blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1607553

EP1607553 - Lock cylinder [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  09.06.2017
Database last updated on 30.10.2024
Most recent event   Tooltip06.03.2020Lapse of the patent in a contracting state
New state(s): TR
published on 08.04.2020  [2020/15]
Applicant(s)For all designated states
ASSA ABLOY (Schweiz) AG
Untere Schwandenstrasse 22
8805 Richterswil / CH
[2016/30]
Former [2005/51]For all designated states
KESO AG
Untere Schwandenstrasse 22
8805 Richterswil / CH
Inventor(s)01 / Keller, Ernst
Studenbühlstrasse 45
8832 Wollerau / CH
 [2005/51]
Representative(s)Frischknecht, Harry Ralph, et al
Isler & Pedrazzini AG
Giesshübelstrasse 45
Postfach 1772
8027 Zürich / CH
[N/P]
Former [2012/21]Frischknecht, Harry Ralph, et al
Isler & Pedrazzini AG Gotthardstrasse 53 Postfach 1772
8027 Zürich / CH
Former [2008/44]Groner, Manfred, et al
Isler & Pedrazzini AG Gotthardstrasse 53 Postfach 1772
8027 Zürich / CH
Former [2005/51]Groner, Manfred, et al
Isler & Pedrazzini AG, Postfach 6940
8023 Zürich / CH
Application number, filing date05405371.508.06.2005
[2005/51]
Priority number, dateCH2004000100915.06.2004         Original published format: CH 10092004
[2005/51]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1607553
Date:21.12.2005
Language:DE
[2005/51]
Type: A3 Search report 
No.:EP1607553
Date:30.06.2010
[2010/26]
Type: B1 Patent specification 
No.:EP1607553
Date:03.08.2016
Language:DE
[2016/31]
Search report(s)(Supplementary) European search report - dispatched on:EP31.05.2010
ClassificationIPC:E05B27/00
[2016/01]
CPC:
E05B27/005 (EP,US); E05B27/0014 (EP,US); E05B27/0017 (EP,US);
Y10T70/7452 (EP,US); Y10T70/7565 (EP,US); Y10T70/7605 (EP,US);
Y10T70/7734 (EP,US); Y10T70/774 (EP,US) (-)
Former IPC [2005/51]E05B27/06
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2016/31]
Former [2005/51]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesAL24.07.2010
BA24.07.2010
HR24.07.2010
LV24.07.2010
MK24.07.2010
YU24.07.2010
TitleGerman:Schliesszylinder[2005/51]
English:Lock cylinder[2005/51]
French:Serrure cylindrique[2005/51]
Examination procedure24.07.2010Examination requested  [2010/36]
16.12.2011Despatch of a communication from the examining division (Time limit: M04)
17.04.2012Reply to a communication from the examining division
04.04.2013Despatch of a communication from the examining division (Time limit: M04)
25.07.2013Reply to a communication from the examining division
22.04.2014Communication of intention to grant the patent
25.09.2014Despatch of a communication from the examining division (Time limit: M04)
23.01.2015Reply to a communication from the examining division
15.01.2016Communication of intention to grant the patent
20.05.2016Fee for grant paid
20.05.2016Fee for publishing/printing paid
20.05.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  16.12.2011
Opposition(s)04.05.2017No opposition filed within time limit [2017/28]
Fees paidRenewal fee
19.04.2007Renewal fee patent year 03
27.03.2008Renewal fee patent year 04
21.04.2009Renewal fee patent year 05
21.04.2010Renewal fee patent year 06
23.06.2011Renewal fee patent year 07
31.03.2012Renewal fee patent year 08
08.05.2013Renewal fee patent year 09
12.06.2014Renewal fee patent year 10
10.06.2015Renewal fee patent year 11
10.06.2016Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.06.2005
CY03.08.2016
CZ03.08.2016
DK03.08.2016
EE03.08.2016
ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
MC03.08.2016
NL03.08.2016
PL03.08.2016
RO03.08.2016
SE03.08.2016
SI03.08.2016
SK03.08.2016
TR03.08.2016
BG03.11.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
[2020/15]
Former [2019/46]HU08.06.2005
CY03.08.2016
CZ03.08.2016
DK03.08.2016
EE03.08.2016
ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
MC03.08.2016
NL03.08.2016
PL03.08.2016
RO03.08.2016
SE03.08.2016
SI03.08.2016
SK03.08.2016
BG03.11.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
Former [2019/31]HU08.06.2005
CZ03.08.2016
DK03.08.2016
EE03.08.2016
ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
MC03.08.2016
NL03.08.2016
PL03.08.2016
RO03.08.2016
SE03.08.2016
SI03.08.2016
SK03.08.2016
BG03.11.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
Former [2018/11]CZ03.08.2016
DK03.08.2016
EE03.08.2016
ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
MC03.08.2016
NL03.08.2016
PL03.08.2016
RO03.08.2016
SE03.08.2016
SI03.08.2016
SK03.08.2016
BG03.11.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
Former [2017/37]CZ03.08.2016
DK03.08.2016
EE03.08.2016
ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
NL03.08.2016
PL03.08.2016
RO03.08.2016
SE03.08.2016
SI03.08.2016
SK03.08.2016
BG03.11.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
Former [2017/32]CZ03.08.2016
DK03.08.2016
EE03.08.2016
ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
NL03.08.2016
PL03.08.2016
RO03.08.2016
SE03.08.2016
SK03.08.2016
BG03.11.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
Former [2017/11]ES03.08.2016
FI03.08.2016
IT03.08.2016
LT03.08.2016
NL03.08.2016
PL03.08.2016
SE03.08.2016
GR04.11.2016
IS03.12.2016
PT05.12.2016
Former [2017/10]FI03.08.2016
IT03.08.2016
LT03.08.2016
NL03.08.2016
PL03.08.2016
SE03.08.2016
IS03.12.2016
Former [2017/09]FI03.08.2016
IT03.08.2016
LT03.08.2016
NL03.08.2016
Former [2017/07]LT03.08.2016
Documents cited:Search[XA]US2427837  (CONNELL JOHN A) [X] 14 * column 3, line 21 - line 39; figures 4,5,13,14 * [A] 15,16;
 [X]US3824818  (NEALE C) [X] 14-16 * figure 13 *;
 [A]US4185480  (PECHNER JULIUS [US]) [A] 1-13 * column 3, line 51 - line 55; figures 1-7 * * column 4, line 7 - line 13 * * column 5, line 1 - line 16 * * column 6, line 50 - line 58 *;
 [AD]EP0250701  (EVVA WERKE [AT]) [AD] 1,5,10-12 * figures 1-6 *;
 [AD]EP0918124  (GOAL KK [JP]) [AD] 1,5,10-12 * figures 3,5,7,8 *;
 [A]EP0937843  (KELLER ERNST [CH]) [A] 1,6,7* column 2, line 49 - line 54; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.