EP1800193 - METHOD FOR OPERATING A MODULARLY CONSTRUCTED AUTOMATION TECHNOLOGY FIELD DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.05.2010 Database last updated on 03.06.2024 | Most recent event Tooltip | 07.10.2011 | Lapse of the patent in a contracting state New state(s): CY, TR | published on 09.11.2011 [2011/45] | Applicant(s) | For all designated states Endress + Hauser Flowtec AG Kägenstrasse 7 4153 Reinach / CH | [2007/26] | Inventor(s) | 01 /
BORST, Walter Im Wingert 4 65626 Fachingen / DE | 02 /
KOUDAL, Ole Stockmattstrasse 85 CH-5400 Baden / CH | 03 /
SEIFERT, Oliver Dürerstrasse 22 79713 Bad Säckingen / DE | [2007/26] | Representative(s) | Andres, Angelika Maria Endress+Hauser Group Services (Deutschland) AG+Co. KG Colmarer Straße 6 79576 Weil am Rhein / DE | [N/P] |
Former [2007/26] | Andres, Angelika Maria Endress+Hauser (Deutschland) AG+Co. KG PatServe Colmarer Strasse 6 79576 Weil am Rhein / DE | Application number, filing date | 05787208.7 | 16.09.2005 | [2007/26] | WO2005EP54626 | Priority number, date | DE20041049771 | 12.10.2004 Original published format: DE102004049771 | [2007/26] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2006040238 | Date: | 20.04.2006 | Language: | DE | [2006/16] | Type: | A1 Application with search report | No.: | EP1800193 | Date: | 27.06.2007 | Language: | DE | The application published by WIPO in one of the EPO official languages on 20.04.2006 takes the place of the publication of the European patent application. | [2007/26] | Type: | B1 Patent specification | No.: | EP1800193 | Date: | 01.07.2009 | Language: | DE | [2009/27] | Search report(s) | International search report - published on: | EP | 20.04.2006 | Classification | IPC: | G05B19/418 | [2007/26] | CPC: |
G05B19/41845 (EP);
Y02P90/02 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2007/26] | Extension states | AL | Not yet paid | BA | Not yet paid | HR | Not yet paid | MK | Not yet paid | YU | Not yet paid | Title | German: | VERFAHREN ZUM BETREIBEN EINES MODULAR AUFGEBAUTEN FELDGERÄTES DER AUTOMATISIERUNGSTECHNIK | [2007/26] | English: | METHOD FOR OPERATING A MODULARLY CONSTRUCTED AUTOMATION TECHNOLOGY FIELD DEVICE | [2007/26] | French: | PROCEDE D'EXPLOITATION D'UN APPAREIL DE CHAMP, DE STRUCTURE MODULAIRE, RELEVANT DE LA TECHNIQUE DE L'AUTOMATISATION | [2007/26] | Entry into regional phase | 09.03.2007 | National basic fee paid | 09.03.2007 | Designation fee(s) paid | 09.03.2007 | Examination fee paid | Examination procedure | 09.03.2007 | Examination requested [2007/26] | 20.07.2007 | Despatch of a communication from the examining division (Time limit: M04) | 16.11.2007 | Reply to a communication from the examining division | 10.02.2009 | Communication of intention to grant the patent | 02.05.2009 | Fee for grant paid | 02.05.2009 | Fee for publishing/printing paid | Opposition(s) | 06.04.2010 | No opposition filed within time limit [2010/23] | Fees paid | Renewal fee | 13.09.2007 | Renewal fee patent year 03 | 11.09.2008 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 01.07.2009 | CZ | 01.07.2009 | DK | 01.07.2009 | EE | 01.07.2009 | FI | 01.07.2009 | IE | 01.07.2009 | IT | 01.07.2009 | LT | 01.07.2009 | LV | 01.07.2009 | NL | 01.07.2009 | PL | 01.07.2009 | RO | 01.07.2009 | SE | 01.07.2009 | SI | 01.07.2009 | SK | 01.07.2009 | TR | 01.07.2009 | AT | 16.09.2009 | LU | 16.09.2009 | BE | 30.09.2009 | CH | 30.09.2009 | FR | 30.09.2009 | LI | 30.09.2009 | MC | 30.09.2009 | BG | 01.10.2009 | GB | 01.10.2009 | GR | 02.10.2009 | ES | 12.10.2009 | IS | 01.11.2009 | PT | 02.11.2009 | HU | 02.01.2010 | [2011/44] |
Former [2011/32] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
IT | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
AT | 16.09.2009 | ||
LU | 16.09.2009 | ||
BE | 30.09.2009 | ||
CH | 30.09.2009 | ||
FR | 30.09.2009 | ||
LI | 30.09.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
GB | 01.10.2009 | ||
GR | 02.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
HU | 02.01.2010 | ||
Former [2011/22] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
IT | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
AT | 16.09.2009 | ||
LU | 16.09.2009 | ||
BE | 30.09.2009 | ||
CH | 30.09.2009 | ||
FR | 30.09.2009 | ||
LI | 30.09.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
GB | 01.10.2009 | ||
GR | 02.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2011/16] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
IT | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
AT | 16.09.2009 | ||
BE | 30.09.2009 | ||
CH | 30.09.2009 | ||
FR | 30.09.2009 | ||
LI | 30.09.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
GB | 01.10.2009 | ||
GR | 02.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2011/01] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
AT | 16.09.2009 | ||
BE | 30.09.2009 | ||
CH | 30.09.2009 | ||
FR | 30.09.2009 | ||
LI | 30.09.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
GB | 01.10.2009 | ||
GR | 02.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/46] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
BE | 30.09.2009 | ||
CH | 30.09.2009 | ||
FR | 30.09.2009 | ||
LI | 30.09.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
GR | 02.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/40] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
BE | 30.09.2009 | ||
FR | 30.09.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/24] | CZ | 01.07.2009 | |
DK | 01.07.2009 | ||
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
RO | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
SK | 01.07.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/20] | DK | 01.07.2009 | |
EE | 01.07.2009 | ||
FI | 01.07.2009 | ||
IE | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
MC | 30.09.2009 | ||
BG | 01.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/17] | EE | 01.07.2009 | |
FI | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
BG | 01.10.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/16] | EE | 01.07.2009 | |
FI | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
PT | 02.11.2009 | ||
Former [2010/12] | EE | 01.07.2009 | |
FI | 01.07.2009 | ||
LT | 01.07.2009 | ||
LV | 01.07.2009 | ||
NL | 01.07.2009 | ||
PL | 01.07.2009 | ||
SE | 01.07.2009 | ||
SI | 01.07.2009 | ||
ES | 12.10.2009 | ||
IS | 01.11.2009 | ||
Former [2010/01] | SI | 01.07.2009 | Cited in | International search | [DA]EP1093069 (FUJITSU LTD [JP]) [DA] 1 * abstract *; | [A]EP1093039 (FLOWTEC AG [CH]) [A] 1* abstract *; | [A]DE10313389 (ENDRESS & HAUSER PROCESS SOLUT [CH]) [A] 1-8 * paragraphs [0036] - [0049] * |