EP1787144 - TRANSMITTER LOOPS IN SERIES FOR GEOPHYSICAL SURVEYS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.03.2020 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 05.04.2019 | ||
Former | Grant of patent is intended Status updated on 20.11.2018 | ||
Former | Examination is in progress Status updated on 15.06.2018 | Most recent event Tooltip | 02.07.2021 | Lapse of the patent in a contracting state New state(s): IS | published on 04.08.2021 [2021/31] | Applicant(s) | For all designated states Abitibi-Géophysique 395 avenue Centrale Val-d'Or QC J9P 1P4 / CA | For all designated states Soquem 1000, route de l'Église, bureau 500 Sainte-Foy QC G1V 3V9 / CA | [2019/19] |
Former [2007/21] | For all designated states Abitibi-G Ophysique 395 Avenue Centrale Val -d'Or QC J9P 1P4 / CA | ||
For all designated states Soquem 1000 Route de l'eglise, bureau 500 Sainte-Foy QC G1V 3V9 / CA | Inventor(s) | 01 /
BÉRUBÉ, Pierre 504 Bussière Val-d'Or, Québec J0P 7A4 / CA | 02 /
BOIVIN, Marc 4380 Jérémie Québec, Québec G2C 1B3 / CA | 03 /
MALO-LALANDE, Circé 134 Perreault Val-d'Or, Québec J9P 2G3 / CA | 04 /
PARÉ, Pascal 1440 boulevard Auclair. Sainte-Foy, Québec G2G 2M6 / CA | [2018/51] |
Former [2007/21] | 01 /
B RUB, Pierre 504 Bussière Val-d'Or, Québec J0P 7A4 / CA | ||
02 /
BOIVIN, Marc 4380 Jérémie Québec, Québec G2C 1B3 / CA | |||
03 /
MALO-LALANDE, Circé 134 Perreault Val-d'Or, Québec J9P 2G3 / CA | |||
04 /
PAR, Pascal 1440 boulevard Auclair. Sainte-Foy, Québec G2G 2M6 / CA | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2019/19] |
Former [2007/21] | Domenego, Bertrand, et al Cabinet Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | Application number, filing date | 05784979.6 | 09.09.2005 | [2007/21] | WO2005CA01385 | Priority number, date | US20040937306 | 10.09.2004 Original published format: US 937306 | [2007/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2006026867 | Date: | 16.03.2006 | Language: | EN | [2006/11] | Type: | A1 Application with search report | No.: | EP1787144 | Date: | 23.05.2007 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.03.2006 takes the place of the publication of the European patent application. | [2007/21] | Type: | B1 Patent specification | No.: | EP1787144 | Date: | 08.05.2019 | Language: | EN | [2019/19] | Search report(s) | International search report - published on: | CA | 16.03.2006 | (Supplementary) European search report - dispatched on: | EP | 28.06.2017 | Classification | IPC: | G01V3/10, E21B47/00 | [2017/30] | CPC: |
G01V3/10 (EP,US)
|
Former IPC [2007/21] | G01V3/28, E21B47/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/19] |
Former [2007/21] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | IN REIHE GESCHALTETE SENDERSCHLEIFEN FÜR GEOPHYSIKALISCHE VERMESSUNGEN | [2007/21] | English: | TRANSMITTER LOOPS IN SERIES FOR GEOPHYSICAL SURVEYS | [2007/21] | French: | BOUCLES D'EMISSION EN SERIE POUR ETUDES GEOPHYSIQUES | [2007/21] | Entry into regional phase | 16.03.2007 | National basic fee paid | 16.03.2007 | Search fee paid | 25.05.2007 | Designation fee(s) paid | 16.03.2007 | Examination fee paid | Examination procedure | 16.03.2007 | Examination requested [2007/21] | 11.01.2018 | Amendment by applicant (claims and/or description) | 19.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 27.09.2018 | Reply to a communication from the examining division | 21.11.2018 | Communication of intention to grant the patent | 29.03.2019 | Fee for grant paid | 29.03.2019 | Fee for publishing/printing paid | 29.03.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.06.2018 | Opposition(s) | 11.02.2020 | No opposition filed within time limit [2020/16] | Fees paid | Renewal fee | 16.03.2007 | Renewal fee patent year 03 | 15.09.2008 | Renewal fee patent year 04 | 15.09.2009 | Renewal fee patent year 05 | 15.09.2010 | Renewal fee patent year 06 | 21.09.2011 | Renewal fee patent year 07 | 21.09.2012 | Renewal fee patent year 08 | 25.09.2013 | Renewal fee patent year 09 | 29.09.2014 | Renewal fee patent year 10 | 23.09.2015 | Renewal fee patent year 11 | 27.09.2016 | Renewal fee patent year 12 | 26.09.2017 | Renewal fee patent year 13 | 25.09.2018 | Renewal fee patent year 14 | Penalty fee | Penalty fee Rule 85a EPC 1973 | 25.05.2007 | AT   M01   