB2391245  (SAVAGE PETER LTD [GB]) [X] 7 * page 5, line 4; figures 1-3 *
by applicantDE29908863U
 DE10023399
 DE10233981
 DE20319998U
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.