EP1716427 - AN RF COIL SYSTEM FOR AN MRI SYSTEM WITH A FIXED AND A MOVING PART [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.11.2019 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 23.11.2018 | ||
Former | Grant of patent is intended Status updated on 27.06.2018 | ||
Former | Examination is in progress Status updated on 08.11.2016 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Koninklijke Philips N.V. High Tech Campus 5 5656 AE Eindhoven / NL | [2018/52] |
Former [2013/39] | For all designated states Koninklijke Philips N.V. High Tech Campus 5 5656 AE Eindhoven / NL | ||
Former [2006/44] | For all designated states Koninklijke Philips Electronics N.V. Groenewoudseweg 1 5621 BA Eindhoven / NL | Inventor(s) | 01 /
HOOGEVEEN, Romhild, M. c/o Prof. Holstlaan 6 NL-5656 AA Eindhoven / NL | [2006/44] | Representative(s) | Cohen, Julius Simon, et al Philips Intellectual Property & Standards High Tech Campus 5 5656 AE Eindhoven / NL | [2018/52] |
Former [2006/44] | Cohen, Julius Simon, et al Philips Intellectual Property & Standards, P.O. Box 220 5600 AE Eindhoven / NL | Application number, filing date | 05702882.1 | 03.02.2005 | [2006/44] | WO2005IB50447 | Priority number, date | EP20040100475 | 09.02.2004 Original published format: EP 04100475 | [2006/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2005076027 | Date: | 18.08.2005 | Language: | EN | [2005/33] | Type: | A1 Application with search report | No.: | EP1716427 | Date: | 02.11.2006 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.08.2005 takes the place of the publication of the European patent application. | [2006/44] | Type: | B1 Patent specification | No.: | EP1716427 | Date: | 26.12.2018 | Language: | EN | [2018/52] | Search report(s) | International search report - published on: | EP | 18.08.2005 | Classification | IPC: | G01R33/28 | [2006/44] | CPC: |
G01R33/341 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2018/52] |
Former [2006/44] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | HF-SPULENSYSTEM FÜR EIN MRI-SYSTEM MIT EINEM FESTEN UND EINEM BEWEGLICHEN TEIL | [2006/44] | English: | AN RF COIL SYSTEM FOR AN MRI SYSTEM WITH A FIXED AND A MOVING PART | [2006/44] | French: | SYSTEME DE BOBINE RF DESTINE A UN SYSTEME D'IRM COMPORTANT UNE PARTIE FIXE ET UNE PARTIE MOBILE | [2006/44] | Entry into regional phase | 11.09.2006 | National basic fee paid | 11.09.2006 | Designation fee(s) paid | 11.09.2006 | Examination fee paid | Examination procedure | 11.09.2006 | Examination requested [2006/44] | 30.10.2007 | Despatch of a communication from the examining division (Time limit: M04) | 13.02.2008 | Reply to a communication from the examining division | 27.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 03.11.2016 | Reply to a communication from the examining division | 28.06.2018 | Communication of intention to grant the patent | 31.10.2018 | Receipt of the translation of the claim(s) | 08.11.2018 | Fee for grant paid | 08.11.2018 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 30.10.2007 | Opposition(s) | 27.09.2019 | No opposition filed within time limit [2019/49] | Fees paid | Renewal fee | 28.02.2007 | Renewal fee patent year 03 | 29.02.2008 | Renewal fee patent year 04 | 28.03.2008 | Renewal fee patent year 05 | 01.03.2010 | Renewal fee patent year 06 | 28.02.2011 | Renewal fee patent year 07 | 29.02.2012 | Renewal fee patent year 08 | 28.02.2013 | Renewal fee patent year 09 | 28.02.2014 | Renewal fee patent year 10 | 02.03.2015 | Renewal fee patent year 11 | 29.02.2016 | Renewal fee patent year 12 | 28.02.2017 | Renewal fee patent year 13 | 28.02.2018 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.02.2005 | AT | 26.12.2018 | CY | 26.12.2018 | CZ | 26.12.2018 | DK | 26.12.2018 | EE | 26.12.2018 | ES | 26.12.2018 | FI | 26.12.2018 | IT | 26.12.2018 | LT | 26.12.2018 | MC | 26.12.2018 | NL | 26.12.2018 | PL | 26.12.2018 | RO | 26.12.2018 | SE | 26.12.2018 | SI | 26.12.2018 | SK | 26.12.2018 | TR | 26.12.2018 | IE | 03.02.2019 | LU | 03.02.2019 | BE | 28.02.2019 | CH | 28.02.2019 | LI | 28.02.2019 | BG | 26.03.2019 | GR | 27.03.2019 | IS | 26.04.2019 | PT | 26.04.2019 | [2021/32] |
Former [2021/26] | AT | 26.12.2018 | |
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
TR | 26.12.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/17] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
TR | 26.12.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/12] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
BE | 28.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/09] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
IE | 03.02.2019 | ||
LU | 03.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/04] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
LU | 03.02.2019 | ||
CH | 28.02.2019 | ||
LI | 28.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/48] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
LU | 03.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/47] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
LU | 03.02.2019 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/46] | AT | 26.12.2018 | |
CZ | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/45] | CZ | 26.12.2018 | |
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/39] | CZ | 26.12.2018 | |
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/37] | CZ | 26.12.2018 | |
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/35] | CZ | 26.12.2018 | |
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/34] | FI | 26.12.2018 | |
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/33] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/30] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/25] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/22] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
BG | 26.03.2019 | ||
Former [2019/21] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
Former [2019/20] | LT | 26.12.2018 | Cited in | International search | [A]JP2002010992 ; | [X]US2002021128 (KUHARA SHIGEHIDE [JP]) [X] 1-12 * page 1, paragraph 10 - page 5, paragraph 64 * * page 5, paragraph 65; figure 3 *; | [XA]US2002140423 (BRITTAIN JEAN HELEN [US]) [X] 1,11 * page 1, paragraph 7 - page 2, paragraph 12 * * page 3, paragraph 30 * [A] 2-10,12; | [XA]EP1249708 (GE MED SYS GLOBAL TECH CO LLC [US]) [X] 1,2,11,12 * page 4, paragraph 19 * [A] 3-10 | [A] - PATENT ABSTRACTS OF JAPAN, (20020503), vol. 2002, no. 05, & JP2002010992 A 20020115 (TOSHIBA CORP) [A] 1-12 * abstract * | Examination | US2002021128 | by applicant | US5600245 | US2002021128 | US2002138001 |