EP1774637 - Rotor assembly, in which at least one inter-claw space is sealed by the fan [Right-click to bookmark this link] | |||
Former [2007/16] | ROTOR ASSEMBLY, IN WHICH AT LEAST ONE INTER-CLAW SPACE IS SEALED BY THE FAN | ||
[2012/30] | Status | No opposition filed within time limit Status updated on 27.09.2013 Database last updated on 11.05.2024 | Most recent event Tooltip | 01.07.2016 | Lapse of the patent in a contracting state New state(s): IS | published on 03.08.2016 [2016/31] | Applicant(s) | For all designated states VALEO EQUIPEMENTS ELECTRIQUES MOTEUR 2, Rue André Boulle 94017 Créteil Cedex / FR | [2007/16] | Inventor(s) | 01 /
VASILESCU, Claudiu 2, square Vitruve F-75020 Paris / FR | [2007/16] | Representative(s) | de Lambilly Delorme, Marie Pierre Valéo Equipements Electriques Moteur Propriété Industrielle 2, rue André-Boulle 94046 Créteil Cedex / FR | [N/P] |
Former [2012/47] | de Lambilly Delorme, Marie Pierre Valéo Equipements Electriques Moteur Propriété Industrielle 2, rue André-Boulle 94046 Créteil Cedex / FR | ||
Former [2007/16] | de Lambilly Delorme, Marie Pierre Valéo Equipements Electriques Moteur Propriété Industrielle 2, rue André-Boulle BP 150 94017 Créteil Cedex / FR | Application number, filing date | 05731012.0 | 24.02.2005 | [2007/16] | WO2005FR00434 | Priority number, date | FR20040002030 | 27.02.2004 Original published format: FR 0402030 | [2007/16] | Filing language | FR | Procedural language | FR | Publication | Type: | A2 Application without search report | No.: | WO2005091465 | Date: | 29.09.2005 | Language: | FR | [2005/39] | Type: | A2 Application without search report | No.: | EP1774637 | Date: | 18.04.2007 | Language: | FR | The application published by WIPO in one of the EPO official languages on 29.09.2005 takes the place of the publication of the European patent application. | [2007/16] | Type: | B1 Patent specification | No.: | EP1774637 | Date: | 21.11.2012 | Language: | FR | [2012/47] | Search report(s) | International search report - published on: | EP | 08.12.2005 | Classification | IPC: | H02K9/06 | [2007/16] | CPC: |
F04D29/667 (EP,US);
H02K9/06 (EP,KR,US);
H02K1/22 (KR);
H02K1/243 (EP,US);
H02K9/00 (KR)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, MC, NL, PL, PT, RO, SE, SI, SK, TR [2007/16] | Title | German: | Rotorbaugruppe, worin mindestens ein Raum zwischen Klammern durch den Lüfter verschlossen wird | [2012/30] | English: | Rotor assembly, in which at least one inter-claw space is sealed by the fan | [2012/30] | French: | Ensemble rotorique dont au moins un espace intergriffes est obture par le ventilateur | [2012/30] |
Former [2007/16] | ROTORBAUGRUPPE, WORIN MINDESTENS EIN RAUM ZWISCHEN KLAMMERN DURCH DEN LÜFTER VERSCHLOSSEN WIRD | ||
Former [2007/16] | ROTOR ASSEMBLY, IN WHICH AT LEAST ONE INTER-CLAW SPACE IS SEALED BY THE FAN | ||
Former [2007/16] | ENSEMBLE ROTORIQUE DONT AU MOINS UN ESPACE INTERGRIFFES EST OBTURE PAR LE VENTILATEUR | Entry into regional phase | 10.11.2006 | National basic fee paid | 10.11.2006 | Designation fee(s) paid | 10.11.2006 | Examination fee paid | Examination procedure | 25.09.2006 | Amendment by applicant (claims and/or description) | 10.11.2006 | Examination requested [2007/16] | 30.03.2010 | Despatch of a communication from the examining division (Time limit: M04) | 15.09.2010 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 02.11.2010 | Reply to a communication from the examining division | 13.04.2011 | Despatch of a communication from the examining division (Time limit: M06) | 21.10.2011 | Reply to a communication from the examining division | 28.06.2012 | Communication of intention to grant the patent | 10.10.2012 | Fee for grant paid | 10.10.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 30.03.2010 | Opposition(s) | 22.08.2013 | No opposition filed within time limit [2013/44] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 02.11.2010 | Request for further processing filed | 02.11.2010 | Full payment received (date of receipt of payment) Request granted | 29.11.2010 | Decision despatched | Fees paid | Renewal fee | 16.01.2007 | Renewal fee patent year 03 | 16.01.2008 | Renewal fee patent year 04 | 19.01.2009 | Renewal fee patent year 05 | 18.01.2010 | Renewal fee patent year 06 | 14.01.2011 | Renewal fee patent year 07 | 18.01.2012 | Renewal fee patent year 08 | Penalty fee | Penalty fee Rule 85a EPC 1973 | 10.11.2006 | AT   M01   Fee paid on   10.11.2006 | 10.11.2006 | BE   M01   Fee paid on   10.11.2006 | 10.11.2006 | BG   M01   Fee paid on   10.11.2006 | 10.11.2006 | CH   M01   Fee paid on   10.11.2006 | 10.11.2006 | CY   M01   Fee paid on   10.11.2006 | 10.11.2006 | CZ   M01   Fee paid on   10.11.2006 | 10.11.2006 | DE   M01   Fee paid on   10.11.2006 | 10.11.2006 | DK   M01   Fee paid on   10.11.2006 | 10.11.2006 | EE   M01   Fee paid on   10.11.2006 | 10.11.2006 | ES   M01   Fee paid on   10.11.2006 | 