blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1742076

EP1742076 - Method of testing active electrical components [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.02.2020
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  15.03.2019
FormerGrant of patent is intended
Status updated on  15.11.2018
FormerExamination is in progress
Status updated on  01.06.2018
Most recent event   Tooltip16.07.2021Lapse of the patent in a contracting state
New state(s): HU
published on 18.08.2021  [2021/33]
Applicant(s)For all designated states
ROBERT BOSCH GMBH
Postfach 30 02 20
70442 Stuttgart / DE
[2007/02]
Inventor(s)01 / Garcia, Felipe Cuenca
Rosenweg 1
35099 Burgwald / DE
 [2007/02]
Application number, filing date06013305.528.06.2006
[2007/02]
Priority number, dateDE2005103179507.07.2005         Original published format: DE102005031795
[2007/02]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP1742076
Date:10.01.2007
Language:DE
[2007/02]
Type: A3 Search report 
No.:EP1742076
Date:09.07.2008
[2008/28]
Type: B1 Patent specification 
No.:EP1742076
Date:17.04.2019
Language:DE
[2019/16]
Search report(s)(Supplementary) European search report - dispatched on:EP05.06.2008
ClassificationIPC:G01R31/02, G01R31/327, G01R31/28, G01D3/08
[2008/28]
CPC:
G01D3/08 (EP,US); G01R31/2829 (EP); G01R31/2836 (EP);
G01R31/50 (EP,US); G01R31/52 (EP,US)
Former IPC [2007/02]G01R31/327
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/07]
Former [2007/02]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Verfahren zum Prüfen von aktiven elektrotechnischen Komponenten[2007/02]
English:Method of testing active electrical components[2007/02]
French:Procédé de vérification de composants électrotechniques actifs[2007/02]
Examination procedure23.08.2008Amendment by applicant (claims and/or description)
09.01.2009Examination requested  [2009/09]
06.02.2013Despatch of a communication from the examining division (Time limit: M04)
06.06.2013Reply to a communication from the examining division
23.05.2018Despatch of a communication from the examining division (Time limit: M04)
12.09.2018Reply to a communication from the examining division
16.11.2018Communication of intention to grant the patent
05.03.2019Fee for grant paid
05.03.2019Fee for publishing/printing paid
05.03.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  06.02.2013
Opposition(s)20.01.2020No opposition filed within time limit [2020/13]
Fees paidRenewal fee
30.06.2008Renewal fee patent year 03
30.06.2009Renewal fee patent year 04
30.06.2010Renewal fee patent year 05
30.06.2011Renewal fee patent year 06
02.07.2012Renewal fee patent year 07
01.07.2013Renewal fee patent year 08
30.06.2014Renewal fee patent year 09
30.06.2015Renewal fee patent year 10
30.06.2016Renewal fee patent year 11
30.06.2017Renewal fee patent year 12
02.07.2018Renewal fee patent year 13
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.06.2006
CY17.04.2019
CZ17.04.2019
DK17.04.2019
EE17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
SI17.04.2019
SK17.04.2019
TR17.04.2019
IE28.06.2019
LU28.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
[2021/33]
Former [2021/26]CY17.04.2019
CZ17.04.2019
DK17.04.2019
EE17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
SI17.04.2019
SK17.04.2019
TR17.04.2019
IE28.06.2019
LU28.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/25]CZ17.04.2019
DK17.04.2019
EE17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
SI17.04.2019
SK17.04.2019
TR17.04.2019
IE28.06.2019
LU28.06.2019
BE30.06.2019
CH30.06.2019
LI30.06.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/21]CZ17.04.2019
DK17.04.2019
EE17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
SK17.04.2019
TR17.04.2019
IE28.06.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/17]CZ17.04.2019
DK17.04.2019
EE17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
SK17.04.2019
TR17.04.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/11]CZ17.04.2019
DK17.04.2019
EE17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
SK17.04.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/10]CZ17.04.2019
DK17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
RO17.04.2019
SE17.04.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/09]CZ17.04.2019
DK17.04.2019
ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
MC17.04.2019
NL17.04.2019
PL17.04.2019
SE17.04.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2020/04]ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
NL17.04.2019
PL17.04.2019
SE17.04.2019
BG17.07.2019
GR18.07.2019
IS17.08.2019
PT19.08.2019
Former [2019/52]ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
NL17.04.2019
PL17.04.2019
SE17.04.2019
BG17.07.2019
GR18.07.2019
PT19.08.2019
Former [2019/51]ES17.04.2019
FI17.04.2019
LT17.04.2019
LV17.04.2019
NL17.04.2019
SE17.04.2019
BG17.07.2019
GR18.07.2019
PT19.08.2019
Former [2019/48]ES17.04.2019
FI17.04.2019
LT17.04.2019
NL17.04.2019
SE17.04.2019
PT19.08.2019
Former [2019/47]ES17.04.2019
FI17.04.2019
LT17.04.2019
NL17.04.2019
Former [2019/44]NL17.04.2019
Documents cited:Search[A]WO9113365  (BOSCH GMBH ROBERT [DE]) [A] 1 * the whole document *;
 [DA]DE19922818  (NOKIA MOBILE PHONES LTD [FI]) [DA] 1* abstract *;
 [A]DE10155847  (BOSCH GMBH ROBERT [DE]) [A] 1 * paragraph [0017] - paragraph [0028]; figure 2 *
ExaminationDE10062333
by applicantDE3741901
 DE19922818
 DE10155847
 DE10339805
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.