blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1798997

EP1798997 - Method, apparatus and system for implementing luUP/NBUP procedure control [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  31.12.2010
Database last updated on 24.07.2024
Most recent event   Tooltip19.10.2012Lapse of the patent in a contracting state
New state(s): TR
published on 21.11.2012  [2012/47]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[N/P]
Former [2007/25]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building, Bantian Longgang District Shenzhen
Guangdong 518129 / CN
Inventor(s)01 / Xiang, Fei, c/o Harbour Networks P&D Center
Blg. 17, ZhongGuanCun Software Park,8 Dongbeiwang
West Road, HaiDian District Beijing / CN
 [2007/25]
Representative(s)Körber, Martin Hans, et al
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Postfach 33 06 09
80066 München / DE
[N/P]
Former [2009/22]Körber, Martin Hans, et al
Mitscherlich & Partner Patent- und Rechtsanwälte Postfach 33 06 09
80066 München / DE
Former [2007/25]Dilg, Andreas
Maiwald Patentanwalts GmbH, Elisenhof, Elisenstrasse 3
80335 München / DE
Application number, filing date06026353.019.12.2006
[2007/25]
Priority number, dateCN2005112100319.12.2005         Original published format: CN200510121003
[2007/25]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1798997
Date:20.06.2007
Language:EN
[2007/25]
Type: B1 Patent specification 
No.:EP1798997
Date:24.02.2010
Language:EN
[2010/08]
Search report(s)(Supplementary) European search report - dispatched on:EP02.05.2007
ClassificationIPC:H04W28/18, H04L12/56
[2010/08]
CPC:
H04W28/18 (EP,US); H04L47/10 (EP,US); H04L47/263 (EP,US);
H04L47/283 (EP,US); H04L47/32 (EP,US); H04W28/02 (EP);
H04W8/04 (US); H04L2012/5679 (EP,US); H04W28/22 (EP,US);
H04W92/14 (EP,US); H04W92/16 (EP,US) (-)
Former IPC [2007/25]H04Q7/30, H04L12/56
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/25]
TitleGerman:Verfahren, Vorrichtung und System zur Implementierung einer IuUP-/NBUP-Vorgangssteuerung[2009/43]
English:Method, apparatus and system for implementing luUP/NBUP procedure control[2007/25]
French:Procédé, appareil et système permettant de mettre en oeuvre un contrôle des procédures luUp/NBUP[2009/43]
Former [2007/25]Verfahren, Vorrichtung und System zur Implementierung einer LUUP-/NBUP-Vorgangssteuerung
Former [2007/25]Procédé, appareil et système permettant de mettre en ævre un contrôle des procédures luUp/NBUP
Examination procedure20.12.2007Examination requested  [2008/07]
31.01.2008Despatch of a communication from the examining division (Time limit: M04)
02.06.2008Reply to a communication from the examining division
28.10.2008Despatch of a communication from the examining division (Time limit: M06)
09.04.2009Reply to a communication from the examining division
30.06.2009Despatch of a communication from the examining division (Time limit: M04)
31.07.2009Reply to a communication from the examining division
14.08.2009Despatch of a communication from the examining division (Time limit: M04)
27.08.2009Reply to a communication from the examining division
16.10.2009Communication of intention to grant the patent
19.11.2009Fee for grant paid
