blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1946472

EP1946472 - IMPLICIT SIGNALING FOR LINK ADAPTATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.01.2018
Database last updated on 22.05.2024
FormerThe patent has been granted
Status updated on  27.01.2017
FormerGrant of patent is intended
Status updated on  18.01.2017
Most recent event   Tooltip06.03.2020Lapse of the patent in a contracting state
New state(s): TR
published on 08.04.2020  [2020/15]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2017/09]
Former [2008/30]For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
Inventor(s)01 / LARSSON, Peter
Ballonggatan 2 1tr
S-169 71 Solna / SE
 [2008/30]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2017/09]
Former [2011/10]HOFFMANN EITLE
Patent- und Rechtsanwälte Arabellastraße 4
81925 München / DE
Former [2008/30]Kühn, Friedrich Heinrich
Ericsson AB Patent Unit LTE Torshamnsgatan 23
164 80 Stockholm / SE
Application number, filing date05804295.307.11.2005
[2008/30]
WO2005SE01673
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2007053072
Date:10.05.2007
Language:EN
[2007/19]
Type: A1 Application with search report 
No.:EP1946472
Date:23.07.2008
Language:EN
The application published by WIPO in one of the EPO official languages on 10.05.2007 takes the place of the publication of the European patent application.
[2008/30]
Type: B1 Patent specification 
No.:EP1946472
Date:01.03.2017
Language:EN
[2017/09]
Search report(s)International search report - published on:SE10.05.2007
(Supplementary) European search report - dispatched on:EP27.05.2011
ClassificationIPC:H04L1/00, H04L1/16, H04L12/28
[2016/43]
CPC:
H04W28/22 (EP,US); H04L1/0002 (EP,US); H04L1/0015 (EP,US);
H04L1/0032 (EP,US); H04L1/0003 (EP,US); H04L1/0009 (EP,US);
H04L1/16 (EP,US); H04W74/08 (EP,US) (-)
Former IPC [2008/30]H04L1/00, H04L12/28
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2017/09]
Former [2008/30]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
YUNot yet paid
TitleGerman:IMPLIZITE SIGNALISIERUNG ZUR STRECKENANPASSUNG[2008/30]
English:IMPLICIT SIGNALING FOR LINK ADAPTATION[2008/30]
French:SIGNALISATION IMPLICITE POUR ADAPTATION DE LIAISON[2008/30]
Entry into regional phase03.04.2008National basic fee paid 
03.04.2008Search fee paid 
03.04.2008Designation fee(s) paid 
03.04.2008Examination fee paid 
Examination procedure03.04.2008Examination requested  [2008/30]
22.06.2011Despatch of a communication from the examining division (Time limit: M04)
21.10.2011Reply to a communication from the examining division
05.01.2015Despatch of a communication from the examining division (Time limit: M04)
30.04.2015Reply to a communication from the examining division
29.02.2016Despatch of a communication from the examining division (Time limit: M04)
04.07.2016Reply to a communication from the examining division
14.10.2016Communication of intention to grant the patent
13.01.2017Fee for grant paid
13.01.2017Fee for publishing/printing paid
13.01.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.06.2011
Opposition(s)04.12.2017No opposition filed within time limit [2018/06]
Fees paidRenewal fee
03.04.2008Renewal fee patent year 03
25.11.2008Renewal fee patent year 04
25.11.2009Renewal fee patent year 05
24.11.2010Renewal fee patent year 06
23.11.2011Renewal fee patent year 07
26.11.2012Renewal fee patent year 08
27.11.2013Renewal fee patent year 09
26.11.2014Renewal fee patent year 10
30.11.2015Renewal fee patent year 11
28.11.2016Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.11.2005
AT01.03.2017
CY01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
TR01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
IE07.11.2017
LU07.11.2017
BE30.11.2017
CH30.11.2017
FR30.11.2017
LI30.11.2017
[2020/15]
Former [2019/46]HU07.11.2005
AT01.03.2017
CY01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
IE07.11.2017
LU07.11.2017
BE30.11.2017
CH30.11.2017
FR30.11.2017
LI30.11.2017
Former [2019/31]HU07.11.2005
AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
IE07.11.2017
LU07.11.2017
BE30.11.2017
CH30.11.2017
FR30.11.2017
LI30.11.2017
Former [2018/49]AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
IE07.11.2017
LU07.11.2017
BE30.11.2017
CH30.11.2017
FR30.11.2017
LI30.11.2017
Former [2018/45]AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
IE07.11.2017
LU07.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/41]AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
LU07.11.2017
CH30.11.2017
LI30.11.2017
Former [2018/33]AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
MC01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
CH30.11.2017
LI30.11.2017
Former [2018/14]AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SI01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2018/09]AT01.03.2017
CZ01.03.2017
DK01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2017/51]AT01.03.2017
CZ01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
PT03.07.2017
Former [2017/50]AT01.03.2017
CZ01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
PL01.03.2017
RO01.03.2017
SE01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
Former [2017/49]AT01.03.2017
CZ01.03.2017
EE01.03.2017
ES01.03.2017
FI01.03.2017
IT01.03.2017
LT01.03.2017
LV01.03.2017
RO01.03.2017
SE01.03.2017
SK01.03.2017
BG01.06.2017
GR02.06.2017
IS01.07.2017
Former [2017/48]AT01.03.2017
CZ01.03.2017
ES01.03.2017
FI01.03.2017
LT01.03.2017
LV01.03.2017
SE01.03.2017
BG01.06.2017
GR02.06.2017
Former [2017/41]AT01.03.2017
ES01.03.2017
FI01.03.2017
LT01.03.2017
LV01.03.2017
SE01.03.2017
BG01.06.2017
GR02.06.2017
Documents cited:Search[I]US5721725  (WANT ROY [US], et al) [I] 1-31 * column 4, line 22 - column 6, line 4 *;
 [A]US2005047344  (SEOL JEE WOONG [KR]) [A] 1-31* page 3, paragraph 37 - paragraph 40 *;
 [A]  - LI Z ET AL, "Full auto rate MAC protocol for wireless ad hoc networks", IEE PROCEEDINGS : COMMUNICATIONS, INSTITUTION OF ELECTRICAL ENGINEERS, GB, (20050603), vol. 152, no. 3, doi:10.1049/IP-COM:20041022, ISSN 1350-2425, pages 311 - 319, XP006024070 [A] 1-31 * page 312, column l * * page 313, paragraph 3.1 *

DOI:   http://dx.doi.org/10.1049/ip-com:20041022
International search[A]US2005143125  (MALTSEV ALEXANDER A [RU], et al);
 [A]US2005169232  (SAKODA KAZUYUKI [JP], et al)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.