blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1790851

EP1790851 - Windpark control system [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  11.11.2011
Database last updated on 22.05.2024
Most recent event   Tooltip11.11.2011Application deemed to be withdrawnpublished on 14.12.2011  [2011/50]
Applicant(s)For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady, NY 12345 / US
[N/P]
Former [2008/38]For all designated states
GENERAL ELECTRIC COMPANY
1 River Road
Schenectady NY 12345 / US
Former [2007/22]For all designated states
General Electric Company
One River Road
Schenectady, NY 12345 / US
Inventor(s)01 / SCHRAM, Christian
Gollierstrasse 20
80339, Muenchen / DE
02 / VYAS, Parag
Erich-Kaestner Strasse 21
80796, Muenchen / DE
 [2007/22]
Representative(s)Bedford, Grant Richard
GPO Europe
GE International Inc. The Ark
201 Talgarth Road
Hammersmith
London W6 8BJ / GB
[N/P]
Former [2008/38]Bedford, Grant Richard
GE London Patent Operation 15 John Adam Street
London WC2N 6LU / GB
Former [2007/22]Bedford, Grant Richard
London Patent Operation GE International Inc 15 John Adam Street
London WC2N 6LU / GB
Application number, filing date06124885.228.11.2006
[2007/22]
Priority number, dateUS2005028808129.11.2005         Original published format: US 288081
[2007/22]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1790851
Date:30.05.2007
Language:EN
[2007/22]
ClassificationIPC:F03D7/04
[2007/22]
CPC:
F03D7/048 (EP,US); F03D7/0224 (EP,US); F03D7/0276 (EP,US);
F03D7/0292 (EP,US); F05B2240/96 (EP,US); F05B2260/70 (EP,US);
F05B2260/821 (EP,US); F05B2270/101 (EP,US); F05B2270/1095 (EP,US);
F05B2270/204 (EP); F05B2270/32 (EP,US); F05B2270/321 (EP,US);
F05B2270/328 (EP,US); F05B2270/329 (EP,US); F05B2270/331 (EP,US);
F05B2270/335 (EP,US); Y02E10/72 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2007/22]
Extension statesALNot yet paid
BANot yet paid
HRNot yet paid
MKNot yet paid
RSNot yet paid
TitleGerman:Steuerungssystem für einen Windpark[2007/22]
English:Windpark control system[2007/22]
French:Système de commande de parc d'éoliennes[2007/22]
Examination procedure01.06.2011Application deemed to be withdrawn, date of legal effect  [2011/50]
18.07.2011Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2011/50]
Fees paidRenewal fee
01.12.2008Renewal fee patent year 03
30.11.2009Renewal fee patent year 04
Penalty fee
Additional fee for renewal fee
30.11.201005   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.