19.11.2009Fee for publishing/printing paid
Opposition(s)25.11.2010No opposition filed within time limit [2011/05]
Fees paidRenewal fee
10.12.2008Renewal fee patent year 03
29.12.2009Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT24.02.2010
BE24.02.2010
CY24.02.2010
CZ24.02.2010
DK24.02.2010
EE24.02.2010
FI24.02.2010
IT24.02.2010
LT24.02.2010
LV24.02.2010
NL24.02.2010
PL24.02.2010
RO24.02.2010
SE24.02.2010
SI24.02.2010
SK24.02.2010
TR24.02.2010
BG24.05.2010
GR25.05.2010
ES04.06.2010
IS24.06.2010
PT25.06.2010
HU25.08.2010
[2012/47]
Former [2012/42]AT24.02.2010
BE24.02.2010
CY24.02.2010
CZ24.02.2010
DK24.02.2010
EE24.02.2010
FI24.02.2010
IT24.02.2010
LT24.02.2010
LV24.02.2010
NL24.02.2010
PL24.02.2010
RO24.02.2010
SE24.02.2010
SI24.02.2010
SK24.02.2010
BG24.05.2010
GR25.05.2010
ES04.06.2010
IS24.06.2010
PT25.06.2010
HU25.08.2010
Former [2011/16]AT24.02.2010
BE24.02.2010
CY24.02.2010
CZ24.02.2010
DK24.02.2010
EE24.02.2010
FI24.02.2010
IT24.02.2010
LT24.02.2010
LV24.02.2010
NL24.02.2010
PL24.02.2010
RO24.02.2010
SE24.02.2010
SI24.02.2010
SK24.02.2010
BG24.05.2010
GR25.05.2010
ES04.06.2010
IS24.06.2010
PT25.06.2010
Former [2011/09]AT24.02.2010
BE24.02.2010
CY24.02.2010
CZ24.02.2010
DK24.02.2010
EE24.02.2010
FI24.02.2010
LT24.02.2010
LV24.02.2010
NL24.02.2010
PL24.02.2010
RO24.02.2010
SE24.02.2010
SI24.02.2010
SK24.02.2010
BG24.05.2010
GR25.05.2010
ES04.06.2010
IS24.06.2010
PT25.06.2010
Former [2011/03]AT24.02.2010
BE24.02.2010
CY24.02.2010
CZ24.02.2010
EE24.02.2010
FI24.02.2010
LT24.02.2010
LV24.02.2010
NL24.02.2010
PL24.02.2010
RO24.02.2010
SE24.02.2010
SI24.02.2010
SK24.02.2010
BG24.05.2010
GR25.05.2010
ES04.06.2010
IS24.06.2010
PT25.06.2010
Former [2010/45]AT24.02.2010
FI24.02.2010
LT24.02.2010
LV24.02.2010
NL24.02.2010
PL24.02.2010
SI24.02.2010
IS24.06.2010
PT25.06.2010
Former [2010/41]AT24.02.2010
FI24.02.2010
LT24.02.2010
LV24.02.2010
PL24.02.2010
SI24.02.2010
IS24.06.2010
PT25.06.2010
Documents cited:Search[A]WO0191489  (ERICSSON TELEFON AB L M [SE], et al) [A] 1-31 * abstract ** page 4, line 25 - page 11, line 11 *;
 [A]WO02054658  (ERICSSON TELEFON AB L M [SE]) [A] 1-31 * page 1, line 32 - page 4, line 20 * * page 6, line 17 - page 8, line 13 * * page 9, line 5 - line 32 * * page 12, line 1 - line 6 *;
 [XAY]US2003128686  (HUR NAM CHUN [KR]) [X] 1,3,4,9,18,20,25 * abstract * * page 1, paragraph 4 - paragraph 16 * * page 2, paragraph 18 - page 3, paragraph 34 * * page 4, paragraph 40 - paragraph 42 * * figure 1 * [A] 5-8,21-24 [Y] 2,10-17,19,26-31;
 [DYA]  - "Universal Mobile Telecommunications System (UMTS)", ETSI STANDARDS, EUROPEAN TELECOMMUNICATIONS STANDARDS INSTITUTE, SOPHIA-ANTIPO, FR, (200503), vol. 3-R3, no. V620, ISSN 0000-0001, XP014027686 [DY] 2,10-17,19,26-31 * page 10, paragraph 4.1 - page 12, paragraph 4.2 * * page 14, paragraph 6.1 - page 17, paragraph 6.4.3 * * page 19, paragraph 6.5.1 - page 27, paragraph 6.5.4.2 * * page 28, paragraph 6.6.1 - page 39, paragraph 6.6.3.14 * * page 51, paragraph 8.1 - page 53, paragraph 8.1.4 * * page 58, paragraph B.2 - page 59, paragraph B.2.3 * * page 61, paragraphs ANNEX-D * [A] 5-8,21-24
by applicantUS2003128686
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.