blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1795842

EP1795842 - Apparatus for conditioning of organic materials [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.02.2011
Database last updated on 18.10.2024
Most recent event   Tooltip13.09.2013Lapse of the patent in a contracting state
Updated state(s): BG
published on 16.10.2013  [2013/42]
Applicant(s)For all designated states
International Tobacco Machinery Poland Sp. z o.o.
ul. Warsztatowa 19a
26-600 Radom / PL
[2010/02]
Former [2007/24]For all designated states
International Tobacco Machinery Poland Ltd
ul. Warsztatowa 19A, P.O. Box 113
26 600 Radom / PL
Inventor(s)01 / Sieredzinski, Marek
International Tobacco Machinery Poland Ltd.
ul. Zeromskiego 34 m.4 26-600 Radom / PL
 [2007/24]
Representative(s)Ludwicka, Izabela
Patpol Sp. z.o.o.
ul. Nowoursynowska 162 J
02-776 Warszawa / PL
[N/P]
Former [2007/24]Ludwicka, Izabela
Patpol Sp. z.o.o. ul. Nowoursynowska 162 J
02-776 Warszawa / PL
Application number, filing date06125432.205.12.2006
[2007/24]
Priority number, datePL2005037828606.12.2005         Original published format: PL 37828605
[2007/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP1795842
Date:13.06.2007
Language:EN
[2007/24]
Type: B1 Patent specification 
No.:EP1795842
Date:07.04.2010
Language:EN
[2010/14]
Search report(s)(Supplementary) European search report - dispatched on:EP19.03.2007
ClassificationIPC:F26B17/10, A24B3/04
[2007/24]
CPC:
A24B3/04 (EP,US); F26B17/107 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   NL,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2008/16]
Former [2008/08](deleted) 
Former [2007/24]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Vorrichtung zur Konditionierung von organischen Materialien[2007/24]
English:Apparatus for conditioning of organic materials[2007/24]
French:Appareil de conditionnement de matières organiques[2007/24]
Examination procedure29.02.2008Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time
04.03.2008Examination requested  [2008/16]
25.04.2008Despatch of a communication from the examining division (Time limit: M04)
29.08.2008Reply to a communication from the examining division
25.11.2009Communication of intention to grant the patent
23.02.2010Fee for grant paid
23.02.2010Fee for publishing/printing paid
Opposition(s)10.01.2011No opposition filed within time limit [2011/11]
Request for further processing for:The application is deemed to be withdrawn due to non-payment of the examination fee
04.03.2008Request for further processing filed
04.03.2008Full payment received (date of receipt of payment)
Request granted
02.04.2008Decision despatched
The application is deemed to be withdrawn due to non-payment of designation fees
TR, SK, SI, SE, RO, PT, PL, NL, MC, LV, LU, LT, IT, IS, IE, HU, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT
04.03.2008Request for further processing filed
04.03.2008Full payment received (date of receipt of payment)
Request granted
02.04.2008Decision despatched
Fees paidRenewal fee
30.12.2008Renewal fee patent year 03
30.11.2009Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT07.04.2010
BE07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
TR07.04.2010
CY12.05.2010
BG07.07.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
HU08.10.2010
IE05.12.2010
LU05.12.2010
CH31.12.2010
LI31.12.2010
MC31.12.2010
FR03.01.2011
[2013/42]
Former [2012/47]AT07.04.2010
BE07.04.2010
BG07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
TR07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
HU08.10.2010
IE05.12.2010
LU05.12.2010
CH31.12.2010
LI31.12.2010
MC31.12.2010
FR03.01.2011
Former [2012/44]AT07.04.2010
BE07.04.2010
BG07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
HU08.10.2010
IE05.12.2010
LU05.12.2010
CH31.12.2010
LI31.12.2010
MC31.12.2010
FR03.01.2011
Former [2012/42]AT07.04.2010
BE07.04.2010
BG07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
HU08.10.2010
IE05.12.2010
CH31.12.2010
LI31.12.2010
MC31.12.2010
FR03.01.2011
Former [2012/41]AT07.04.2010
BE07.04.2010
BG07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
IE05.12.2010
CH31.12.2010
LI31.12.2010
MC31.12.2010
FR03.01.2011
Former [2011/47]AT07.04.2010
BE07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
IE05.12.2010
CH31.12.2010
LI31.12.2010
MC31.12.2010
FR03.01.2011
Former [2011/36]AT07.04.2010
BE07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
MC31.12.2010
Former [2011/13]AT07.04.2010
BE07.04.2010
CZ07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
RO07.04.2010
SE07.04.2010
SI07.04.2010
SK07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
Former [2011/09]AT07.04.2010
DK07.04.2010
EE07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
SE07.04.2010
SI07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
PT09.08.2010
Former [2011/03]AT07.04.2010
FI07.04.2010
LT07.04.2010
LV07.04.2010
NL07.04.2010
SE07.04.2010
SI07.04.2010
CY12.05.2010
GR08.07.2010
ES18.07.2010
IS07.08.2010
Former [2010/45]NL07.04.2010
SI07.04.2010
Former [2010/41]SI07.04.2010
Documents cited:Search[X]US4532155  (GOLANT VICTOR [US], et al) [X] 1,2 * the whole document *;
 [X]WO8900014  (GBE INTERNATIONAL PLC [GB]) [X] 1,2 * page 10, line 7 - page 12, line 8; figure - *;
 [X]EP0871003  (NARA MACHINERY CO LTD [JP]) [X] 1-3 * the whole document *;
 [X]WO9923898  (MASTROLILLI ANNA [IT]) [X] 1,2 * the whole document *;
 [A]US6158145  (LANDON FRANK D [US], et al) [A] 1,3* figure 2 *;
 [X]GB2355058  (J E ELSWORTH LTD [GB], et al) [X] 1-3 * the whole document *;
 [A]WO03047360  (MARS INC [US]) [A] 1,3 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.