blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP1830279

EP1830279 - Network interface controlling lock operation and method of operating the network [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.01.2011
Database last updated on 24.04.2024
Most recent event   Tooltip21.01.2011No opposition filed within time limitpublished on 23.02.2011  [2011/08]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd
416, Maetan-dong
Yeongtong-gu
Suwon-si, Gyeonggi-do 443-742 / KR
[N/P]
Former [2007/36]For all designated states
Samsung Electronics Co., Ltd
416, Maetan-dong Yeongtong-gu
Suwon-si, Gyeonggi-do 443-742 / KR
Inventor(s)01 / Lee, Beom Hak
No. 401, 414-3, Mangwon-dong Mapo-gu
Seoul 121-230 / KR
02 / Kim, Eui Seok
No. 207-701, Samsung Apt. Yuljeon-dong Jangan-gu
Suwon-si Gyeonggi-do 440-705 / KR
03 / Rhim, Sang Woo
No. 101-1003, Doosan Weve Apt., 252-1 Nonhyeon-dong
Gangnam-gu Seoul 135-010 / KR
 [2009/26]
Former [2007/36]01 / Lee, Beom Hak
No. 401, 414-3, Mangwon-dong Mapo-gu
Seoul 121-230 / KR
02 / Kim, Eui Seok
NO. 207-701, Samsung Apt. Yuljeon-dong Jangan-gu
Suwon-si Gyeonggi-do 440-705 / KR
03 / Rhim, Sang Woo
101-1003, Doosan Weve Apt., 252-1 Nonhyeon-dong
Gangnam-gu Seoul 135-010 / KR
Representative(s)Greene, Simon Kenneth
Elkington and Fife LLP
Prospect House
8 Pembroke Road
Sevenoaks, Kent TN13 1XR / GB
[N/P]
Former [2010/03]Greene, Simon Kenneth
Elkington and Fife LLP Prospect House 8 Pembroke Road Sevenoaks
Kent TN13 1XR / GB
Former [2007/36]Greene, Simon Kenneth
Elkington and Fife LLP Prospect House 8 Pembroke Road
Sevenoaks, Kent TN13 1XR / GB
Application number, filing date06253821.020.07.2006
[2007/36]
Priority number, dateKR2005012755822.12.2005         Original published format: KR 20050127558
[2007/36]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP1830279
Date:05.09.2007
Language:EN
[2007/36]
Type: A3 Search report 
No.:EP1830279
Date:12.12.2007
[2007/50]
Type: B1 Patent specification 
No.:EP1830279
Date:17.03.2010
Language:EN
[2010/11]
Search report(s)(Supplementary) European search report - dispatched on:EP12.11.2007
ClassificationIPC:G06F13/42, G06F13/38
[2007/49]
CPC:
G06F13/385 (EP,US); G06F13/38 (KR); H04L2012/5603 (KR)
Former IPC [2007/36]G06F13/38
Designated contracting statesGB [2008/34]
Former [2007/36]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  NL,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Netzwerkschnittstelle zur Verriegelungsoperationssteuerung und Verfahren dafür[2007/36]
English:Network interface controlling lock operation and method of operating the network[2007/36]
French:Interface de réseau pour commander une opération de verrouillage et méthode associée[2007/36]
Examination procedure02.08.2006Examination requested  [2007/36]
07.05.2008Despatch of a communication from the examining division (Time limit: M06)
13.06.2008Loss of particular rights, legal effect: designated state(s)
17.07.2008Despatch of communication of loss of particular rights: designated state(s) AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GR, HU, IE, IS, IT, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR
04.11.2008Reply to a communication from the examining division
03.06.2009Communication of intention to grant the patent
20.11.2009Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
27.01.2010Fee for grant paid
27.01.2010Fee for publishing/printing paid
Opposition(s)20.12.2010No opposition filed within time limit [2011/08]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
27.01.2010Request for further processing filed
27.01.2010Full payment received (date of receipt of payment)
Fees paidRenewal fee
31.07.2008Renewal fee patent year 03
27.07.2009Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO2005103934  (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 1-16 * page 5, line 3 - line 11 * * page 8, line 25 - page 9, line 27 *;
 [A]  - ARM LIMITED, "PrimeCell® AXI Configurable Interconnect (PL300)", TECHNICAL REFERENCE MANUAL, (20051026), pages I - 2-13, URL: http://infocenter.arm.com/help/topic/com.arm.doc.ddi0354b/DDI0354.pdf, (20071008), XP002454110 [A] 1-16 * paragraph [2.1.6] *
 [A]  - ARM, "AMBA AXI PROTOCOL V1.0 SPECIFICATION", INTERNET CITATION, (2003), URL: http://www.arm.com/products/solutions/axi_spec.html, (20050824), XP002342105 [A] 1-16 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.