EP1828858 - CONTROL SYSTEM WITH A PLURALITY OF SPATIALLY DISTRIBUTED STATIONS AND METHOD FOR TRANSMITTING DATA IN SAID CONTROL SYSTEM [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 11.01.2019 Database last updated on 11.05.2024 | |
Former | Grant of patent is intended Status updated on 15.07.2018 | ||
Former | Examination is in progress Status updated on 05.05.2017 | Most recent event Tooltip | 15.03.2024 | New entry: Decision (+date) in appeal procedure | Applicant(s) | For all designated states Pilz GmbH & Co. KG Felix-Wankel-Strasse 2 73760 Ostfildern / DE | [2007/36] | Inventor(s) | 01 /
SCHWENKEL, Hans Saumweg 15 70192 Stuttgart / DE | 02 /
WOHNHAAS, Klaus Meissner Strasse 12 70736 Fellbach / DE | 03 /
SPERRER, Reinhard Rinnenbachstrasse 16/2 73760 Ostfildern / DE | 04 /
HOLZAEPFEL, Matthias Eilfingerweg 3 70329 Stuttgart / DE | 05 /
RUPP, Roland Uhlandstrasse 63 73110 Hattenhofen / DE | [2007/36] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Postfach 10 54 62 70047 Stuttgart / DE | [2019/07] |
Former [2007/36] | Duhme, Torsten, et al Witte, Weller & Partner, Patentanwälte, Postfach 10 54 62 70047 Stuttgart / DE | Application number, filing date | 05823020.2 | 21.12.2005 | [2007/36] | WO2005EP13764 | Priority number, date | DE20041063213 | 24.12.2004 Original published format: DE102004063213 | DE20041063584 | 27.12.2004 Original published format: DE102004063584 | [2007/36] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2006069691 | Date: | 06.07.2006 | Language: | DE | [2006/27] | Type: | A1 Application with search report | No.: | EP1828858 | Date: | 05.09.2007 | Language: | DE | The application published by WIPO in one of the EPO official languages on 06.07.2006 takes the place of the publication of the European patent application. | [2007/36] | Type: | B1 Patent specification | No.: | EP1828858 | Date: | 13.02.2019 | Language: | DE | [2019/07] | Search report(s) | International search report - published on: | EP | 06.07.2006 | Classification | IPC: | G05B19/042, G05B19/418 | [2018/30] | CPC: |
G05B19/4185 (EP,US);
G05B19/042 (EP,US);
G05B2219/21039 (EP,US);
G05B2219/31137 (EP,US);
G05B2219/31145 (EP,US);
Y02P90/02 (EP,US)
|
Former IPC [2007/36] | G05B19/042 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/07] |
Former [2007/36] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | STEUERUNGSSYSTEM MIT EINER VIELZAHL VON RÄUMLICH VERTEILTEN STATIONEN SOWIE VERFAHREN ZUM ÜBERTRAGEN VON DATEN IN EINEM SOLCHEN STEUERUNGSSYSTEM | [2018/33] | English: | CONTROL SYSTEM WITH A PLURALITY OF SPATIALLY DISTRIBUTED STATIONS AND METHOD FOR TRANSMITTING DATA IN SAID CONTROL SYSTEM | [2007/36] | French: | SYSTEME DE COMMANDE COMPORTANT UNE PLURALITE DE STATIONS SPATIALEMENT DISTRIBUEES ET PROCEDE DE TRANSMISSION DE DONNEES DANS UN TEL SYSTEME DE COMMANDE | [2007/36] |
Former [2007/36] | STEUERUNGSSYSTEM MIT EINER VIELZAHL VON R[UMLICH VERTEILTEN STATIONEN SOWIE VERFAHREN ZUM ]BERTRAGEN VON DATEN IN EINEM SOLCHEN STEUERUNGSSYSTEM | Entry into regional phase | 13.06.2007 | National basic fee paid | 13.06.2007 | Designation fee(s) paid | 13.06.2007 | Examination fee paid | Examination procedure | 13.06.2007 | Examination requested [2007/36] | 09.05.2012 | Despatch of a communication from the examining division (Time limit: M06) | 19.11.2012 | Reply to a communication from the examining division | 25.04.2017 | Despatch of a communication from the examining division (Time limit: M06) | 06.11.2017 | Reply to a communication from the examining division | 16.07.2018 | Communication of intention to grant the patent | 19.11.2018 | Fee for grant paid | 19.11.2018 | Fee for publishing/printing paid | 19.11.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 09.05.2012 | Opposition(s) | Opponent(s) | 01
