EP1770953 - SYSTEM AND METHOD FOR PROVIDING ACCESS TO WIRELESS RAILROAD DATA NETWORK [Right-click to bookmark this link] | |||
Former [2007/14] | System and method for providing access to wireless railroad data network | ||
[2018/15] | Status | No opposition filed within time limit Status updated on 03.07.2020 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 07.06.2019 | ||
Former | Grant of patent is intended Status updated on 14.03.2018 | ||
Former | Request for examination was made Status updated on 23.12.2016 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states ALSTOM Transport Technologies 48, rue Albert Dhalenne 93400 Saint-Ouen / FR | [2019/28] |
Former [2016/42] | For all designated states ALSTOM Transport Technologies 48 rue Albert Dhalenne 93400 Saint-Ouen / FR | ||
Former [2008/38] | For all designated states GENERAL ELECTRIC COMPANY 1 River Road Schenectady NY 12345 / US | ||
Former [2007/14] | For all designated states General Electric Company One River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
Davenport, David Michael 2508 Antonia Drive Niskayuna, NY 12309 / US | [2007/14] | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2019/28] |
Former [2009/36] | Illingworth-Law, William Illingworth, et al Global Patent Operation - Europe GE International Inc. 15 John Adam Street London WC2N 6LU / GB | ||
Former [2007/14] | Illingworth-Law, William Illingworth, et al GE International Inc. London Patent Operation 15 John Adam Street London WC2N 6LU / GB | Application number, filing date | 06254933.2 | 25.09.2006 | [2007/14] | Priority number, date | US20050239861 | 30.09.2005 Original published format: US 239861 | [2007/14] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP1770953 | Date: | 04.04.2007 | Language: | EN | [2007/14] | Type: | A3 Search report | No.: | EP1770953 | Date: | 29.06.2016 | Language: | EN | [2016/26] | Type: | B1 Patent specification | No.: | EP1770953 | Date: | 10.07.2019 | Language: | EN | [2019/28] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.05.2016 | Classification | IPC: | H04L29/06, B61L15/00 | [2016/26] | CPC: |
H04L63/08 (EP,CN,US);
B61L15/0027 (EP,US);
B61L27/40 (EP,US);
B61L27/70 (EP,US);
B61L3/125 (EP,US);
H04L67/12 (EP,US);
H04W12/06 (EP,CN,US);
H04L63/10 (EP,CN,US);
H04W12/08 (EP,CN,US);
H04W12/61 (EP,US)
(-)
|
Former IPC [2007/14] | H04L29/06 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2017/17] |
Former [2017/04] | AT, BE, BG, CH, CY, LI | ||
Former [2007/14] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | SYSTEME UND VERFAHREN ZUR BEREITSTELLUNG DES ZUGRIFFS AUF EIN DRATHLOSES EISENBAHNDATENNETZWERK | [2018/15] | English: | SYSTEM AND METHOD FOR PROVIDING ACCESS TO WIRELESS RAILROAD DATA NETWORK | [2018/15] | French: | PROCÉDÉ ET MODULE D'AUTHENTIFICATION PERMETTANT L'ACCÉS À UN RÉSEAU FERROVIAIRE DE DONNÉES SANS FIL | [2018/15] |
Former [2007/14] | Systeme und Verfahren zur Bereitstellung des Zugriffs auf ein drathloses Eisenbahndatennetzwerk | ||
Former [2007/14] | System and method for providing access to wireless railroad data network | ||
Former [2007/14] | Procédé et module d'authentification permettant l'accés à un réseau ferroviaire de données sans fil | Examination procedure | 25.09.2006 | Date on which the examining division has become responsible | 16.12.2016 | Examination requested [2017/04] | 21.12.2016 | Amendment by applicant (claims and/or description) | 13.02.2017 | Despatch of communication of loss of particular rights: designated state(s) CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | 15.03.2018 | Communication of intention to grant the patent | 05.07.2018 | Fee for grant paid | 05.07.2018 | Fee for publishing/printing paid | 05.