blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1733205

EP1733205 - METHOD AND SYSTEM FOR DETERMINING THE MASS DENSITY AND DIMENSIONAL CHARACTERISTICS OF AN OBJECT, AND USE THEREOF FOR CONTROLLING NUCLEAR FUEL PELLETS DURING THE PRODUCTION OF THE SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.05.2012
Database last updated on 26.06.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
Bâtiment "Le Ponant D" 25, rue Leblanc
75015 Paris / FR
For all designated states
AREVA NC
33, rue La Fayette
75009 Paris / FR
[2011/27]
Former [2011/20]For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
25, rue Leblanc Bâtiment "Le Ponant D"
75015 Paris / FR
For all designated states
AREVA NC
33, rue La Fayette
75009 Paris / FR
Former [2011/20]For all designated states
Commissariat à l'Énergie Atomique et aux Énergies Alternatives
25, rue Leblanc Bâtiment "Le Ponant D"
75015 Paris / FR
For all designated states
COMPAGNIE GENERALE DES MATIERES NUCLEAIRES
2, rue Paul Dautier
78140 Velizy Villacoublay / FR
Former [2010/18]For all designated states
Commissariat à l'énergie atomique et aux énergies alternatives
Bâtiment D "Le Ponant" 25, rue Leblanc
75015 Paris / FR
For all designated states
COMPAGNIE GENERALE DES MATIERES NUCLEAIRES
2, rue Paul Dautier
78140 Velizy Villacoublay / FR
Former [2006/51]For all designated states
COMMISSARIAT A L'ENERGIE ATOMIQUE
25, rue Leblanc Immeuble "Le Ponant D"
75015 Paris / FR
For all designated states
COMPAGNIE GENERALE DES MATIERES NUCLEAIRES
2, rue Paul Dautier
78140 Velizy Villacoublay / FR
Inventor(s)01 / LYOUSSI, Abdallah
Résidence La Petite Négresse, Bât. B2
04100 Manosque / FR
02 / PAYAN, Emmanuel, Rés. La Petite Négresse
Bât. B2, Montée des Cigales
04100 Manosque / FR
 [2006/51]
Representative(s)Poulin, Gérard, et al
BREVALEX
95, rue d'Amsterdam
75378 Paris Cedex 8 / FR
[N/P]
Former [2009/21]Poulin, Gérard, et al
Brevalex 3, rue du Docteur Lancereaux
75008 Paris / FR
Former [2006/51]Poulin, Gérard, et al
Brevatome 3, rue du Docteur Lancereaux
75008 Paris / FR
Application number, filing date05753642.706.04.2005
[2006/51]
WO2005FR00838
Priority number, dateFR2004005068606.04.2004         Original published format: FR 0450686
[2006/51]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2005100952
Date:27.10.2005
Language:FR
[2005/43]
Type: A1 Application with search report 
No.:EP1733205
Date:20.12.2006
Language:FR
The application published by WIPO in one of the EPO official languages on 27.10.2005 takes the place of the publication of the European patent application.
[2006/51]
Type: B1 Patent specification 
No.:EP1733205
Date:06.07.2011
Language:FR
[2011/27]
Search report(s)International search report - published on:EP27.10.2005
ClassificationIPC:G01N9/24, G21C17/06
[2006/51]
CPC:
G01N9/24 (EP,US); G01N33/0093 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/51]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
LVNot yet paid
MKNot yet paid
YUNot yet paid
TitleGerman:VERFAHREN UND SYSTEM ZUR BESTIMMUNG VON MASSEDICHTE UND ABMESSUNGSMERKMALEN EINES GEGENSTANDS SOWIE DESSEN VERWENDUNG ZUR ÜBERWACHUNG VON KERNBRENNSTOFFPELLETS WÄHREND DEREN HERSTELLUNG[2006/51]
English:METHOD AND SYSTEM FOR DETERMINING THE MASS DENSITY AND DIMENSIONAL CHARACTERISTICS OF AN OBJECT, AND USE THEREOF FOR CONTROLLING NUCLEAR FUEL PELLETS DURING THE PRODUCTION OF THE SAME[2006/51]
French:PROCEDE ET SYSTEME DE DETERMINATION DE LA MASSE VOLUMIQUE ET DES CARACTERISTIQUES DIMENSIONNELLES D'UN OBJET, ET APPLICATION AU CONTROLE DES PASTILLES DE COMBUSTIBLE NUCLEAIRE EN COURS DE FABRICATION[2006/51]
Entry into regional phase28.09.2006National basic fee paid 
28.09.2006Designation fee(s) paid 