12.11.2019
14.11.2019
ADMISSIBLE Phoenix Contact GmbH & Co. KG Flachsmarktstrasse 8 32825 Blomberg / DE Opponent's representative Blumbach · Zinngrebe Patentanwälte PartG mbB Alexandrastraße 5 65187 Wiesbaden / DE | [2019/51] | deleted | Deletion: Legal effect of rejection of opposition [ N /P ] | 27.11.2019 | Invitation to proprietor to file observations on the notice of opposition | 07.04.2020 | Reply of patent proprietor to notice(s) of opposition | 13.10.2021 | Date of oral proceedings | 07.03.2022 | Despatch of minutes of oral proceedings | 07.03.2022 | Date of despatch of rejection of opposition | Appeal following opposition | 06.05.2022 | Appeal received No. T1135/22 | 06.05.2022 | Payment of appeal fee | 06.07.2022 | Statement of grounds filed | 08.03.2024 | Result of appeal procedure: continuation of opposition procedure | 15.04.2024 | Despatch of the decision of the Board of Appeal | 08.03.2024 | Date of oral proceedings | Fees paid | Renewal fee | 13.06.2007 | Renewal fee patent year 03 | 20.12.2008 | Renewal fee patent year 04 | 22.12.2009 | Renewal fee patent year 05 | 22.12.2010 | Renewal fee patent year 06 | 20.12.2011 | Renewal fee patent year 07 | 20.12.2012 | Renewal fee patent year 08 | 18.12.2013 | Renewal fee patent year 09 | 17.12.2014 | Renewal fee patent year 10 | 16.12.2015 | Renewal fee patent year 11 | 21.12.2016 | Renewal fee patent year 12 | 20.12.2017 | Renewal fee patent year 13 | 21.12.2018 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2005 | CY | 13.02.2019 | CZ | 13.02.2019 | DK | 13.02.2019 | EE | 13.02.2019 | ES | 13.02.2019 | FI | 13.02.2019 | LT | 13.02.2019 | LV | 13.02.2019 | MC | 13.02.2019 | NL | 13.02.2019 | PL | 13.02.2019 | RO | 13.02.2019 | SE | 13.02.2019 | SI | 13.02.2019 | SK | 13.02.2019 | TR | 13.02.2019 | BG | 13.05.2019 | GR | 14.05.2019 | IS | 13.06.2019 | PT | 13.06.2019 | GB | 21.12.2019 | IE | 21.12.2019 | LU | 21.12.2019 | BE | 31.12.2019 | AT | 21.12.2022 | [2023/48] |
Former [2021/32] | HU | 21.12.2005 | |
CY | 13.02.2019 | ||
CZ | 13.02.2019 | ||
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
MC | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
GB | 21.12.2019 | ||
IE | 21.12.2019 | ||
LU | 21.12.2019 | ||
BE | 31.12.2019 | ||
Former [2021/26] | CY | 13.02.2019 | |
CZ | 13.02.2019 | ||
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
MC | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
GB | 21.12.2019 | ||
IE | 21.12.2019 | ||
LU | 21.12.2019 | ||
BE | 31.12.2019 | ||
Former [2020/51] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
MC | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
GB | 21.12.2019 | ||
IE | 21.12.2019 | ||
LU | 21.12.2019 | ||
BE | 31.12.2019 | ||
Former [2020/48] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
MC | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
