blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1841909

EP1841909 - METHOD FOR TRANSFERRING PORTIONS OF KNITTING PRODUCED BY A GROUP OF NEEDLES TO ANOTHER GROUP OF NEEDLES OF A BED, IN CIRCULAR HOSIERY KNITTING MACHINES WITH TWO BEDS OR THE LIKE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.02.2010
Database last updated on 15.06.2024
Most recent event   Tooltip07.10.2011Lapse of the patent in a contracting state
New state(s): CY
published on 09.11.2011  [2011/45]
Applicant(s)For all designated states
SANTONI S.p.A.
Via C. Fenzi 14
25135 Brescia / IT
[2007/41]
Inventor(s)01 / LONATI, Tiberio
Via Sera, 24
I-25121 Brescia / IT
02 / LONATI, Fausto
Via Mediana, 15
I-25128 Brescia / IT
03 / LONATI, Ettore
Via Sott'acqua, 32
I-25080 Botticino / IT
 [2007/41]
Representative(s)Alagem Modiano, Lara S., et al
Dr. Modiano & Associati SpA
Via Meravigli 16
20123 Milano / IT
[N/P]
Former [2007/41]Alagem Modiano, Lara S., et al
Modiano & Associati Via Meravigli, 16
20123 Milano / IT
Application number, filing date05818468.012.12.2005
[2007/41]
WO2005EP13318
Priority number, dateIT2004MI0249523.12.2004         Original published format: IT MI20042495
[2007/41]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2006066750
Date:29.06.2006
Language:EN
[2006/26]
Type: A1 Application with search report 
No.:EP1841909
Date:10.10.2007
Language:EN
The application published by WIPO in one of the EPO official languages on 29.06.2006 takes the place of the publication of the European patent application.
[2007/41]
Type: B1 Patent specification 
No.:EP1841909
Date:08.04.2009
Language:EN
[2009/15]
Search report(s)International search report - published on:EP29.06.2006
ClassificationIPC:D04B9/06, D04B15/02
[2007/41]
CPC:
D04B9/06 (EP,KR,US); D04B15/02 (EP,KR,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/41]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
YUNot yet paid
TitleGerman:VERFAHREN ZUR MASCHENÜBERTRAGUNG VON EINER NADELGRUPPE AUF EINE ANDERE IM BETT ZUR ANWENDUNG BEI RUNDSTRICKMASCHINEN MIT ZWEI BETTEN ODER DERGLEICHEN[2007/41]
English:METHOD FOR TRANSFERRING PORTIONS OF KNITTING PRODUCED BY A GROUP OF NEEDLES TO ANOTHER GROUP OF NEEDLES OF A BED, IN CIRCULAR HOSIERY KNITTING MACHINES WITH TWO BEDS OR THE LIKE[2007/41]
French:PROCEDE DE TRANSFERT DE PORTIONS DE TRICOT PRODUITES PAR UN GROUPE D'AIGUILLES VERS UN AUTRE GROUPE D'AIGUILLES D'UNE FONTURE, SUR DES MACHINES A TRICOTER CIRCULAIRES POUR CHAUSSETTES ET BAS A DEUX FONTURES OU SIMILAIRES[2007/41]
Entry into regional phase04.06.2007National basic fee paid 
04.06.2007Designation fee(s) paid 
04.06.2007Examination fee paid 
Examination procedure04.06.2007Examination requested  [2007/41]
28.01.2008Despatch of a communication from the examining division (Time limit: M04)
12.05.2008Reply to a communication from the examining division
20.10.2008Communication of intention to grant the patent
17.02.2009Fee for grant paid
17.02.2009Fee for publishing/printing paid
Opposition(s)11.01.2010No opposition filed within time limit [2010/11]
Fees paidRenewal fee
23.11.2007Renewal fee patent year 03
26.11.2008Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT08.04.2009
BE08.04.2009
CY08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
BG08.07.2009
SE08.07.2009
GR09.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
HU09.10.2009
GB12.12.2009
IE12.12.2009
LU12.12.2009
CH31.12.2009
FR31.12.2009
LI31.12.2009
[2011/45]
Former [2011/32]AT08.04.2009
BE08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
BG08.07.2009
SE08.07.2009
GR09.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
HU09.10.2009
GB12.12.2009
IE12.12.2009
LU12.12.2009
CH31.12.2009
FR31.12.2009
LI31.12.2009
Former [2011/22]AT08.04.2009
BE08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
BG08.07.2009
SE08.07.2009
GR09.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
GB12.12.2009
IE12.12.2009
LU12.12.2009
CH31.12.2009
FR31.12.2009
LI31.12.2009
Former [2011/05]AT08.04.2009
BE08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
BG08.07.2009
SE08.07.2009
GR09.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
GB12.12.2009
IE12.12.2009
CH31.12.2009
FR31.12.2009
LI31.12.2009
Former [2011/02]AT08.04.2009
BE08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
BG08.07.2009
SE08.07.2009
GR09.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
IE12.12.2009
CH31.12.2009
FR31.12.2009
LI31.12.2009
Former [2010/18]AT08.04.2009
BE08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
BG08.07.2009
SE08.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
Former [2010/13]AT08.04.2009
BE08.04.2009
DK08.04.2009
EE08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
RO08.04.2009
SI08.04.2009
SK08.04.2009
SE08.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
Former [2010/01]AT08.04.2009
FI08.04.2009
LT08.04.2009
LV08.04.2009
NL08.04.2009
PL08.04.2009
SI08.04.2009
SE08.07.2009
ES19.07.2009
IS08.08.2009
PT08.09.2009
Cited inInternational search[A]US3340706  (CURRIER JOHN A) [A] 1 * column 1, line 41 - line 71 * * column 8, line 23 - line 48 * * column 9, line 64 - column 10, line 32; figure .; claims 1,2 *;
 [A]US3685321  (MILLAR JOHN J) [A] 1 * column 7, line 45 - column 8, line 3; figures 3-5 *;
 [A]US4047401  (NURK SIEGFRIED) [A] 1 * figure .; claim 1 *;
 [X]GB2187765  (ELITEX ZAVODY TEXTILNIHO) [X] 5 * the whole document *;
 [A]EP0893526  (LONATI SPA [IT]) [A] 5* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.