blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1767265

EP1767265 - Fuel reforming apparatus heated by a burner [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  04.08.2017
Database last updated on 19.10.2024
FormerExamination is in progress
Status updated on  02.05.2017
Most recent event   Tooltip04.08.2017Application deemed to be withdrawnpublished on 06.09.2017  [2017/36]
Applicant(s)For all designated states
Samsung SDI Co., Ltd.
673-7, Maetan-dong
Yeongtong-gu
Suwon-si
Gyeonggi-do / KR
[N/P]
Former [2009/23]For all designated states
Samsung SDI Co., Ltd.
673-7, Maetan-dong Yeongtong-gu Suwon-si
Gyeonggi-do / KR
Former [2007/13]For all designated states
Samsung SDI Co., Ltd.
575, Shin-dong, Yeongtong-gu Suwon-si
Gyeonggi-do / KR
Inventor(s)01 / Lee, Sung-Chul Legal & IP Team
Samsung SDI Co., Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
02 / Gorobinskiy, Leonid Legal & IP Team
Samsung SDI Co., Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
03 / Ahn, Jin-Goo Legal & IP Team
Samsung SDI Co., Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
04 / Kim, Jin-Kwang Legal & IP Team
Samsung SDI Co., Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
05 / Suh, Dong-Myung Legal & IP Team
Samsung SDI Co., Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
06 / Lee, Chan-Ho Legal & IP Team
Samsung SDI Co., Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
07 / Kim, Ju-Yong Legal & IP Team
Samsung SDI Co. Ltd 428-5, Gongsae-dong
Kiheung-gu Yongin-si Kyunggi-do / KR
 [2007/13]
Representative(s)Walaski, Jan Filip, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[N/P]
Former [2007/51]Walaski, Jan Filip, et al
Venner Shipley LLP 20 Little Britain
London EC1A 7DH / GB
Former [2007/13]Read, Matthew Charles, et al
Venner Shipley LLP 20 Little Britain
London EC1A 7DH / GB
Application number, filing date06121363.327.09.2006
[2007/13]
Priority number, dateKR2005008981727.09.2005         Original published format: KR 20050089817
KR2005009851619.10.2005         Original published format: KR 20050098516
[2007/13]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1767265
Date:28.03.2007
Language:EN
[2007/13]
Type: A3 Search report 
No.:EP1767265
Date:25.07.2007
[2007/30]
Search report(s)(Supplementary) European search report - dispatched on:EP25.06.2007
ClassificationIPC:B01J8/02, C01B3/38, // H01M8/04
[2007/13]
CPC:
C01B3/323 (EP,US); B01J8/0214 (EP,US); B01J8/0257 (EP,US);
B01J8/0285 (EP,US); C01B3/384 (EP,US); F28D7/103 (EP,US);
F28D7/12 (EP,US); H01M8/0618 (EP,US); B01J2208/00309 (EP,US);
B01J2208/00495 (EP,US); B01J2208/00504 (EP,US); B01J2208/00646 (EP,US);
B01J2208/00716 (EP,US); C01B2203/0233 (EP,US); C01B2203/066 (EP,US);
C01B2203/0811 (EP,US); C01B2203/0816 (EP,US); C01B2203/1011 (EP,US);
C01B2203/1058 (EP,US); C01B2203/107 (EP,US); C01B2203/1076 (EP,US);
F28D2021/0022 (EP,US); F28D2021/0043 (EP,US); H01M2008/1095 (EP,US);
Y02E60/32 (US); Y02E60/50 (EP) (-)
Designated contracting statesDE,   FR,   GB [2008/14]
Former [2007/13]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Reformierungsvorrichtung erhitzt mit einem Brenner[2007/13]
English:Fuel reforming apparatus heated by a burner[2007/13]
French:Appareillage de réformage chauffé par un bruleur[2007/13]
Examination procedure27.09.2006Examination requested  [2007/13]
30.08.2007Amendment by applicant (claims and/or description)
26.01.2008Loss of particular rights, legal effect: designated state(s)
29.02.2008Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DK, EE, ES, FI, GR, HU, IE, IS, IT, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR
08.05.2009Despatch of a communication from the examining division (Time limit: M06)
23.09.2009Reply to a communication from the examining division
12.01.2012Despatch of a communication from the examining division (Time limit: M04)
22.05.2012Reply to a communication from the examining division
01.04.2017Application deemed to be withdrawn, date of legal effect  [2017/36]
03.05.2017Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2017/36]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.05.2009
Fees paidRenewal fee
17.09.2008Renewal fee patent year 03
16.09.2009Renewal fee patent year 04
16.09.2010Renewal fee patent year 05
20.09.2011Renewal fee patent year 06
19.09.2012Renewal fee patent year 07
17.09.2013Renewal fee patent year 08
18.09.2014Renewal fee patent year 09
17.09.2015Renewal fee patent year 10
Penalty fee
Additional fee for renewal fee
30.09.201611   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]US5032365  (AONO ATSUSHI [JP], et al) [Y] 10-12,15 * abstract * * column 6, line 26 - line 36; figure 6 * * column 1, line 38 - line 53; figure 1 *;
 [XA]WO0022690  (NORTHWEST POWER SYS LLC [US], et al) [X] 7 * abstract * * page 9, line 4 - line 19; figure 3 * [A] 1-6,8,9,11-15;
 [X]US2003054213  (ISHIKAWA TAKASHI [JP]) [X] 1-9,11-15 * abstract * * page 2, paragraph 31 - page 3, paragraph 41; figure 1 *;
 [Y]US2003192251  (EDLUND DAVID J [US], et al) [Y] 10-12,15 * abstract * * page 5, paragraph 56; figure 6 * * page 6, paragraph 63; figure 8 *;
 [X]US2004126288  (FUJU AKIRA [JP], et al) [X] 1-9,11-15 * abstract * * page 4, paragraph 51 - paragraph 53; figure 1 * * paragraph [0057] - paragraph [0059]; figure 3 *;
 [XA]WO2005000737  (EBARA BALLARD CORP [JP], et al) [X] 4-6,11-15 * abstract * * figure 1 * [A] 1-3,7-10;
 [X]EP1538126  (MATSUSHITA ELECTRIC IND CO LTD [JP]) [X] 1-9,11-15 * abstract * * page 14, paragraph 67 - page 15, paragraph 71; figure 3 *;
 [X]WO2005077823  (MATSUSHITA ELECTRIC IND CO LTD [JP], et al) [X] 1-15 * abstract * * figure 8 * * figure 9 *;
 [A]WO2005084771  (WS REFORMER [DE], et al) [A] 10,12-15 * abstract ** page 6, line 8 - page 7, line 5; figure 1 *;
 [PX]EP1619166  (SAMSUNG SDI CO LTD [KR]) [PX] 1-9,11-15 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.