blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1724977

EP1724977 - Method and apparatus of data segmentation in a mobile communications system [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.09.2012
Database last updated on 15.06.2024
Most recent event   Tooltip18.07.2014Lapse of the patent in a contracting state
New state(s): HU
published on 20.08.2014  [2014/34]
Applicant(s)For all designated states
Innovative Sonic Limited
Offshore incorporations centre Road Town P.O. Box 957
Tortola / VG
[2007/04]
Former [2006/47]For all designated states
ASUSTeK Computer Inc.
4F, No. 150, Li-Te Rd. Peitou
Taipei City / TW
Inventor(s)01 / Jiang, Sam Shiaw-Shiang
c/o ASUSTeK COMPUTER INC.
4F, No. 150, Li-Te Rd.
Peitou Taipei City Taiwan / CN
 [2011/44]
Former [2006/47]01 / Jiang, Sam Shiaw-Shiang
c/o ASUSTeK COMPUTER INC. 4F, No. 150, Li-Te Rd.
Peitou Taipei City Taiwan / CN
Representative(s)Görz, Ingo
Hoefer & Partner
Patentanwälte
Pilgersheimer Strasse 20
81543 München / DE
[N/P]
Former [2011/44]Görz, Ingo
Hoefer & Partner Patentanwälte Pilgersheimer Strasse 20
81543 München / DE
Former [2006/47]Görz, Ingo
Hoefer & Partner Patentanwälte Gabriel-Max-Strasse 29
81545 München / DE
Application number, filing date06010254.818.05.2006
[2006/47]
Priority number, dateUS20050594921P18.05.2005         Original published format: US 594921 P
[2006/47]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1724977
Date:22.11.2006
Language:EN
[2006/47]
Type: A3 Search report 
No.:EP1724977
Date:01.09.2010
[2010/35]
Type: B1 Patent specification 
No.:EP1724977
Date:02.11.2011
Language:EN
[2011/44]
Search report(s)(Supplementary) European search report - dispatched on:EP30.07.2010
ClassificationIPC:H04W28/06
[2011/18]
CPC:
H04W28/06 (EP,US); H04L65/00 (KR); G06F15/00 (KR);
H04L1/0079 (EP,US); H04L9/40 (KR); H04W4/18 (KR);
H04W48/08 (EP,US); H04W80/00 (EP,US) (-)
Former IPC [2006/47]H04L12/56
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2006/47]
TitleGerman:Verfahren und Vorrichtung zur Datensegmentierung in einem Mobilfunksystem[2011/19]
English:Method and apparatus of data segmentation in a mobile communications system[2006/47]
French:Méthode et dispositif pour la segmentation de données dans un système de communication mobile[2006/47]
Former [2006/47]Verfahren und Anlage zur Datensegmentierung in einem Mobilkommunikationssystem
Examination procedure18.05.2006Examination requested  [2006/47]
28.06.2011Communication of intention to grant the patent
21.09.2011Fee for grant paid
21.09.2011Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.06.2011
Opposition(s)03.08.2012No opposition filed within time limit [2012/41]
Fees paidRenewal fee
28.05.2008Renewal fee patent year 03
28.05.2009Renewal fee patent year 04
28.05.2010Renewal fee patent year 05
31.05.2011Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.05.2006
AT02.11.2011
BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SI02.11.2011
SK02.11.2011
TR02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
IE18.05.2012
LU18.05.2012
CH31.05.2012
LI31.05.2012
MC31.05.2012
[2014/34]
Former [2014/27]AT02.11.2011
BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SI02.11.2011
SK02.11.2011
TR02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
IE18.05.2012
LU18.05.2012
CH31.05.2012
LI31.05.2012
MC31.05.2012
Former [2014/21]AT02.11.2011
BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SI02.11.2011
SK02.11.2011
TR02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
IE18.05.2012
CH31.05.2012
LI31.05.2012
MC31.05.2012
Former [2014/01]AT02.11.2011
BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SI02.11.2011
SK02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
IE18.05.2012
CH31.05.2012
LI31.05.2012
MC31.05.2012
Former [2013/20]AT02.11.2011
BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SE02.11.2011
SI02.11.2011
SK02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
IE18.05.2012
CH31.05.2012
LI31.05.2012
MC31.05.2012
Former [2013/07]AT02.11.2011
BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SE02.11.2011
SI02.11.2011
SK02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
CH31.05.2012
LI31.05.2012
MC31.05.2012
Former [2013/03]BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SE02.11.2011
SI02.11.2011
SK02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
MC31.05.2012
Former [2012/36]BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
RO02.11.2011
SE02.11.2011
SI02.11.2011
SK02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/35]BE02.11.2011
CY02.11.2011
CZ02.11.2011
DK02.11.2011
EE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
SE02.11.2011
SI02.11.2011
BG02.02.2012
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/34]BE02.11.2011
CY02.11.2011
CZ02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
SE02.11.2011
SI02.11.2011
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/28]BE02.11.2011
CY02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
SE02.11.2011
SI02.11.2011
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/26]BE02.11.2011
LT02.11.2011
LV02.11.2011
PL02.11.2011
SE02.11.2011
SI02.11.2011
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/25]BE02.11.2011
LT02.11.2011
LV02.11.2011
SE02.11.2011
SI02.11.2011
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/24]LT02.11.2011
LV02.11.2011
SE02.11.2011
SI02.11.2011
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/23]LT02.11.2011
GR03.02.2012
IS02.03.2012
PT02.03.2012
Former [2012/21]LT02.11.2011
IS02.03.2012
Former [2012/20]LT02.11.2011
Documents cited:Search[A]EP1180878  (LG ELECTRONICS INC [KR]) [A] 1-14 * paragraph [0042] - paragraph [0056]; figure 7 *;
 [A]  - "Segmentation and Concatenation for VoIMS", 3GPP DRAFT; R2-051311_VOIP_FRAMING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20050504), vol. RAN WG2, no. Athens, Greece; 20050504, XP050128525 [A] 1-14 * paragraph [0002] - paragraph [0003] *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.