Fee paid on   25.05.2007 | 25.05.2007 | BE   M01   Fee paid on   25.05.2007 | 25.05.2007 | BG   M01   Fee paid on   25.05.2007 | 25.05.2007 | CH   M01   Fee paid on   25.05.2007 | 25.05.2007 | CY   M01   Fee paid on   25.05.2007 | 25.05.2007 | CZ   M01   Fee paid on   25.05.2007 | 25.05.2007 | DE   M01   Fee paid on   25.05.2007 | 25.05.2007 | DK   M01   Fee paid on   25.05.2007 | 25.05.2007 | EE   M01   Fee paid on   25.05.2007 | 25.05.2007 | ES   M01   Fee paid on   25.05.2007 | 25.05.2007 | FI   M01   Fee paid on   25.05.2007 | 25.05.2007 | FR   M01   Fee paid on   25.05.2007 | 25.05.2007 | GB   M01   Fee paid on   25.05.2007 | 25.05.2007 | GR   M01   Fee paid on   25.05.2007 | 25.05.2007 | HU   M01   Fee paid on   25.05.2007 | 25.05.2007 | IE   M01   Fee paid on   25.05.2007 | 25.05.2007 | IS   M01   Fee paid on   25.05.2007 | 25.05.2007 | IT   M01   Fee paid on   25.05.2007 | 25.05.2007 | LT   M01   Fee paid on   25.05.2007 | 25.05.2007 | LU   M01   Fee paid on   25.05.2007 | 25.05.2007 | LV   M01   Fee paid on   25.05.2007 | 25.05.2007 | MC   M01   Fee paid on   25.05.2007 | 25.05.2007 | NL   M01   Fee paid on   25.05.2007 | 25.05.2007 | PL   M01   Fee paid on   25.05.2007 | 25.05.2007 | PT   M01   Fee paid on   25.05.2007 | 25.05.2007 | RO   M01   Fee paid on   25.05.2007 | 25.05.2007 | SE   M01   Fee paid on   25.05.2007 | 25.05.2007 | SI   M01   Fee paid on   25.05.2007 | 25.05.2007 | SK   M01   Fee paid on   25.05.2007 | 25.05.2007 | TR   M01   Fee paid on   25.05.2007 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 08.05.2019 | CY | 08.05.2019 | CZ | 08.05.2019 | DK | 08.05.2019 | EE | 08.05.2019 | IT | 08.05.2019 | LT | 08.05.2019 | LV | 08.05.2019 | MC | 08.05.2019 | NL | 08.05.2019 | PL | 08.05.2019 | RO | 08.05.2019 | SE | 08.05.2019 | SI | 08.05.2019 | SK | 08.05.2019 | GR | 09.08.2019 | IS | 08.09.2019 | GB | 09.09.2019 | LU | 09.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | FR | 30.09.2019 | LI | 30.09.2019 | [2021/31] |
Former [2021/26] | AT | 08.05.2019 | |
CY | 08.05.2019 | ||
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
GB | 09.09.2019 | ||
LU | 09.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
FR | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/48] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
GB | 09.09.2019 | ||
LU | 09.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
FR | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/38] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
LU | 09.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/35] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
LU | 09.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/34] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
Former [2020/25] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
MC | 08.05.2019 | ||
NL | 08.05.2019 | ||
PL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SI | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
Former [2020/12] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
IT | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
Former [2020/11] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
EE | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
SK | 08.05.2019 | ||
GR | 09.08.2019 | ||
Former [2020/10] | AT | 08.05.2019 | |
CZ | 08.05.2019 | ||
DK | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
RO | 08.05.2019 | ||
SE | 08.05.2019 | ||
GR | 09.08.2019 | ||
Former [2020/09] | CZ | 08.05.2019 | |
DK | 08.05.2019 | ||
LT | 08.05.2019 | ||
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
SE | 08.05.2019 | ||
GR | 09.08.2019 | ||
Former [2019/51] | LT | 08.05.2019 | |
LV | 08.05.2019 | ||
NL | 08.05.2019 | ||
SE | 08.05.2019 | ||
GR | 09.08.2019 | ||
Former [2019/49] | LT | 08.05.2019 | |
NL | 08.05.2019 | ||
SE | 08.05.2019 | ||
Former [2019/47] | LT | 08.05.2019 | Documents cited: | Search | [XI]US2451596 (WHEELER HAROLD A) [X] 1-3,12 * column 1, lines 1-28 * * column 10, line 63 - column 11, line 12 * * figures 1,5 * [I] 4-7,13,14; | [A]US4912414 (LESKY EDWARD S [US], et al) [A] 1-14* the whole document *; | [XI]US2003090424 (BRUNE GUENTER W [US], et al) [X] 1-3,12 * paragraphs [0606] - [0064] * * figure 8b * [I] 4-7,13 | International search | [A]US4859947 (BOSKAMP EDDY B [NL]) |