blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1796118

EP1796118 - Load connecting block [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  06.06.2008
Database last updated on 24.08.2024
Most recent event   Tooltip06.06.2008Application deemed to be withdrawnpublished on 09.07.2008  [2008/28]
Applicant(s)For all designated states
WEBER AG
Elektrotechnik Sedelstraße 2
6021 Emmenbrücke / CH
[2007/24]
Inventor(s)01 / Grübel, Edwin
Meierenaustrasse 47
9443 Widnau / CH
02 / Lichtensteiger, Markus
Wattenauweg 20
9462 Montlingen / CH
03 / Arnold, Urs
Sonnmattstrasse 5
6210 Sursee / CH
04 / Müller, Wolfgang, J.
Feldgasse 3
6890 Lustenau / AT
 [2007/24]
Representative(s)Riebling, Peter
Patentanwalt
Postfach 31 60
88113 Lindau / DE
[N/P]
Former [2007/24]Riebling, Peter
Patentanwalt Postfach 31 60
88113 Lindau / DE
Application number, filing date06023998.520.11.2006
[2007/24]
Priority number, dateDE2005105884909.12.2005         Original published format: DE102005058849
[2007/24]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP1796118
Date:13.06.2007
Language:DE
[2007/24]
Search report(s)(Supplementary) European search report - dispatched on:EP19.02.2007
ClassificationIPC:H01H31/12, H01H21/16
[2007/24]
CPC:
H01H31/122 (EP); H01H21/165 (EP)
Designated contracting states[2008/08]
Former [2007/24]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:NH-Lastschaltleiste[2007/24]
English:Load connecting block[2007/24]
French:Coupe-circuit électrique[2007/24]
Examination procedure14.12.2007Application deemed to be withdrawn, date of legal effect  [2008/28]
13.02.2008Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2008/28]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]DE29622551U  (SCHNEIDER SCHALTGERAETEBAU UND [AT]) [A] 1* page 5; figure 1 *;
 [A]EP1246213  (EFEN GMBH [DE]) [A] 1 * paragraphs [0040] - [0051]; figures 1-5 *;
 [A]EP1585156  (APATOR SA [PL]) [A] 1 * paragraphs [0035] - [0040]; figures 1,9-11 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.