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.03.2018 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/32] | Request for further processing for: | Loss of rights: Designated contracting state(s) TR, SK, SI, SE, RO, PT, PL, NL, MC, LV, LU, LT, IT, IS, IE, HU, GR, GB, FR, FI, ES, EE, DK, DE, CZ | 15.03.2017 | Request for further processing filed | 15.03.2017 | Full payment received (date of receipt of payment) Request granted | 25.03.2017 | Decision despatched | Fees paid | Renewal fee | 30.09.2008 | Renewal fee patent year 03 | 30.09.2009 | Renewal fee patent year 04 | 30.09.2010 | Renewal fee patent year 05 | 30.09.2011 | Renewal fee patent year 06 | 01.10.2012 | Renewal fee patent year 07 | 30.09.2013 | Renewal fee patent year 08 | 30.09.2014 | Renewal fee patent year 09 | 30.09.2015 | Renewal fee patent year 10 | 28.09.2016 | Renewal fee patent year 11 | 24.08.2017 | Renewal fee patent year 12 | 31.08.2018 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.09.2006 | AT | 10.07.2019 | CY | 10.07.2019 | CZ | 10.07.2019 | DK | 10.07.2019 | EE | 10.07.2019 | ES | 10.07.2019 | FI | 10.07.2019 | LT | 10.07.2019 | LV | 10.07.2019 | MC | 10.07.2019 | PL | 10.07.2019 | RO | 10.07.2019 | SE | 10.07.2019 | SI | 10.07.2019 | SK | 10.07.2019 | TR | 10.07.2019 | IE | 25.09.2019 | LU | 25.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | BG | 10.10.2019 | GR | 11.10.2019 | IS | 10.11.2019 | PT | 11.11.2019 | [2021/32] |
Former [2021/26] | AT | 10.07.2019 | |
CY | 10.07.2019 | ||
CZ | 10.07.2019 | ||
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
SI | 10.07.2019 | ||
SK | 10.07.2019 | ||
TR | 10.07.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/37] | AT | 10.07.2019 | |
CZ | 10.07.2019 | ||
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
SI | 10.07.2019 | ||
SK | 10.07.2019 | ||
TR | 10.07.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/36] | AT | 10.07.2019 | |
CZ | 10.07.2019 | ||
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
SK | 10.07.2019 | ||
TR | 10.07.2019 | ||
IE | 25.09.2019 | ||
LU | 25.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/35] | AT | 10.07.2019 | |
CZ | 10.07.2019 | ||
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
SK | 10.07.2019 | ||
TR | 10.07.2019 | ||
LU | 25.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
PT | 11.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/34] | AT | 10.07.2019 | |
CZ | 10.07.2019 | ||
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
SK | 10.07.2019 | ||
TR | 10.07.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
PT | 11.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AT | 10.07.2019 | |
CZ | 10.07.2019 | ||
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
SK | 10.07.2019 | ||
TR | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
PT | 11.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 10.07.2019 | |
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
MC | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
TR | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
PT | 11.11.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AT | 10.07.2019 | |
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
PL | 10.07.2019 | ||
RO | 10.07.2019 | ||
SE | 10.07.2019 | ||
TR | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/22] | AT | 10.07.2019 | |
DK | 10.07.2019 | ||
EE | 10.07.2019 | ||
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
SE | 10.07.2019 | ||
TR | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/17] | AT | 10.07.2019 | |
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
SE | 10.07.2019 | ||
TR | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/12] | AT | 10.07.2019 | |
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
SE | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
IS | 10.11.2019 | ||
PT | 11.11.2019 | ||
Former [2020/11] | AT | 10.07.2019 | |
ES | 10.07.2019 | ||
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
LV | 10.07.2019 | ||
SE | 10.07.2019 | ||
BG | 10.10.2019 | ||
GR | 11.10.2019 | ||
PT | 11.11.2019 | ||
Former [2020/10] | AT | 10.07.2019 | |
FI | 10.07.2019 | ||
LT | 10.07.2019 | ||
SE | 10.07.2019 | ||
BG | 10.10.2019 | ||
PT | 11.11.2019 | ||
Former [2020/09] | FI | 10.07.2019 | |
LT | 10.07.2019 | ||
Former [2020/08] | LT | 10.07.2019 | Documents cited: | Search | [A]WO0126334 (SENSORIA CORP [US], et al) [A] 1-10 * page 66, line 15 - line 21 * * page 58, line 12 - line 23 * * page 68, line 12 - line 23 * * page 110, line 28 - page 111, line 29 ** page 114, line 18 - page 115, line 27 *; | [X]CN2721477Y (BEIJING COMM UNIV [CN]) [X] 1-10 * page 6, line 10 - line 31 * |