blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1943095

EP1943095 - COMPOSITE MADE OF LEATHER AND A FURTHER MATERIAL [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  29.10.2010
Database last updated on 03.10.2024
Most recent event   Tooltip29.10.2010Application deemed to be withdrawnpublished on 01.12.2010  [2010/48]
Applicant(s)For all designated states
Azar-Pey, Esfandiar Rahim
Im Winkfeld 11A
65388 Schlangenbad / DE
[2008/29]
Inventor(s)01 / see applicant
...
 [2008/29]
Representative(s)Tostmann, Holger Carl
Wallinger Ricker Schlotter Tostmann
Patent- und Rechtsanwälte Partnerschaft mbB
Zweibrückenstrasse 5-7
80331 München / DE
[N/P]
Former [2008/34]Tostmann, Holger Carl
Wallinger Ricker Schlotter Foerstl Patent- und Rechtsanwälte Zweibrückenstrasse 5-7
80331 Munich / DE
Former [2008/29]Tostmann, Holger Carl
Wallinger Ricker Schlotter Foerstl Patent- und Rechtsanwälte Zweibrückenstrasse 5-7
80331 München / DE
Application number, filing date05802267.411.11.2005
[2008/29]
WO2005EP12117
Priority number, dateDE2005104007824.08.2005         Original published format: DE102005040078
[2008/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2007022795
Date:01.03.2007
Language:EN
[2007/09]
Type: A1 Application with search report 
No.:EP1943095
Date:16.07.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 01.03.2007 takes the place of the publication of the European patent application.
[2008/29]
Search report(s)International search report - published on:EP01.03.2007
ClassificationIPC:B32B9/02
[2008/29]
CPC:
B32B15/20 (EP,US); B32B7/08 (EP,US); B32B7/09 (EP,US);
B32B9/02 (EP,US); B32B9/025 (EP,US); B32B9/041 (EP,US);
B32B9/045 (EP,US); B32B9/047 (EP,US); B32B2255/00 (EP,US);
B32B2255/26 (EP,US); B32B2307/402 (EP,US); B32B2307/54 (EP,US);
B32B2307/712 (EP,US); B32B2451/00 (EP,US); B32B2601/00 (EP,US);
B32B2605/003 (EP,US); B32B2605/08 (EP,US); B32B2605/10 (EP,US);
B32B2605/12 (EP,US); B32B2605/18 (EP,US); Y10T156/10 (EP,US);
Y10T428/31678 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/29]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
YUNot yet paid
TitleGerman:AUS LEDER UND EINEM WEITEREN MATERIAL HERGESTELLTER VERBUNDSTOFF[2008/29]
English:COMPOSITE MADE OF LEATHER AND A FURTHER MATERIAL[2008/29]
French:COMPOSITE CONSTITUE DE CUIR ET D'UN MATERIAU SUPPLEMENTAIRE[2008/29]
Entry into regional phase17.03.2008National basic fee paid 
17.03.2008Designation fee(s) paid 
17.03.2008Examination fee paid 
Examination proceduredeletedCommunication of intention to grant the patent
17.03.2008Examination requested  [2008/29]
08.05.2008Amendment by applicant (claims and/or description)
11.02.2010Despatch of a communication from the examining division (Time limit: M06)
01.06.2010Application deemed to be withdrawn, date of legal effect  [2010/48]
07.07.2010Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2010/48]
Fees paidRenewal fee
17.03.2008Renewal fee patent year 03
31.03.2009Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
30.11.200804   M06   Fee paid on   31.03.2009
30.11.200905   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[X]GB191423746  (MOERNER MARY HELEN MOERNER USU [GB]) [X] 1 * page 2, line 43 - line 44; figure .; claims 1,2 *;
 [X]US2549985  (NORMINGTON JAMES B) [X] 1-9,11 * column 1, paragraph L - column 2, line 7; figure - * * column 3, line 43 - line 71 *;
 [X]GB2238753  (KASEKI LTD [GB]) [X] 1-11 * page 4, line 5 - line 6; claims 1,4,7,8,10,11 * * page 2, line 11 - line 17 * * page 4, paragraph L - page 6, line 18 * * page 1, line 4 - line 10 *;
 [A]WO0071341  (MAGNA EYBL GMBH [AT], et al) [A] 1-11* page 1, paragraph 1; figure .; claims 1,4 *;
 [X]DE10138130  (BASF AG [DE]) [X] 1-11 * column 11, paragraph 68; claims 1,2,4,17,18 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.