blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1759455

EP1759455 - DISTRIBUTED ACTIVE TRANSFORMER POWER CONTROL TECHNIQUES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.01.2020
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  08.02.2019
FormerGrant of patent is intended
Status updated on  08.10.2018
FormerExamination is in progress
Status updated on  29.11.2017
Most recent event   Tooltip09.07.2021Lapse of the patent in a contracting state
New state(s): HU
published on 11.08.2021  [2021/32]
Applicant(s)For all designated states
Axiom Microdevices, Inc.
7585 Irvine Center Drive, Suite 100
Irvine, CA 92618 / US
[2019/11]
Former [2009/09]For all designated states
Axiom Microdevices, Inc.
7585 Irvine Center Drive, Suite 100
Irvine, CA 92618 / US
Former [2007/10]For all designated states
Axiom Microdevices, Inc.
2100 W. Orangewood Avenue, Suite 205
Orange, CA 92868 / US
Inventor(s)01 / MAGOON, Rahul
26 Santa Victoria Aisle
Irvine, CA 92606 / US
02 / KEE, Scott D.
3 Stonecrest
Dana Point, CA 92629 / US
03 / AOKI, Ichiro
2318 Via Zafiro
San Clemente, CA 92673 / US
04 / CARR, Frank
326 Robinson Drive
Tustin, CA 92782 / US
05 / WU, Hui
9 Colonial Parkway, nr.3
Pittsford, New York 14534 / US
06 / TWOMEY, Jerry
27 Sarteano Drive
Newport Cost, CA 92657 / US
07 / HAJIMIRI, Seyed-Ali
425 San Polo Place
Pasadena, CA 91107 / US
 [2007/24]
Former [2007/10]01 / MAGOON, Rahul
26 Santa Victoria Aisle
Irvine, CA 92606 / US
02 / KEE, Scott D.
3 Stonecrest
Dana Point, CA 92629 / US
03 / AOKI, Ichiro
2318 Via Zafiro
San Clemente, CA 92673 / US
04 / CARR, Frank
326 Robinson Drive
Tustin, CA 92782 / US
05 / WU, Hui
362 South Catalina Drive, 302
Pasadena, CA 91106 / US
06 / TWOMEY, Jerry
27 Sarteano Drive
Newport Cost, CA 92657 / US
07 / HAJIMIRI, Seyed-Ali
425 San Polo Place
Pasadena, CA 91107 / US
Representative(s)Lloyd, Patrick Alexander Desmond
Reddie & Grose LLP The White Chapel Building
10 Whitechapel High Street
London E1 8QS / GB
[2019/11]
Former [2012/12]Lloyd, Patrick Alexander Desmond
Reddie & Grose LLP 16 Theobalds Road
London WC1X 8PL / GB
Former [2007/10]Legg, Cyrus James Grahame, et al
ABEL & IMRAY, 20 Red Lion Street
London WC1R 4PQ / GB
Application number, filing date05731577.231.03.2005
[2007/10]
WO2005US10602
Priority number, dateUS20040558179P31.03.2004         Original published format: US 558179 P
[2007/10]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2005098880
Date:20.10.2005
Language:EN
[2005/42]
Type: A2 Application without search report 
No.:EP1759455
Date:07.03.2007
Language:EN
The application published by WIPO in one of the EPO official languages on 20.10.2005 takes the place of the publication of the European patent application.
[2007/10]
Type: B1 Patent specification 
No.:EP1759455
Date:13.03.2019
Language:EN
[2019/11]
Search report(s)International search report - published on:EP22.12.2005
ClassificationIPC:H03F3/60, H03F3/19, H03F3/26, H03F3/45, H03F1/52, H03G3/00, G01R15/09, G01R21/01, H03G3/30
[2018/43]
CPC:
H03F3/602 (EP,KR,US); G01R15/09 (EP,KR,US); G01R21/01 (EP,KR,US);
H03F1/52 (EP,KR,US); H03F3/19 (EP,KR,US); H03F3/26 (EP,KR,US);
H03F3/45475 (EP,KR,US); H03F3/604 (EP,KR,US); H03F3/605 (EP,KR,US);
H03G3/004 (EP,KR,US); H03G3/3042 (EP,US); H03G3/3047 (EP,US);
H03F2200/435 (EP,US); H03F2200/451 (EP,US); H03F2200/456 (EP,US);
H03F2200/462 (EP,US); H03F2200/471 (EP,US); H03F2200/541 (EP,US) (-)
Former IPC [2007/10]H03F3/60, H01F27/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/11]
Former [2007/10]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:LEISTUNGSREGELTECHNIKEN FÜR VERTEILTE AKTIVE TRANSFORMATOREN[2007/10]
English:DISTRIBUTED ACTIVE TRANSFORMER POWER CONTROL TECHNIQUES[2007/10]
French:TECHNIQUES DE COMMANDE DE PUISSANCE DAT[2007/10]
Entry into regional phase24.10.2006National basic fee paid 
24.10.2006Designation fee(s) paid 
24.10.2006Examination fee paid 
Examination procedure24.10.2006Examination requested  [2007/10]
22.06.2007Despatch of a communication from the examining division (Time limit: M06)
11.02.2008Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
18.04.2008Reply to a communication from the examining division
06.11.2012Despatch of a communication from the examining division (Time limit: M06)
02.05.2013Reply to a communication from the examining division
20.11.2017Despatch of a communication from the examining division (Time limit: M06)
03.05.2018Reply to a communication from the examining division
09.10.2018Communication of intention to grant the patent
31.01.2019Fee for grant paid
31.01.2019Fee for publishing/printing paid
31.01.2019Receipt of the translation of the claim(s)