GB | 21.12.2019 | ||
IE | 21.12.2019 | ||
LU | 21.12.2019 | ||
Former [2020/46] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
MC | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
IE | 21.12.2019 | ||
LU | 21.12.2019 | ||
Former [2020/39] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
MC | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2020/17] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
TR | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2020/13] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SI | 13.02.2019 | ||
SK | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2020/01] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
PL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SK | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2019/49] | CZ | 13.02.2019 | |
DK | 13.02.2019 | ||
EE | 13.02.2019 | ||
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
RO | 13.02.2019 | ||
SE | 13.02.2019 | ||
SK | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2019/48] | DK | 13.02.2019 | |
ES | 13.02.2019 | ||
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
SE | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2019/47] | ES | 13.02.2019 | |
FI | 13.02.2019 | ||
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
SE | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2019/39] | FI | 13.02.2019 | |
LT | 13.02.2019 | ||
LV | 13.02.2019 | ||
NL | 13.02.2019 | ||
SE | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
IS | 13.06.2019 | ||
PT | 13.06.2019 | ||
Former [2019/38] | FI | 13.02.2019 | |
LT | 13.02.2019 | ||
NL | 13.02.2019 | ||
SE | 13.02.2019 | ||
BG | 13.05.2019 | ||
GR | 14.05.2019 | ||
PT | 13.06.2019 | ||
Former [2019/37] | FI | 13.02.2019 | |
LT | 13.02.2019 | ||
NL | 13.02.2019 | ||
SE | 13.02.2019 | ||
GR | 14.05.2019 | ||
PT | 13.06.2019 | ||
Former [2019/34] | FI | 13.02.2019 | |
LT | 13.02.2019 | ||
NL | 13.02.2019 | ||
SE | 13.02.2019 | ||
PT | 13.06.2019 | ||
Former [2019/33] | FI | 13.02.2019 | |
LT | 13.02.2019 | ||
PT | 13.06.2019 | Cited in | International search | [A]WO03054644 (ELEKTRO BECKHOFF GMBH UNTERNEH [DE], et al) [A] 1-18 * page 5, line 10 - page 6, line 8 * * page 12, line 5 - page 18, line 13; figures 3-5; claims 1,7 *; | [A]WO2004071025 (ELEKTRO BECKHOFF GMBH [DE], et al) [A] 1-18 * page 4, line 26 - page 5, line 15 * * page 6, line 34 - page 7, line 11 * * page 9, line 8 - page 11, line 18 * * page 12, line 29 - page 14, line 17; figures 1-4; claims 1,6 *; | [AD]DE19934514 (PILZ GMBH & CO [DE]) [AD] 1,15-18 * the whole document *; | [A]EP1075110 (PHOENIX CONTACT GMBH & CO [DE]) [A] 1 * the whole document *; | [A]DE19851245 (PHOENIX CONTACT GMBH & CO [DE]) [A] 1 * the whole document * | by applicant | DE19934514 | WO03054644 | Opposition | DE19934514 | - "Anwenderhandbuch INTERBUS-Protokoll- Chip IBS SUPI 3", PHOENIX CONTACT, (20090900), pages 1-1 - 1-32, XP055655011 | - BAGINSKI, ALFREDE et al., "1 Serielle Datenübertragungsprotokolle", INTERBUS Grundlagen und Praxis, (19980000), pages 6 - 50, ISBN 3-7785-2471-2, XP055655091 | - Schwager, "Ethernet erreicht das Feld Sechs Echtzeit-varianten im Vergleich - Teil 1", Elektronik, (20040000), pages 48 - 50, 52-54, XP055655205 | - Schwager J, "Ethernet erreicht das Feld", Elektronik, (20040000), pages 38 - 43, XP055655209 |