blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1586428

EP1586428 - Process for the preparation of toast bread without crust, and installation for carrying out this process [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.06.2010
Database last updated on 15.07.2024
Most recent event   Tooltip19.10.2012Lapse of the patent in a contracting state
New state(s): TR
published on 21.11.2012  [2012/47]
Applicant(s)For all designated states
Harry's France S.A.S.
Rue du Grand Pré
36004 Chateauroux Cedex / FR
[2005/42]
Inventor(s)01 / Maucotel, Thierry
2, Impasse Riblier
85100 Les sables d'Olonne / FR
02 / Gauthier, Jean-Bernard
18, rue des Champs Grands
36130 Coings / FR
 [2005/42]
Representative(s)Ferreccio, Rinaldo, et al
Botti & Ferrari S.p.A.
Via Cappellini, 11
20124 Milano / IT
[N/P]
Former [2010/23]Ferreccio, Rinaldo, et al
c/o Botti & Ferrari S.r.l. Via Locatelli 5
20124 Milano / IT
Former [2005/42]Chameroy, Claude, et al
Cabinet Malemont 42, avenue du Président Wilson
75116 Paris / FR
Application number, filing date05290488.504.03.2005
[2005/42]
Priority number, dateFR2004000312026.03.2004         Original published format: FR 0403120
[2005/42]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP1586428
Date:19.10.2005
Language:FR
[2005/42]
Type: B1 Patent specification 
No.:EP1586428
Date:05.08.2009
Language:FR
[2009/32]
Search report(s)(Supplementary) European search report - dispatched on:EP09.05.2005
ClassificationIPC:A21D15/06, B26D7/27
[2009/14]
CPC:
A21C15/00 (EP); B26D7/10 (EP); B26D7/32 (EP)
Former IPC [2005/42]B26D7/27
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2009/13]
Former [2005/42]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren zur Herstellung von Toastbrot ohne Kruste, und Anlage zur Durchführung dieses Verfahrens[2005/42]
English:Process for the preparation of toast bread without crust, and installation for carrying out this process[2005/42]
French:Procédé et installation de fabrication de pain de mie tranché sans croute.[2005/42]
Examination procedure30.11.2005Examination requested  [2006/04]
14.01.2009Despatch of a communication from the examining division (Time limit: M04)
10.02.2009Reply to a communication from the examining division
26.03.2009Communication of intention to grant the patent
18.06.2009Fee for grant paid
18.06.2009Fee for publishing/printing paid
Opposition(s)07.05.2010No opposition filed within time limit [2010/28]
Fees paidRenewal fee
23.03.2007Renewal fee patent year 03
22.03.2008Renewal fee patent year 04
16.02.2009Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT05.08.2009
CY05.08.2009
CZ05.08.2009
DK05.08.2009
EE05.08.2009
FI05.08.2009
IE05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
RO05.08.2009
SE05.08.2009
SI05.08.2009
SK05.08.2009
TR05.08.2009
BG05.11.2009
GR06.11.2009
IS05.12.2009
PT05.12.2009
HU06.02.2010
MC31.03.2010
[2012/47]
Former [2012/42]AT05.08.2009
CY05.08.2009
CZ05.08.2009
DK05.08.2009
EE05.08.2009
FI05.08.2009
IE05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
RO05.08.2009
SE05.08.2009
SI05.08.2009
SK05.08.2009
BG05.11.2009
GR06.11.2009
IS05.12.2009
PT05.12.2009
HU06.02.2010
MC31.03.2010
Former [2012/37]AT05.08.2009
CY05.08.2009
CZ05.08.2009
DK05.08.2009
EE05.08.2009
FI05.08.2009
IE05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
RO05.08.2009
SE05.08.2009
SI05.08.2009
SK05.08.2009
BG05.11.2009
GR06.11.2009
IS05.12.2009
PT05.12.2009
MC31.03.2010
Former [2010/46]AT05.08.2009
CZ05.08.2009
DK05.08.2009
EE05.08.2009
FI05.08.2009
IE05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
RO05.08.2009
SE05.08.2009
SI05.08.2009
SK05.08.2009
BG05.11.2009
GR06.11.2009
IS05.12.2009
PT05.12.2009
MC31.03.2010
Former [2010/23]AT05.08.2009
CZ05.08.2009
DK05.08.2009
EE05.08.2009
FI05.08.2009
IE05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
RO05.08.2009
SE05.08.2009
SI05.08.2009
SK05.08.2009
BG05.11.2009
IS05.12.2009
PT05.12.2009
Former [2010/20]AT05.08.2009
DK05.08.2009
EE05.08.2009
FI05.08.2009
IE05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
SE05.08.2009
SI05.08.2009
BG05.11.2009
IS05.12.2009
PT05.12.2009
Former [2010/17]AT05.08.2009
FI05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
SE05.08.2009
SI05.08.2009
BG05.11.2009
IS05.12.2009
PT05.12.2009
Former [2010/12]AT05.08.2009
FI05.08.2009
LT05.08.2009
NL05.08.2009
PL05.08.2009
SE05.08.2009
SI05.08.2009
IS05.12.2009
Documents cited:Search[A]GB1435278  (FORTSCHRITT VEB K) [A] 1-9 * claims 3,4 *;
 [A]EP0312978  (HERLITZIUS GMBH & CO KG GEB [DE]) [A] 1-9* claims 1,5,8-11 *;
 [XA]GB2338168  (ALLIED BAKERIES LTD [GB]) [X] 9 * claim 7 * [A] 1-8
by applicantEP0312978
 GB2338168
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.