28.09.2006Examination fee paid 
Examination procedure28.09.2006Examination requested  [2006/51]
21.02.2011Communication of intention to grant the patent
26.05.2011Fee for grant paid
26.05.2011Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  21.02.2011
Opposition(s)11.04.2012No opposition filed within time limit [2012/24]
Fees paidRenewal fee
23.04.2007Renewal fee patent year 03
22.04.2008Renewal fee patent year 04
23.04.2009Renewal fee patent year 05
26.03.2010Renewal fee patent year 06
21.04.2011Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.04.2005
AT06.07.2011
CY06.07.2011
CZ06.07.2011
DK06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
TR06.07.2011
BG06.10.2011
GR07.10.2011
ES17.10.2011
IS06.11.2011
PT07.11.2011
LU06.04.2012
[2014/34]
Former [2014/27]AT06.07.2011
CY06.07.2011
CZ06.07.2011
DK06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
TR06.07.2011
BG06.10.2011
GR07.10.2011
ES17.10.2011
IS06.11.2011
PT07.11.2011
LU06.04.2012
Former [2014/21]AT06.07.2011
CY06.07.2011
CZ06.07.2011
DK06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
TR06.07.2011
BG06.10.2011
GR07.10.2011
ES17.10.2011
IS06.11.2011
PT07.11.2011
Former [2013/29]AT06.07.2011
CY06.07.2011
CZ06.07.2011
DK06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
BG06.10.2011
GR07.10.2011
ES17.10.2011
IS06.11.2011
PT07.11.2011
Former [2013/22]AT06.07.2011
CY06.07.2011
CZ06.07.2011
DK06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
GR07.10.2011
ES17.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/31]AT06.07.2011
CY06.07.2011
CZ06.07.2011
DK06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/23]AT06.07.2011
CY06.07.2011
CZ06.07.2011
EE06.07.2011
FI06.07.2011
IE06.07.2011
IT06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
RO06.07.2011
SI06.07.2011
SK06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/21]AT06.07.2011
CY06.07.2011
CZ06.07.2011
FI06.07.2011
IE06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
SI06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/20]AT06.07.2011
CY06.07.2011
FI06.07.2011
IE06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
SI06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/12]AT06.07.2011
CY06.07.2011
FI06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
SI06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/11]AT06.07.2011
FI06.07.2011
LT06.07.2011
NL06.07.2011
PL06.07.2011
SI06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/10]FI06.07.2011
LT06.07.2011
NL06.07.2011
SI06.07.2011
GR07.10.2011
IS06.11.2011
PT07.11.2011
Former [2012/09]FI06.07.2011
LT06.07.2011
NL06.07.2011
SI06.07.2011
IS06.11.2011
PT07.11.2011
Former [2012/08]LT06.07.2011
NL06.07.2011
SI06.07.2011
IS06.11.2011
Former [2011/52]SI06.07.2011
Cited inInternational search[A]US4193502  (MARMO ANTHONY R [US]) [A] 1-31 * column 2, line 29 - line 40 * * column 2, line 58 - column 3, line 48 * * figures 1,2 *;
 [A]DE19710835  (BOSCH GMBH ROBERT [DE]) [A] 1-31 * column 1, line 5 - line 30 * * column 1, line 44 - line 65 * * column 2, line 7 - line 19 * * column 2, line 61 - column 3, line 68 * * figure 1 *;
 [A]US6151379  (KULLENBERG RAGNAR [SE], et al) [A] 1-31 * column 2, line 16 - column 3, line 11 * * column 4, line 17 - line 56 * * figures 1,2 *;
 [A]FR2798463  (FRANCO BELGE COMBUSTIBLES [FR]) [A] 1-31* the whole document *;
 [A]  - FWA T F ET AL, "EXPERIMENTAL EVALUATION OF A LABORATORY TWIN-PROBE NUCLEAR GAGE FOR SPECIMEN DENSITY MEASUREMENT", JOURNAL OF TESTING AND EVALUATION, AMERICAN SOCIETY FOR TESTING AND MATERIALS. PHILADELPHIA, US, (199201), vol. 20, no. 1, ISSN 0090-3973, pages 59 - 65, XP000310735 [A] 1-31 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.