10.11.2006 | FI   M01   Fee paid on   10.11.2006 | 10.11.2006 | FR   M01   Fee paid on   10.11.2006 | 10.11.2006 | GB   M01   Fee paid on   10.11.2006 | 10.11.2006 | GR   M01   Fee paid on   10.11.2006 | 10.11.2006 | HU   M01   Fee paid on   10.11.2006 | 10.11.2006 | IE   M01   Fee paid on   10.11.2006 | 10.11.2006 | IS   M01   Fee paid on   10.11.2006 | 10.11.2006 | IT   M01   Fee paid on   10.11.2006 | 10.11.2006 | LT   M01   Fee paid on   10.11.2006 | 10.11.2006 | LU   M01   Fee paid on   10.11.2006 | 10.11.2006 | MC   M01   Fee paid on   10.11.2006 | 10.11.2006 | NL   M01   Fee paid on   10.11.2006 | 10.11.2006 | PL   M01   Fee paid on   10.11.2006 | 10.11.2006 | PT   M01   Fee paid on   10.11.2006 | 10.11.2006 | RO   M01   Fee paid on   10.11.2006 | 10.11.2006 | SE   M01   Fee paid on   10.11.2006 | 10.11.2006 | SI   M01   Fee paid on   10.11.2006 | 10.11.2006 | SK   M01   Fee paid on   10.11.2006 | 10.11.2006 | TR   M01   Fee paid on   10.11.2006 | Penalty fee Rule 85b EPC 1973 | 10.11.2006 | M01   Fee paid on   10.11.2006 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.02.2005 | AT | 21.11.2012 | CY | 21.11.2012 | CZ | 21.11.2012 | DK | 21.11.2012 | EE | 21.11.2012 | FI | 21.11.2012 | IS | 21.11.2012 | IT | 21.11.2012 | LT | 21.11.2012 | NL | 21.11.2012 | PL | 21.11.2012 | RO | 21.11.2012 | SE | 21.11.2012 | SI | 21.11.2012 | SK | 21.11.2012 | TR | 21.11.2012 | BG | 21.02.2013 | GR | 22.02.2013 | GB | 24.02.2013 | IE | 24.02.2013 | LU | 24.02.2013 | BE | 28.02.2013 | CH | 28.02.2013 | LI | 28.02.2013 | MC | 28.02.2013 | ES | 04.03.2013 | PT | 21.03.2013 | [2016/31] |
Former [2015/34] | HU | 24.02.2005 | |
AT | 21.11.2012 | ||
CY | 21.11.2012 | ||
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
TR | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
GB | 24.02.2013 | ||
IE | 24.02.2013 | ||
LU | 24.02.2013 | ||
BE | 28.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2015/32] | AT | 21.11.2012 | |
CY | 21.11.2012 | ||
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
TR | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
GB | 24.02.2013 | ||
IE | 24.02.2013 | ||
BE | 28.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2015/30] | AT | 21.11.2012 | |
CY | 21.11.2012 | ||
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
GB | 24.02.2013 | ||
IE | 24.02.2013 | ||
BE | 28.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2014/09] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
GB | 24.02.2013 | ||
IE | 24.02.2013 | ||
BE | 28.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2014/07] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
IE | 24.02.2013 | ||
BE | 28.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2014/06] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
BE | 28.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/48] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
CH | 28.02.2013 | ||
LI | 28.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/42] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
MC | 28.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/37] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
IT | 21.11.2012 | ||
LT | 21.11.2012 | ||
NL | 21.11.2012 | ||
PL | 21.11.2012 | ||
RO | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/35] | AT | 21.11.2012 | |
CZ | 21.11.2012 | ||
DK | 21.11.2012 | ||
EE | 21.11.2012 | ||
FI | 21.11.2012 | ||
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
SK | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/34] | AT | 21.11.2012 | |
DK | 21.11.2012 | ||
FI | 21.11.2012 | ||
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
BG | 21.02.2013 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/31] | AT | 21.11.2012 | |
FI | 21.11.2012 | ||
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/28] | FI | 21.11.2012 | |
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
PT | 21.03.2013 | ||
Former [2013/26] | FI | 21.11.2012 | |
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
SI | 21.11.2012 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
Former [2013/24] | FI | 21.11.2012 | |
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
GR | 22.02.2013 | ||
ES | 04.03.2013 | ||
Former [2013/23] | FI | 21.11.2012 | |
LT | 21.11.2012 | ||
PL | 21.11.2012 | ||
SE | 21.11.2012 | ||
ES | 04.03.2013 | ||
Former [2013/22] | FI | 21.11.2012 | |
LT | 21.11.2012 | ||
SE | 21.11.2012 | ||
ES | 04.03.2013 | ||
Former [2013/21] | LT | 21.11.2012 | |
SE | 21.11.2012 | ||
Former [2013/20] | LT | 21.11.2012 | Cited in | International search | [X]US5793143 (HARRIS RICHARD KENNETH [US], et al) [X] 1,2,6-9,18 * figures 1,5 *; | [X]EP1122864 (HITACHI LTD [JP]) [X] 1-4,6-10,18 * paragraph [0030]; figures 5,6 *; | [X]EP0779697 (MAGNETI MARELLI MANUFACTURING [IT]) [X] 1-4,8-18 * column 2, line 56; figure 1 *; | [PX]EP1443627 (DELPHI TECH INC [US]) [PX] 1-4,6-18 * figures 2,4 * | by applicant | EP0515259 |