Divisional application(s)EP10182813.5  / EP2262105
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.06.2007
Opposition(s)16.12.2019No opposition filed within time limit [2020/08]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
18.04.2008Request for further processing filed
18.04.2008Full payment received (date of receipt of payment)
Fees paidRenewal fee
28.03.2007Renewal fee patent year 03
28.03.2008Renewal fee patent year 04
25.03.2009Renewal fee patent year 05
25.03.2010Renewal fee patent year 06
28.03.2011Renewal fee patent year 07
26.03.2012Renewal fee patent year 08
27.03.2013Renewal fee patent year 09
27.03.2014Renewal fee patent year 10
27.03.2015Renewal fee patent year 11
31.03.2016Renewal fee patent year 12
27.03.2017Renewal fee patent year 13
27.03.2018Renewal fee patent year 14
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.03.2005
AT13.03.2019
CY13.03.2019
CZ13.03.2019
DK13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
MC13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SI13.03.2019
SK13.03.2019
TR13.03.2019
BE31.03.2019
CH31.03.2019
IE31.03.2019
LI31.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
[2021/32]
Former [2021/26]AT13.03.2019
CY13.03.2019
CZ13.03.2019
DK13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
MC13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SI13.03.2019
SK13.03.2019
TR13.03.2019
BE31.03.2019
CH31.03.2019
IE31.03.2019
LI31.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
Former [2020/17]AT13.03.2019
CZ13.03.2019
DK13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
MC13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SI13.03.2019
SK13.03.2019
TR13.03.2019
BE31.03.2019
CH31.03.2019
IE31.03.2019
LI31.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
Former [2020/11]AT13.03.2019
CZ13.03.2019
DK13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
MC13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SI13.03.2019
SK13.03.2019
BE31.03.2019
CH31.03.2019
IE31.03.2019
LI31.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
Former [2020/09]AT13.03.2019
CZ13.03.2019
DK13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
MC13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SK13.03.2019
IE31.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
Former [2020/07]AT13.03.2019
CZ13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
MC13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SK13.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
Former [2020/04]AT13.03.2019
CZ13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SK13.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
IS13.07.2019
PT13.07.2019
Former [2020/03]AT13.03.2019
CZ13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SK13.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
PT13.07.2019
Former [2020/01]CZ13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
PL13.03.2019
RO13.03.2019
SE13.03.2019
SK13.03.2019
LU31.03.2019
BG13.06.2019
GR14.06.2019
PT13.07.2019
Former [2019/49]CZ13.03.2019
EE13.03.2019
ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
RO13.03.2019
SE13.03.2019
SK13.03.2019
BG13.06.2019
GR14.06.2019
PT13.07.2019
Former [2019/48]ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
SE13.03.2019
BG13.06.2019
GR14.06.2019
PT13.07.2019
Former [2019/47]ES13.03.2019
FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
SE13.03.2019
BG13.06.2019
GR14.06.2019
Former [2019/46]FI13.03.2019
IT13.03.2019
LT13.03.2019
NL13.03.2019
SE13.03.2019
BG13.06.2019
GR14.06.2019
Former [2019/40]FI13.03.2019
LT13.03.2019
NL13.03.2019
SE13.03.2019
BG13.06.2019
GR14.06.2019
Former [2019/38]FI13.03.2019
LT13.03.2019
SE13.03.2019
BG13.06.2019
GR14.06.2019
Former [2019/37]FI13.03.2019
LT13.03.2019
SE13.03.2019
GR14.06.2019
Former [2019/34]FI13.03.2019
LT13.03.2019
SE13.03.2019
Former [2019/33]FI13.03.2019
LT13.03.2019
Cited inInternational search[XY]US2002135422  (AOKI ICHIRO [US], et al) [X] 1-7 * paragraphs [0054] , [0055] , [0073] , [0076] - [0078]; figures 1b,1d,6,7a,7b * [Y] 8;
 [Y]US5986500  (PARK JONG-TAE [KR], et al) [Y] 8 * column 11, line 55 - column 12, line 2; figures 3,5,6,9,10 * * column 17, line 41 - column 19, line 5 * * column 7, line 31 - column 10, line 52 *;
 [A]WO03079547  (CALIFORNIA INST OF TECHN [US], et al) [A] 1-8 * paragraphs [0046] - [0048]; figure 8 *;
 [A]US2003156003  (SORTOR JOHN E [US]) [A] 1-8 * paragraph [0049]; figure 3 *;
 [A]US5781071  (KUSUNOKI SHIGEO [JP]) [A] 1-8 * column 8, line 56 - column 9, line 34; figures 17,18 *
ExaminationWO2004008630
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.